• Title/Summary/Keyword: JIT 시스템

Search Result 110, Processing Time 0.027 seconds

A Study on the Improving Life-up and Procurement Work Flow for Effectiveness of Resources increase in the Building Construction (건설공사의 자원 효용성 증대를 위한 조달 및 양중 작업흐름 개선에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2003
  • The purpose of this study is to present an improved lift-up & procurement work flow for effectiveness of resources increase in building construction. The current lift-up & procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up & procurement work flow. The main contents of the study are as follows; 1) A problem of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning The study recommends that continuous improvement of lift-up & procurement work flow and efficient management of information in building construction.

  • PDF

Optimizing Work-In-Process Parameter using Genetic Algorithm (유전 알고리즘을 이용한 Work-In-Process 수준 최적화)

  • Kim, Jungseop;Jeong, Jiyong;Lee, Jonghwan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.1
    • /
    • pp.79-86
    • /
    • 2017
  • This research focused on deciding optimal manufacturing WIP (Work-In-Process) limit for a small production system. Reducing WIP leads to stable capacity, better manufacturing flow and decrease inventory. WIP is the one of the important issue, since it can affect manufacturing area, like productivity and line efficiency and bottlenecks in manufacturing process. Several approaches implemented in this research. First, two strategies applied to decide WIP limit. One is roulette wheel selection and the other one is elite strategy. Second, for each strategy, JIT (Just In Time), CONWIP (Constant WIP), Gated Max WIP System and CWIPL (Critical WIP Loops) system applied to find a best material flow mechanism. Therefore, pull control system is preferred to control production line efficiently. In the production line, the WIP limit has been decided based on mathematical models or expert's decision. However, due to the complexity of the process or increase of the variables, it is difficult to obtain optimal WIP limit. To obtain an optimal WIP limit, GA applied in each material control system. When evaluating the performance of the result, fitness function is used by reflecting WIP parameter. Elite strategy showed better performance than roulette wheel selection when evaluating fitness value. Elite strategy reach to the optimal WIP limit faster than roulette wheel selection and generation time is short. For this reason, this study proposes a fast and reliable method for determining the WIP level by applying genetic algorithm to pull system based production process. This research showed that this method could be applied to a more complex production system.

The Development Scheme of Domestic Third Party Logistics for Revitalization of Electronic Trade (전자무역의 활성화를 위한 국내 제3자물류 발전방안)

  • Cha, Soon-Kwean;Jang, Heung-Hoon
    • Journal of Korea Port Economic Association
    • /
    • v.24 no.2
    • /
    • pp.155-174
    • /
    • 2008
  • This paper proposed several activation strategies at both the government and company parts for the development of domestic third party logistics(TPL) to pull electronic trade era much earlier. In the government side, it must need to arrange and integrate complex regulation rules on the Logistics for more smooth access and use the TPL market. Also, it has to provide multiple support policies such as tax reduction, technical and financial service providing, and logistics information system to TPL. Finally, it should construct the government levels education system to train and forster a competent man who is well qualified as a electronic and logiscic expert. The TPL company must build up a total logistics information system concerned with an innovative operation system such as SCM, JIT etc. which can provide logistic services on demand to the electronic trade customers to maximize consumer satisfaction. In the shipper company level, it try to join a long-term strategic alliance with TPL to reduce logistic cost and increase logistic service to its electronic trade consumers.

  • PDF

Development of a Fast Charging System Utilizing Charge Profile and Cell Balance Control Technology for Large Capacity Lithium-ion Batteries (충전 프로파일 및 셀 밸런스 제어기술을 활용한 대용량 리튬이온 배터리 고속충전시스템 개발)

  • Yunana, Gani Dogara;Ahn, Jae Young;Park, Chan Won
    • Journal of Industrial Technology
    • /
    • v.40 no.1
    • /
    • pp.7-12
    • /
    • 2020
  • Lithium-ion cells have become the go-to energy source across all applications; however, dendritic growth remains an issue to tackle. While there have been various research conducted and possible solutions offered, there is yet to be one that efficiently rules out the problem without, however, introducing another. This paper seeks to present a fast charging method and system to which lithium-ion batteries are charged while maintaining their lifetime. In the proposed method, various lithium cells are charged under multiple profiles. The parameters of charge profiles that inflict damage to the cell's electrodes are obtained and used as thresholds. Thus, during charging, voltage, current, and temperature are actively controlled under these thresholds. In this way, dendrite formation suppressed charging is achieved, and battery life is maintained. The fast-charging system designed, comprises of a 1.5kW charger, an inbuilt 600W battery pack, and an intelligent BMS with cell balancing technology. The system was also designed to respond to the aging of the battery to provide adequate threshold values. Among other tests conducted by KCTL, the cycle test result showed a capacity drop of only 0.68% after 500 cycles, thereby proving the life maintaining capability of the proposed method and system.

Runtime-Guard Coverage Guided Fuzzer Avoiding Deoptimization for Optimized Javascript Functions (최적화 컴파일된 자바스크립트 함수에 대한 최적화 해제 회피를 이용하는 런타임 가드 커버리지 유도 퍼저)

  • Kim, Hong-Kyo;Moon, Jong-sub
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.30 no.3
    • /
    • pp.443-454
    • /
    • 2020
  • The JavaScript engine is a module that receives JavaScript code as input and processes it, among many functions that are loaded into web browsers and display web pages. Many fuzzing test studies have been conducted as vulnerabilities in JavaScript engines could threaten the system security of end-users running JavaScript through browsers. Some of them have increased fuzzing efficiency by guiding test coverage in JavaScript engines, but no coverage guided fuzzing of optimized, dynamically generated machine code was attempted. Optimized JavaScript codes are difficult to perform sufficient iterative testing through fuzzing due to the function of runtime guards to free the code in the event of exceptional control flow. To solve these problems, this paper proposes a method of performing fuzzing tests on optimized machine code by avoiding deoptimization. In addition, we propose a method to measure the coverage of runtime-guards by the dynamic binary instrumentation and to guide increment of runtime-guard coverage. In our experiment, our method has outperformed the existing method at two measures: runtime coverage and iteration by time.

Development of Real-time Mission Monitoring for the Korea Augmentation Satellite System

  • Daehee, Won;Koontack, Kim;Eunsung, Lee;Jungja, Kim;Youngjae, Song
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.12 no.1
    • /
    • pp.23-35
    • /
    • 2023
  • Korea Augmentation Satellite System (KASS) is a satellite-based augmentation system (SBAS) that provides approach procedure with vertical guidance-I (APV-I) level corrections and integrity information to Korea territory. KASS is used to monitor navigation performance in real-time, and this paper introduces the design, implementation, and verification process of mission monitoring (MIMO) in KASS. MIMO was developed in compliance with the Minimum Operational Performance Standards of the Radio Technical Commission for Aeronautics for Global Positioning System (GPS)/SBAS airborne equipment. In this study, the MIMO system was verified by comparing and analyzing the outputs of reference tools. Additionally, the definition and derivation method of accuracy, integrity, continuity, and availability subject to MIMO were examined. The internal and external interfaces and functions were then designed and implemented. The GPS data pre-processing was minimized during the implementation to evaluate the navigation performance experienced by general users. Subsequently, tests and verification methods were used to compare the obtained results based on reference tools. The test was performed using the KASS dataset, which included GPS and SBAS observations. The decoding performance of the developed MIMO was identical to that of the reference tools. Additionally, the navigation performance was verified by confirming the similarity in trends. As MIMO is a component of KASS used for real-time monitoring of the navigation performance of SBAS, the KASS operator can identify whether an abnormality exists in the navigation performance in real-time. Moreover, the preliminary identification of the abnormal point during the post-processing of data can improve operational efficiency.

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

Port's Successful Global Supply Chain Strategies - Focusing on the case of Dubai port - (항만의 성공적인 글로벌 공급사슬 전략 - 두바이항의 사례를 중심으로 -)

  • Han, Chul-Hwan
    • Journal of Korea Port Economic Association
    • /
    • v.24 no.2
    • /
    • pp.175-192
    • /
    • 2008
  • Today's individual firms no longer compete as solely autonomous entities, but rather as supply chain. As such the competitive position of a port is not only determined by its internal strengths but also it is also affected by its links in a global supply chin. In other words, port competitiveness is becoming increasingly dependent on external coordination and control of the whole supply chain. The main purpose of this paper is to examine how a port embeds itself into supply chain in order to strengthen its competitive position by focusing on Dubai port case. This paper found that Dubai port used three phases-insertion, integration and dominance-as a strategies for how it can embedded into global supply chain successfully. Dubai's global supply chain strategies give some implications for the further development of the Port of Gwangyang. First, the Port of Gwangyang should fully utilize symbiotic relationship with Gwangyang free Economic Zone. Second, the integration between Korea Container Terminal Authority and GYFEZ can be recommended for fast decision-making and providing a one-stop-service. Finally, Gwangyang should pursue an aggressive supply chain strategy, aims at dominance in the regional port network through port alliance with small and medium ports in neighboring area.

  • PDF

작업관련성을 고려한 U라인 밸런싱+

  • 김우열;김용주;김동묵
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2002.05a
    • /
    • pp.73-80
    • /
    • 2002
  • 본 연구는 U자형 생산라인(U라인)에서의 라인밸런싱 문제를 해결하기 위한 유전알고리즘을 제시한다. U라인에서는 사이클 타임 내에 제품이 들어가는 방향과 나오는 방향의 작업을 한 작업자가 수행 할 수 있어서, 재공품 수량을 일정하게 유지한다거나 작업부하를 평활화 하는 등의 라인관리가 기존 직선라인에 비해 용이하다. U라인은 JIT(Just-ln-Time)생산 시스템에서 흔히 볼 수 있다. 본 연구는 U라인에서 사이클 타임이 고정되었을 때 작업장 또는 작업자의 수를 최소로 하면서 동시에 작업장에 할당된 작업들 간의 관련성을 최대화하는 라인밸런싱 문제를 다루었다. 라인밸런싱에 관한 기존 연구는 대부분 직선라인에 관한 것으로 U라인의 장점을 충분히 활용하지 못한다. 특히, 라인의 작업장의 수를 최소화하는 문제는 많은 대안해가 있음에도 불구하고, 작업관련성을 고려하여 해를 구하는 기법에 관한 연구는 아직 미미한 실정이다. 실제 조립라인에서는 가능한 한 관련된 작업들을 동일한 작업자에 할당하는 것이 바람직하며, 이러한 작업편성은 작업자의 작업능률을 향상시킬 수 있다. 유전알고리즘은 자연계의 적자생존과 생물학적 진화과정을 모방한 탐색기법으로 조합최적화 문제에 효과적인 기법으로 널리 알려져 있다. 본 연구는 유전알고리즘을 이용하여 U라인에서 작업관련성을 고려한 라인밸런싱 문제를 해결하기 위한 기법을 개발하였다. 문제의 목적에 적합한 개체의 평가함수가 제시되었으며, 개체의 형질을 효과적으로 자손에 유전할 수 있고 유전 연산이 용이한 개체의 표현방법과 개체의 해석방법이 제시되었다. 컴퓨터 실험을 통하여 개발한 알고리즘의 성능을 보였다.월 초순부터 중순에 각각 최고 성기를 나타내었다. H. papariensis의 암컷과 수컷의 발광양상을 분석하고자 정지발광과 구애 발광을 구분하여 조사하였고 각각의 발광지속시간과 발광주기를 구분하여 측정하였다. 수컷의 발광지속시간은 정지발광(0.12초)보다 구애발광(0.17초)에서 1.4배 증가하였으며 암컷의 발광지속시간은 정지발광(0.15초)보다 구애발광(0.19초)에서 1.5배 증가하였다. 발광주기는 수컷에서 정지발광(1.26초)보다 구애발광(1.12초)에서 0.88배 감소하였고, 암컷에서 정지발광(2.99초)보다 구애발광(1.06초)에서 0.35배 감소하였다. 발광양상에서 발광주파수는 수짓의 정지발광에서 0.8 Hz, 수컷 구애발광에서 0.9 Hz, 암컷의 정지발광에서 0.3 Hz, 암컷의 구애발광에서 0.9 Hz로 각각 나타났다. H. papariensis의 발광파장영역은 400 nm에서 700 nm에 이르는 모든 영역에서 확인되었으며 가장 높은 첨두치는 600 nm에 있고 500에서 600 nm 사이의 파장대가 가장 두드러지게 나타났다. 발광양상과 어우러진 교미행동은 Hp system과 같은 결과를 얻었다.하는 방법을 제안한다. 즉 채널 액세스 확률을 각 슬롯에서 예약상태에 있는 음성 단말의 수뿐만 아니라 각 슬롯에서 예약을 하려고 하는 단말의 수에 기초하여 산출하는 방법을 제안하고 이의 성능을 분석하였다. 시뮬레이션에 의해 새로 제안된 채널 허용 확률을 산출하는 방식의 성능을 비교한 결과 기존에 제안된 방법들보다 상당한 성능의 향상을 볼 수 있었다., 인삼이 성장될 때 부분적인 영양상태의 불충분이나 기후 등에 따른 영향을

  • PDF

Six-sigma Based Approach to Improve Productivity for Construction Processes and Operations (6시그마 개념을 도입한 건설공사 생산성 향상에 관한 연구)

  • Han, Seung-heon;Ryu, Ho-dong;Chae, Myung-jin;Im, Keon-soon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.649-659
    • /
    • 2006
  • Recently there has been huge efforts to improve performance in construction process by applying emerging techniques such as the Lean principle and Just-in-time concept. However, little achievement as we expected has come out in reality due to the lack of strategy to set a definite goal of the execution and differences of personal viewpoints on construction productivity. Accordingly, it is the most important to promote the circumstances for the construction process improvement by quantifying the goals of respective unit activity groups. This research explores feasible solutions for the improvement of construction projects performance by combining the six-sigma principle for the generic administrative innovation based on the idea of construction process performance. For this purpose, mutual comparisons of various current approaches are performed in an attempt to establish the advantages in applying six-sigma idea and to provide its fundamental strategy. Furthermore, through a case study with the simulation of applying six-sigma to a unit activity group in construction process, this paper verifies that the overall performance improves as the degree of sigma level gets advanced.