• Title/Summary/Keyword: Item-based construction

검색결과 164건 처리시간 0.026초

BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안 (Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation)

  • 김미현;조찬원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제10권2호
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

3차원 국토지하정보 DB설계 및 활용성 검토를 통한 지식기반 커뮤니티 구축 방안 (The Establishment Plan of Knowledge-Based Community through the 3-D National Underground Information DB Design and Utilization Review)

  • 송석진;장용구;강인준
    • 대한공간정보학회지
    • /
    • 제19권1호
    • /
    • pp.63-70
    • /
    • 2011
  • 국가에서 추진하고 있는 국가공간정보체계 사업은 기존의 2차원 지리정보에서 3차원 공간정보를 기본 지형공간정보로 확장되고 있다. 지상 지형공간정보의 구축은 대부분 완료하거나 진행 중에 있는 반면에, 지하특성을 나타내는 시추자료 등의 부족으로 지하 지형공간정보 구축에 어려움을 겪고 있다. 지하의 지형공간정보 구축 측면에서는, 국내의 기관별로 지하정보를 구축 및 관리하고 있으나, 기관별로 보유하고 있는 지하정보는 상호 공유되지 않아 비효율적으로 관리되고 있다. 본 연구에서는 지하공간정보 구축 효율성을 높이는 일환으로, 지반의 상태를 구성하는 지반 DB항목과 지질의 상태를 구성하는 지질 DB항목으로 나누어 3차원 국토지하정보 DB설계를 제시하였다. 구축된 DB를 실제 모델지역에 적용하여, 국토지하정보 활용 기술 구현 및 활용성을 검토하고, 국토지하정보 지식 기반 커뮤니티 구축 방안을 제시하였다.

AHP기법을 이용한 수요자 중심의 농업가뭄 영향 평가 기준 도출 연구 (A Study on the Derivation of the User-Oriented Agricultural Drought Assessment Criteria Using the AHP technique)

  • 이석주;송재도;장태일;설동문;손재권
    • 농촌계획
    • /
    • 제24권4호
    • /
    • pp.47-55
    • /
    • 2018
  • Currently in the drought evaluation, which is a supplier-oriented standard that applies storage rates of reservoirs, evaluation for users that use agricultural water is not done. Therefore, this study established drought evaluation items for drought evaluation based on farmers' judgement, conducted a survey on farmers and experts, compared and analyzed weighted value between two groups, and then classified the evaluation standards per each evaluation item. The agricultural drought evaluation items are 5 major items of water supply lapse rate, agricultural weather, agricultural irrigation facility, crop and soil, and 12 subsections for regional characteristics and opinions of consumers that use water to be reflected. The result of analyzing weighted value of farmers and experts' major items shows that farmers is agricultural irrigation facility(0.219), water supply lapse rate(0.211), agricultural weather(0.204), crop(0.183) and soil(0.183). Experts is agricultural weather(0.297), agricultural irrigation facility(0.202), water supply lapse rate(0.189), crop(0.162) and soil(0.150), which displays difference between the two groups. The agricultural drought criteria standards are established based on precedent studies and cases, and grades of evaluation items are 1st grade(extreme stage), 2nd grade(warning stage), 3rd grade(alert stage) and 4th grade(attention stage). The above analysis per each consumer-oriented agricultural drought evaluation item and the analysis on the standards of evaluation grades are expected to be used as a basic resource for establishing agriculture drought policy and selecting drought area in the future.

Smart-tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-plant Blast-furnace Revamping Project in Korea

  • Jung, In-Hye;Roh, Ho-Young;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.149-156
    • /
    • 2020
  • Blast furnace revamping in steel industry is one of the most important work to complete the complicated equipment within a short period of time based on the interfaces of various types of work. P company has planned to build a Smart Tracking System based on the wireless tag system with the aim of complying with the construction period and reducing costs, ahead of the revamping of blast furnace scheduled for construction in February next year. It combines the detailed design data with the wireless recognition technology to grasp the stage status of design, storage and installation. Then, it graphically displays the location information of each member in relation to the plan and the actual status in connection with Building Information Modeling (BIM) 4D Simulation. QR Code is used as a wireless tag in order to check the receiving status of core equipment considering the characteristics of each item. Then, DB in server system is built, status information is input. By implementing BIM 4D Simulation data using DELMIA, the information on location and status is provided. As a feature of the S/W function, a function for confirming the items will be added to the cellular phone screen in order to improve the accuracy of tagging of the items. Accuracy also increases by simultaneous processing of storage and location tagging. The most significant effect of building this system is to minimize errors in construction by preventing erroneous operation of members. This system will be very useful for overall project management because the information about the position and progress of each critical item can be visualized in real time. It could be eventually lead to cost reduction of project management.

  • PDF

A Study on the Artificial Intelligence Multiplex Smart Housing System

  • Park, Cheonil;Cho, Juphil
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제13권4호
    • /
    • pp.143-153
    • /
    • 2021
  • Recently, by applying the 4th industrial revolution technologies such as A.I., IoT, and big data to general residential infrastructure, various application services of residential-based are provided to residents through linkage and utilization between technologies. Accordingly, smart housing system is increasing as advanced living spaces that can improve the quality of life and convenience of residents. Such a smart housing is expected to be an item that can create new demands and markets in the construction industry since it provides a new paradigm that combines construction technology and IT by combining IT technology with existing construction industry. Based on this, it is expected that it will be possible to gradually develop large-scale markets such as smart buildings and smart cities. In this paper, therefore, we propose an artificial intelligence multiplex smart housing system as an intelligent platform that can autonomously manage and control the size of places and spaces, used for various purposes based on smart housing technology by using artificial intelligence systems.

Analysis of Consulting Reports on Defect Disputes in Apartment Building

  • Seo, Deok-Seok;Park, Jun-Mo
    • 한국건축시공학회지
    • /
    • 제13권5호
    • /
    • pp.498-505
    • /
    • 2013
  • The main processes involved in a defect dispute are consulting, reviewing, and finally judging as an arbiter. This process of defect consulting produces a defect consulting report, but business practices and standards of judgment will differ among consultants, and have many problems. This study reviews the structure of a defect consulting report and considers the structure's problem, which is that it is not standardized. To achieve this, data of sixteen defect consulting report were collected involving defect lawsuit cases before or after 2010. The structure and index of the defect consulting reports were then reviewed, and the results are as follows. As for a structure based on fourteen index, there are suitable that judge a outline, a cost estimate data and a consulting work item by a consulting standard. Furthermore, analysis by each common parts and private parts is considered as appropriate about consulting items and estimate by standard. However, consulting item in construction progress and responsibility period for security that related on a cause and a responsibility of defect need to complement. Meanwhile, the first thing of issues are connected a defect consulting is urgent a standardization for a defect type.

적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 - (A Study on Prototype of Just In Time Production Management System)

  • 이규현;최인성
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

비목별 주요 항목을 활용한 도로 공사비지수 산정에 관한 연구 (The Research on Development of Road Cost Index Using Each Representative Item of Expenditure)

  • 천진용;우성권
    • 대한토목학회논문집
    • /
    • 제26권1D호
    • /
    • pp.105-113
    • /
    • 2006
  • 건설공사비지수는 과거의 공사데이터를 바탕으로 신규공사의 공사비를 추정할 수 있을 뿐 아니라, 공사 수행 중 원가를 구성하는 비목의 가격이 상승 또는 하락할 경우 계약금액을 조정하는데도 활용된다. 국내의 경우 건설공사비지수는 주로 계약금액 조정을 위해 활용되고 있지만 계약금액 조정에 활용되는 지수의 경우 비목별 지수 산정시 건설원가의 변동을 적절하게 반영하지 못하는 문제점이 지적되어 왔다. 본 연구에서는 기존의 공사비지수 산정에 관한 선행 연구들을 비교 분석하고, 도로 건설공사 내역서의 분석을 통해 노무, 재료, 기계경비를 구성하는 주요 항목들을 중심으로 도로 건설공사비지수를 산정하는 방법론을 제안한다. 본 연구에서 제안하는 각 비목별 주요 항목의 투입 구성비를 활용한 지수산정 방법론의 적용을 통해서 건설원가의 변동을 적절히 반영하지 못한다는 기존의 문제점이 보완될 수 있을 것으로 기대된다.

ADL기반의 학습수준별 동적 콘텐츠 구성 (ADL based Construction of Dynamic Contents for Learner's Tailoring Learning)

  • 정화영;홍봉화
    • 한국콘텐츠학회논문지
    • /
    • 제9권7호
    • /
    • pp.371-378
    • /
    • 2009
  • 많은 학습시스템이 학습자의 학습효율을 높이기 위하여 학습 난이도를 평가 및 적용하고 있다. 그러나 대부분의 적용방법들은 학습 전 또는 학습 후 학습결과를 분석할 때 산출되어 학습자가 학습도중에 난이도를 변경하면서 학습 콘텐츠를 제공받기 어렵다. 본 연구에서는 학습자의 수준을 학습 과정 중에 적용하고, 이 수준에 맞는 학습 콘텐츠를 다음 학습에 바로 적용시키는 방법을 제시하였다. 이를 통해 학습자는 사전 검사를 통해 설정된 난이도에 따라 다음 학습 콘텐츠를 제공 받을 수 있어 학습향상에 도움이 될 수 있도록 하였다.

서중(暑中) 환경에서 현장 콘크리트 시험을 통한 재료 품질관리 방안 (A Study on Concrete Material Quality Management Based on Various Test of Construction Condition under Hot Weather Circumstance)

  • 박신
    • 한국건축시공학회지
    • /
    • 제5권3호
    • /
    • pp.91-99
    • /
    • 2005
  • It is required to study systematical on the concrete quality management to extend structure life because rebuilding effect is reducing under present condition of large sized and high stories structure. Concrete, which shows its intensity by hydrating action and a big change in quality according to hot weather and temperature, produces a lot of qualify problem under hot and cold weather Because of each specification and construction plan which does not have basic standard on site, concrete's quality is irregular and makes some defect. As a result, Daegu is turned out to be the longest area after investigating application period and days focused on 8 cities weather information about relationship between hot weather circumstance and construction environment. Therefore, we first surveyed the concrete material in the region and found out the problem of quality nanagement. Then figure out the way of solution. Moreover, we integrated concrete material quality management, which is applied differently to each site, to have equal quality and to reduce defect from construction site. And then, based on various test of construction condition and analysis of quality management item, we suggest effective concrete quality management to make concrete material construction standard guide and plan under hot weather.