• Title/Summary/Keyword: Jacking system

Search Result 24, Processing Time 0.021 seconds

Application technique on thrust jacking pressure of shield TBM in the sharp curved tunnel alignment by model tests (축소모형실험을 통한 급곡선 터널에서의 Shield TBM 추진 압력 적용 기술에 대한 연구)

  • Kang, Si-on;Kim, Hyeob;Kim, Yong-Min;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.335-353
    • /
    • 2017
  • This paper presents the application technique on thrust jacking pressuring of shield TBM in the sharp curved tunnel alignment by model tests. Recently, the application of shield TBM method as mechanized tunnelling is increasing to prevent the vibration and noise problems, which can be occurred in the NATM in the urban area in Korea. However, it is necessary to plan the sharp curved tunnel alignment in order to avoid the building foundation and underground structures, to develop the shield TBM operation technique in the shape curved tunnel alignment. Therefore, the main operation parameters of shield TBM in the curved tunnel alignment are reviewed and analyzed based on the case study and analytical study. The results show that the operation of shield jacking force system is the most important technique in the shape curved tunnel alignment. The simplified scaled model tests are also carried out in order to examine the ground-shield TBM head behaviour. The earth pressures acting on the head of shield TBM are investigated according to two different shield jacking force systems (uniform and un-uniform pressure) and several articulation angles. The results obtained from the model tests are analysed. These results will be very useful to understand the shield TBM head interaction behaviour due to the shield jacking operation technique in the shape curved tunnel alignment, and to develop the operation technique.

Innovative Technologies and Their Application on the Construction of a 100-Plus-Story Skyscraper

  • Haowen, Ye
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.3
    • /
    • pp.161-169
    • /
    • 2015
  • Experience on the construction of several 100-plus-story skyscrapers including Guangzhou West Tower, Guangzhou East Tower, and Shenzhen's KK100 is described considering the increasingly strong development trend of 100-plus-story skyscrapers in China. Difficulties in the construction of 100-plus-story skyscrapers are investigated. Four innovative construction technologies receive detailed descriptions: intelligently and entirely-jacked work platforms, formwork and suspension scaffolding systems ("jacking and formwork systems"), multi-function low-carbon concrete, 5D-BIM ("five-dimensional building information modeling"), and safe and rapid vertical transport, as they have found successful applications in actual projects. Popularized systematically as technical achievements, these technologies will significantly influence the construction of similar projects in the future, and produce more social and economic benefits.

Applicability of Partial Post-Tension Method for Deflection Control of Reinforced Concrete Slabs (RC슬래브의 처짐제어를 위한 상향긴장식 부분PT공법의 적용)

  • Lee, Deuck-Hang;Kim, Kang-Su;Kim, Sang-Sik;Kim, Yong-Nam;Lim, Joo-Hyuk
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.3
    • /
    • pp.347-358
    • /
    • 2009
  • Recently, it is getting into a good situation for the flat-plate slab system to be applied. The flat-plate slab without beam, however, is often too weak to control deflection properly compared to other typical slab-beam structures, for which the post-tension method is generally regarded as one of best solutions. The post-tension (PT) method can effectively control deflection without increase of slab thickness. Despite this good advantage, however, the application of PT method has been very limited due to cost increase, technical problems, and lack of experiences. Therefore, in order to reduce difficulties on applying full PT method under the current domestic circumstances and to enhance constructability of PT system, this research proposed the partial PT method with top jacking anchorage applied in a part of span as need. For the top jacking anchorage system, the efficiency of deflection control shall be considered in detail because it can vary widely depending on the location of anchorage that can be placed anywhere as need, and tensile stresses induced at back of the anchorage zone also shall be examined. Therefore, in this study, analysis were performed on the efficiency of deflection control depending on the location of anchorage and on tensile stresses or forces using finite element method and strut and tie model in the proposed top jacking anchorage system. The proposed jacking system were also applied to the floor slabs at a construction site to investigate its applicability and the analysis results of slab behavior were compared to the measured values obtained from the PT slab constructed by the partial PT method. The result of this study indicates that the partial PT method can be very efficiently applied with little cost increase to control deflection and tensile stresses in the region as a need basis where problem exists.

Structural Restoration for the Electric Power Transmission Tower Damaged by Foundation Settlements (기초침하에 의해 손상된 송전철탑 구조물의 구조성능개선)

  • Lee, Ho Beom;Park, Jong Kwon;Kim, Il Soo;Jang, Il Young;Song, Jae Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.2
    • /
    • pp.83-93
    • /
    • 2013
  • Generally the capacities of electric power transmission tower's members are improved by increasing their stiffness nature through injection of grout or attachment of other structural stiffeners. Those are for upgrading their axial strength by fulfillment of proper materials into pipe members, increment of member dimension by addition of section, or a combination of the two. However the use of innovative and unusual procedures would be positively recommended for getting more stable state. It is that buckled members are replaced with lengthened and strengthened members. In providing the structural restoration procedures for the existing electric power transform tower whose main members have been damaged due to unequal foundation settlement, structural damage inspection works and numerical analyses for the damaged one and the restored one were done in detail at first. secondarily member-exchanging works using a newly-generated jacking system and strengthened members were achieved. This figures are to point clearly to inherent advantages attending the management of the towers.

Development and Field Application of Portable Tensioning System Using Segmental CFT Member (분절형 CFT부재를 이용한 이동식 프리텐션 제작대의 개발 및 활용)

  • Lee, Doo Sung;Kim, Tae Kyun;Lee, Sung Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.965-975
    • /
    • 2014
  • Pretension PSC (Prestressed Concrete) members are subjected to a certain limit of size as they are generally produced in the off-site plant and transferred to the site due to the large scale of the product on system. In this study, a portable pretensioning production system has been developed, which allow us to apply the pretension method on site. Considering that a 50m span PSC girder using the pretension method requires a pressing device to endure a large jacking force, the portable pretension production system has to ensure safety against such a large pretension jacking force. In this study, the portable pretensioning system to produce a 50m span pretension girder was manufactured by using CFT (Concrete Filled steel Tube) members. In order to understand the stability of the system and the behavior of the elements, a static loading test was conducted and the stability of the proposed portable pretensioning production system was confirmed. The developed portable pretension system was applied to several construction sites and was investigated the problems on site. During the pretension girder and slab members that was producted by this pretension system in construction site, it has be found the several advantages such as simple fabrication processes, reduction of prestress-loss, and a decrease of 15% compared with the fabrcation cost of post-tension girder. After due consideration of the problems, this portable pretension system will be improved.

Concrete Caisson Manufacturing and Transferring Apparatus and Method (II) (초대형 콘크리트 케이슨 다단계 일괄 제작 및 운반공법 개발 (II))

  • Zung, Zi-Man;Lee, Won-Pyo;Park, Jung-Min
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.400-403
    • /
    • 2004
  • In conventional methods, the availability of floating crane has determined the size of a concrete caisson. However, this paper introduces a new method for larger caisson production that make it possible to complete caisson fabrication and launch out without use of floating crane. The new method carries out multi-step fabrication of caisson and horizontal transfer of caisson on a single casting bed which consists of collapsible soffit form, trough, aero go watercaster system or low frictional PTFE added jacking system, half-submergible floating dock. To make the new method successfully launched, the static and dynamic analysis is carried out to obtain the stability of caisson launching and experimental research is conducted in evaluating friction occurred between PTFE pad and steel track. Lastly, the comparison of the new method and the conventional method are detailed. With significant benefits in construction costs reduction and construction time reduction, this new method in this paper would be recommended for extensive application in large port and harbor construction projects.

  • PDF

The Structural Engineering Design and Construction of the Highest Occupiable Skybridge in the World: The Address Jumeirah Resort, Dubai, UAE

  • Hadow, Zaher;Dannan, Yamen
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.1
    • /
    • pp.61-68
    • /
    • 2022
  • The Address Jumeirah Resort is a mixed-use 77-story tower reaching a height of 301 meters with a slenderness ratio of 13.5:1. The development is situated in the Jumeirah Beach District and accommodates 217 key five-star hotel suites, 478 residential apartments, 444 serviced-branded apartments, retail shops, ballrooms and entertainment facilities around the premises. The building has over 242,000 m2 of usable area. The project is an award-winning development that broke multiple Guinness records. The focus of the paper is to present the challenges faced in the structural design and construction of the super tall tower and the highest occupiable skybridge in the world.

Railway Underground Crossing Method Using PC Slab (직접 PC슬래브설치를 통한 철도지하횡단 공법의 적용 연구)

  • Min, Kyung-Ju;Lee, Bang-Woo;Park, Byung-Yong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2439-2449
    • /
    • 2011
  • Existing grade crossings between railway and roadway area gradually changed to grade separation systems by the law. In the case of new roadway construction which crosses railways, it shall be grade separation system in principle. With the railway underground crossing method, many practices have been developed which can minimize rail displacements and avoid rail release. With these methods, the effects to the train can be reduced. The underground crossing methods can be identified as open-cut methods and non open-cut methods. The open-cut methods include temporary support methods and special rail construction methods. Also the non open-cut methods includes pipe roof methods, front jacking methods, messer shield methods, NTR methods and JES methods. Among these, the most suitable method is applied considering safety, economy, class of each rail system (train passing frequency and velocity), etc. In the non open-cut methods, the cost and duration shall be increased to keep existing rail system during construction. In the open-cut methods which use plate girders, the rail speed shall be restricted due to the displacement and vibration of the girder. In this study new grade separation methods were developed. With this method, the safety during construction can be increased. This method refines temporary support methods, but pc slab girder with huge stiffness is applied instead of plate girders. With this method, the rail displacement can be reduced and higher safety can be obtained during construction. Also construction cost and duration can be minimized because the temporary work and the overburden soil depth can be reduced.

  • PDF

2-Dimensional Numerical Analysis of Crossing Tunnel under Railroad using Roof Panel Shield Method (RPS공법을 이용한 철도횡단터널의 2차원수치해석)

  • Shin, Eun-Chul;Roh, Jeong-Min;Lee, Eun-Soo;Kim, Kyeong-Mo;Kim, Jung-Hyi;Jung, Byung-Chul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.591-600
    • /
    • 2005
  • There are many cross tunnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(roof panel shield) method in crossing tunnel construction with comparing other existing cross tunnelling method are needed a little space and easy to change the direction of cutting shoe during the construction of pipe roof. The numerical analysis of RPS was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

  • PDF

Cable Tension Measurement of Long-span Bridges Using Vision-based System (영상처리기법을 이용한 장대교량 케이블의 장력 측정)

  • Kim, Sung-Wan;Cheung, Jin-Hwan;Kim, Seong-Do
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.2
    • /
    • pp.115-123
    • /
    • 2018
  • In a long-span bridge, the cables are important elements that support the load of the bridge. Accordingly, the cable tension is a very important variable in evaluating the health and safety of the bridge. The most popular methods of estimating the cable tensions are the direct method, which directly measures the cable stresses using load cells, hydraulic jacking devices, etc., and the vibration method, which inverses the tensions using the cable shapes and the measured dynamic characteristics. Studies on the use of the electromagnetic (EM) sensor, which detects the magnetic field variations caused by the change in the stress of the steel in the cable, are increasing. In this study, the lift-off test, the EM sensor, and the vibration method (Vision-based System and Accelerometer) were used to measure cable tension, and their results were compared and analyzed.