• Title/Summary/Keyword: KPIs

Search Result 55, Processing Time 0.025 seconds

Key Performance Indicators for Project Management Performance of Large Contractors in Developing Countries: A Case Study in Vietnam

  • Soo-Yong Kim;Troung-Van Luu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1599-1607
    • /
    • 2009
  • In order to deal with severe competition in the construction market of developing countries, large contractors must continually improve their own performance and operation. Performance measurement is the heart of ceaseless improvement in organizations. Key performance indicators (KPIs) play a key role in measuring project management performance (PMP) of large contractors in developing countries. The main objective of this paper is to identify KPIs, which can be used to measure PMP of contractors, and then analyze the underlying relationships of these KPIs in order to gain insight into PMP of large construction firms in Vietnam construction industry (VCI). Literature reviews and the pilot survey provided 30 KPIs. Fourteen KPIs, which have the mean values higher than 3.0, were considered as important KPIs through a questionnaire survey of 32 professionals. Factor analysis of these KPIs was employed to categorize them. The results of the survey revealed that top six KPIs are construction time and cost, owner satisfaction on services and products, and quality management and project team performance. Factor analysis uncovered that 14 top-ranked KPIs can be grouped under six categories, namely: (1) construction input management, (2) owner satisfaction, (3) cost and quality, (4) manpower management, (5) subcontractor performance and (6) equipment management. The findings of this research can be used as a guideline to measure PMP of contractors in Vietnam as well as in other developing countries. Since contractors from a country to the other country may have the same manner to manage construction projects, the results of this study may be useful not only to practitioners and researchers in Vietnam but also to participants in other developing countries.

  • PDF

Basic Research to Establish a Key Performance Indicator(KPI) System of Earthworks during Construction Project (건설공사 중 토공사의 핵심 지표 체계(KPI) 구축을 위한 기초연구)

  • Jung, Yong-Il;Lee, Chanwoo;Kang, Kyung-In;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.85-86
    • /
    • 2021
  • KPI, an indicator that measures the performance of factors that contribute to achieving strategies of individuals or organizations, is used a lot to analyze the performance of construction work. Construction work consists of individual construction types with different characteristics such as progress method, scale, and input resources, but currently, KPIs for performance analysis of individual construction types are lacking. Therefore, this study aims to obtain and analyze data for establishing construction performance analysis KPIs during construction work to prepare the basis for the creation of future construction KPIs. Preliminary KPIs for earthwork performance analysis selected through this study are expected to be the basis for deriving preliminary KPIs for other individual construction types.

  • PDF

Development and Application of a Performance Prediction Model for Home Care Nursing Based on a Balanced Scorecard using the Bayesian Belief Network (Bayesian Belief Network 활용한 균형성과표 기반 가정간호사업 성과예측모델 구축 및 적용)

  • Noh, Wonjung;Seomun, GyeongAe
    • Journal of Korean Academy of Nursing
    • /
    • v.45 no.3
    • /
    • pp.429-438
    • /
    • 2015
  • Purpose: This study was conducted to develop key performance indicators (KPIs) for home care nursing (HCN) based on a balanced scorecard, and to construct a performance prediction model of strategic objectives using the Bayesian Belief Network (BBN). Methods: This methodological study included four steps: establishment of KPIs, performance prediction modeling, development of a performance prediction model using BBN, and simulation of a suggested nursing management strategy. An HCN expert group and a staff group participated. The content validity index was analyzed using STATA 13.0, and BBN was analyzed using HUGIN 8.0. Results: We generated a list of KPIs composed of 4 perspectives, 10 strategic objectives, and 31 KPIs. In the validity test of the performance prediction model, the factor with the greatest variance for increasing profit was maximum cost reduction of HCN services. The factor with the smallest variance for increasing profit was a minimum image improvement for HCN. During sensitivity analysis, the probability of the expert group did not affect the sensitivity. Furthermore, simulation of a 10% image improvement predicted the most effective way to increase profit. Conclusion: KPIs of HCN can estimate financial and non-financial performance. The performance prediction model for HCN will be useful to improve performance.

A Study on the Information Technology Performance Evaluation Model (정보기술 성과 평가 모델에 관한 연구)

  • Choi, Gyun-Hyun;Nam, Ji-Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.3
    • /
    • pp.121-132
    • /
    • 2005
  • Nowadays, Information Technology(IT) has become one of the most critical managerial decision areas, because its role in the business practice tends to be more important and hence the amount of the investment in growing. Since there is no dominant and promising measure to evaluate the IT performance, the managements have difficulties on the decision process for IT investment. In this paper, we propose an IT performance evaluation model. The proposed model starts with finding the business performance evaluation areas and the corresponding KPIs, and then concentrates on the IT performance evaluation areas corresponding to the business performance evaluation areas. To extract the specific and reliable KPIs for the IT performance measure, we map the business performance evaluation areas into the corresponding IT performance evaluation areas and then combine and adjust these KPIs with the KPIs obtained from the experiential field interview. Finally, We present the complete model which has 11 business performance indices and 48 IT performance indices are completed.

Development of Nursing Key Performance Indicators for an Intensive Care Unit by using a Balanced Scorecard (균형성과표를 이용한 중환자실 간호부서의 핵심성과지표 개발)

  • Choi, Yun-Jeong;Lim, Ji-Young;Lee, Young-Whee;Kim, Hwa-Soon
    • Journal of Korean Academy of Nursing
    • /
    • v.38 no.5
    • /
    • pp.656-666
    • /
    • 2008
  • Purpose: The purpose of this study was to develop visions of nursing service, nursing strategies and key performance indicators (KPIs) for an intensive care unit (ICU) based on a Balanced Scorecard (BSC). Methods: This study was undertaken by using methodological research. The development process consisted of four phases; the first phase was to develop the vision of nursing in ICUs. The second phase was to develop strategies according to 4 perspectives of a BSC. The third phase was to develop KPIs according to the 4 perspectives of BSC and the final phase was to combine the nursing visions, strategies and KPIs of ICUs. Results: Two main visions of nursing service for ICUs were established. These were 'realization of harmonized professional nursing with human respect' and 'recovery of health through specialized nursing' respectively. In order to reach the aim of developing nursing visions, thirteen practical strategies and nineteen KPIs were developed by four perspectives of the BSC. Conclusion: The results will be used as objective fundamental data to attain business outcomes for the achievement of nursing visions and strategies of ICUs.

The Effect of BSC Implementation on Restaurant Managers' Perception of KPIs (BSC 활용이 외식업 점장의 핵심성과지표 인식에 미치는 영향)

  • Jang, Ki-Ryong;Lim, Hyun-Jung
    • Journal of the Korean Society of Food Culture
    • /
    • v.24 no.5
    • /
    • pp.486-495
    • /
    • 2009
  • The purpose of this research was to investigate whether the perception of KPIs by restaurant managers from financial and non-financial perspectives was affected by BSC implementation. The perceptions that were examined were importance, adoption, performance, and utilization of KPIs. We surveyed managers from multinational restaurant chains that were adopting BSC and those that were not. From a non-financial perspective, the difference in perceived importance between BSC adopted firms and firms that did not adopt BSC was significant. The managers of BSC adopted firms perceived KPIs more seriously than the others. Secondly, according to the managers' working experiences, the difference of perceived utilization in the internal business process perspective was significant between BSC adopted firms and firms that did not adopt BSC. In addition, from the learning and growth perspective, the difference in perceived adoption and utilization between the two groups was significant. Finally, in the BSC adopted firms, the perceived importance of the managers affected the other perceptions like adoption and utilization from both the financial and non-financial perspectives.

Deductions of KPIs for BSC and Process KPIs for BPM in Railway Construction (철도건설에서 BSC의 KPI도출과 BPM을 위한 프로세스 KPI도출)

  • Ryu Si-Wook;Ahn Byung-Jun;Ryu Myung-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.388-393
    • /
    • 2006
  • Recently, Korean government demands that public sectors like railway construction should improve their management efficiency. It is necessary for railway construction supported by government budget to aim at the companywide management efficiency. The Balanced Scorecard (BSC) is known as integrated performance management framework that helps a company to translate strategic objective info relevant performance within an organization. This paper focuses on relationship between KPIs (Key Performance Indicators) used to measure the performance of railway construction industry and process KPT for BPM (Business Process Management). Also, the vision and strategies of the railway construction is introduced, and the CSFs (Critical Success Factors) and the KPI based on BSC is developed. Finally, this paper explores that there is a possibility to fulfill the strategic objectives of railway construction industry through the connectivity between KPI based on BSC and process KPI based on BPM. We explain the detailed procedures with an example of railway construction industry.

Development of Key Performance Indicators to Implement Balanced Scorecard to Small and Medium Size Dental Clinic (중소 규모의 치과의원에 균형성과표를 적용하기 위한 핵심성과지표 개발)

  • Kim, Sangsuk;Kim, Myeng Ki;Choi, Hyungkil
    • Korea Journal of Hospital Management
    • /
    • v.22 no.1
    • /
    • pp.40-50
    • /
    • 2017
  • The purpose of this study is to develop the KPIs(Key Performance Indices) needed to improve management and strategy in the dental clinic based on the four perspectives of BSC(Balanced Scorecard). The questionnaire was conducted on 52 dentists approved by Dental Managment Research Committee in Seoul National University as a panel. Using the Delphi technique, the top five KPIs for each point of perspective in BSC were extracted from KPI pools. In the third survey, the top five KPIs of all points were compared with each other through AHP(Analytic Hierarchy Process) method, and priority and overall importance rankings were calculated. The biggest difference in the three level AHP results was the customer perspective took priority to others. In the second survey, the financial perspective, which was number one, was pushed back. The overall significance of KPIs was in the order of customer, internal process, finance, learning and growth perspective, with the exception of medical profits (5th of 20) and new patient growth (10th of 20). We were able to overcome the limitations of the Delphi Technique with the AHP method. In general, the financial perspective in BSC is known to be the most important, but we conclude that the customer perspective is more important through the pairwise comparison survey. In the current dental service market, which is a long-term recession, excessive competition, customer satisfaction and customer relationship management seem to be the first goal to pursue in dental clinic.

Development of Work Report for Evaluating KPIs of Truck Haulage Operation in Open Pit and Underground Mines (노천 및 지하 광산 트럭 운반 작업의 핵심성과지표 평가를 위한 작업 일지 개발)

  • Park, Sebeom;Choi, Yosoon
    • Tunnel and Underground Space
    • /
    • v.32 no.5
    • /
    • pp.327-343
    • /
    • 2022
  • The standard work report for trucks was developed that records data on truck haulage operations in open-pit and underground mines, and to evaluate the performance of haulage operations. Work reports used in 5 mines in Korea was secured and analyzed, and items to be included in the standard work report were determined. By analyzing the formulas for key performance indicators (KPIs) proposed by the Global Mining Guidelines Group (GMG), it was possible to determine how to record time-related data. After selecting a limestone underground mine as a research area, the performance of haulage operations was evaluated using a standard work report. As a result, in terms of truck availability, uptime was 46.7%, and both physical and mechanical availability were 100%. In the case of utilization, use of availability was 88.2%, the asset utilization was 41.1%, and operating and effective utilization were 88.2% and 79.2%, respectively. Also, in terms of efficiency, operating efficiency was found to be 89.9%.

A Study on the Development Model and Establishment of KPIs for the Realization of Social Value in Port Authority (항만공사의 사회적 가치 실현을 위한 추진모델과 평가지표 구축연구)

  • Kim, Seung-Chul;Pyo, Hee-Dong
    • Korea Trade Review
    • /
    • v.43 no.6
    • /
    • pp.193-214
    • /
    • 2018
  • The role of social value in public institutions has recently been emphasized. The purpose of this paper is to present key performance indicators(KPIs) and a development model for the realization of social value for port authorities. KPIs that could be quantitatively measured are presented with the five social value assessment indicators of the government management evaluation system for public institutions. Through the analysis of vision, mission and social value promotion strategies and stakeholders for each port authority, the concept of a customer-specific social value model is presented.