• Title/Summary/Keyword: Iron and Steel Making Plant

Search Result 8, Processing Time 0.025 seconds

FASTMET$\circledR$ Process for Steel Mill Waste Recycling

  • Tanaka, Hidetoshi;Harada, Takao;Sugitatsu, Hiroshi
    • Proceedings of the IEEK Conference
    • /
    • 2001.10a
    • /
    • pp.387-392
    • /
    • 2001
  • Kobe Steel, LTD. and Midrex Technologies Inc. jointly developed the FASTMET$\circledR$ process as a steel mill waste recycle technology in which the DRI product meets BF feed material or BOF/EAF feed material requirements. FASTMET(R) process turns value-less wastes into valuable DRI and sellable zinc oxide, and gives the solution for the steel mill wastes recycling from both economical and environmental viewpoints. During the development of the process, Laboratory, Pilot Plant and Demonstration Plant tests were carried out from 1990 to 1998. The first FASTMET(R) commercial plant began operation in April, 2000 and the second commercial plant started in April, 2001 Both commercial plants have proceeded successfully preying that FASTMET$\circledR$ is a suitable process for recycling steel mill waste and for producing DRI as an iron source.

  • PDF

A Systems Engineering Approach to Designing Continuous Casting System in Iron and Steel Making Plant (시스템 엔지니어링 방식에 의한 철강 연속 주조 시스템 설계)

  • Shin, Kee-Young;Hong, Dae Geun;Yoon, Soo Cheol;Suh, Suk-Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.21-31
    • /
    • 2014
  • Recently, global market competition of iron and steel products is ever increasing due to over-supply from increased number of industries in rapidly growing countries, such as China, Brazil, and Indonesia. To occupy the big market, major industries are trying to develop high quality, high performance steel products via developing a new iron and steel making process. In other words, development of a new and innovative steel plant is a key to cope with the tough situation. Design and development for the life cycle of iron and steel making plant is very much complex and multi-disciplinary. In this paper, Plant Systems Engineering (PSE), a tailored SE process for industrial plant based on ISO/IEC 15288 is used for the design of Continuous Casting Process (CCP) Plant system. The CCP is a crucial process in steel making plant, whose design technology is occupied by the advanced foreign companies. For the sake of increasing engineering capability for the design of CCP, we applied PSE Process for the renovation of the existing CCP Process. Through the study, we were convinced that the applied method can be used for other plant systems, and SE is really the way of thinking, design, and development of modern complex and multi-disciplinary systems where high risk factors are present throughout the whole life cycle.

Ancient iron technologies as observed in the microstructures of iron sickles excavated from Icheon Seolbong fortress (이천 설봉산성 출토 철제 낫의 제작기술 연구)

  • Yu, Jae-Eun
    • Journal of Conservation Science
    • /
    • v.20
    • /
    • pp.67-80
    • /
    • 2007
  • Icheon Seolbong fortress is located in Saum-dong, Icheon, Gyeonggi-do Province that its date is founded as 4th century of Bakjae dynasty after excavation by Dankook university museum. Excavated artifacts show various kinds such as earthenwares, ceramics, metal artifacts and so on. Especially many iron artifacts were founded in where Bakjae earthenwares were found that it indicates iron artifacts were manufactured in Bakjae Dynasty. From 6 iron sickles, called Beollat and Millet, samples were taken to examine mircostructures and from the results used iron material, shape-forging, steel-making process, heat treatment were investigated. From this late 4th century Bakjae dynasty iron manufacture profess was established. From the result, different treatment were used in different area of the sickles according to the its use. Beollats were quenched in blade and it was used for special purpose that require Intensity. Millats did not have special treatment that it was used to cut rice plant and plant. Used material was steel, steel was previously made by certain steel-making process. It is formed to produce iron ware and the area where intensity is required heat treatment was employed to make it strong. From the investigation it is derived that iron ware manufacture process in Bakjae dynasty is steel making$\rightarrow$shape-forging$\rightarrow$and heat treatment.

  • PDF

Effect of Operating Conditions on Drying Efficiency for Coal Drying Facilities in a Steel Making Plant (제철플랜트용 석탄건조설비에서 운전조건 변경이 건조성능에 미치는 영향)

  • Jeon, Hae-Seak;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.4
    • /
    • pp.73-79
    • /
    • 2009
  • Increase of consumption in limited coal reserves leads prices surging. As a result, iron works which produce products with coal are in difficulties. Accordingly, it is required a lot of research of using non-caking coal that is relatively low cost and has abundant reserves. Direct drying and indirect drying are two major methods of drying the coal. Recently, to minimize the needed calories and to save energy, using fluidbed or fluidizing method is a recent main trend of minimizing the size of the facility and maximizing energy efficiency. However there is also disadvantage such as increasing facility investment because of installing additional facilities in the latter part. In this study, we will have theoretical researches on the indirect drying method with heat exchange system which have been traditionally used. As a result it is expected to increase the efficiency of the facility operation.

  • PDF

The Steam Temperature Control of Renovated Boiler in 100MW Power Plant (100MW 발전소 개조 보일러의 증기온도 제어)

  • Lim, Geon-Pyo;Lee, Heung-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.10
    • /
    • pp.1935-1940
    • /
    • 2011
  • The control logic of steam temperature was redesigned, tested and applied to the power plant after its steam temperature equipments had been revised. This power plant use the ancillary gas gotten in the process of making iron in the steel mill. The boiler of power plant has the superheater and reheater to make the superheated steam. The superheater and reheater have the spray valve to control their temperature. The reheater has the gas bypass damper additionally in this plant. The control logics were redesigned in cascade forms and the initial parameters of control logics were calculated from the several step tests. The final parameters could be obtained through the several repeated tests and the feedforward functions were added by temperature deviation and air flow. The power plant is being commercially-operated normally by improved control logics and It is expected that this improved controls help the efficiency improvement and safe operation of plant.

A Systems Engineering Approach for Developing An Automated Raw Material Sampling Plant (원료 샘플링 플랜트 자동화 시스템 개발을 위한 시스템엔지니어링 접근방안 연구)

  • Kwouk, Ho-Kyun;Hong, Dae-Geun;Suh, Suk-Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.55-65
    • /
    • 2015
  • In steel making plant, sampling system for raw material such as iron ore, limestone is necessary for quality control purpose. For the sake of efficiency and productivity, automation of the sampling system is highly desirable. From technical standpoint, the development of the automated system requires multi-disciplinary domain knowledge such as mechanical engineering, industrial engineering, information technology and computer engineering. Up to present time, the development has been mainly carried out by a single domain expert with project manager. The automated system developed in this way caused problems in the final system. This paper suggests a systems engineering approach to the development of automation for raw material sampling plant via a tailored process called Plant Systems Engineering (PSE) Process based on ISO/IEC 15288. Through the PSE process, we could derive right requirements and architecture of the Systems Of Interest (SOI), and we were convinced that the PSE Process can be applied to many other Plant Systems.

The Development of the Real Time Optimal Byproduct Gas Supply System

  • Kim, Jeonghwan;Yi, Heui-Sok;Chonghum Han
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2002.10a
    • /
    • pp.69.6-69
    • /
    • 2002
  • The optimal byproduct gas supply system was developed for the optimal management of the byproduct gases in the iron and steel making process based on EXCEL environment. It supplies optimal byproduct gas distribution result as well as analysis including expected electricity generation, holder level change, amount of oil consumption, energy distribution to each boiler, and efficiency of energy resource. To reflect the changing environment of the plant such as maintenance, the system was developed to easily change the optimization model for changing configuration of the system. To verify the performance of the system , case studies for various situation was performed with the developed system, a...

  • PDF

A Systems Engineering Approach to the Design of Steam Reforming H2 Generation System based on Natural Gas: Case of Iron and Steel making Plant (천연가스 기반 스팀 리포밍 수소 생산 시스템 설계를 위한 시스템엔지니어링 접근방법: 철강생산플랜트를 중심으로)

  • Kim, Joon-Young;Hong, Dae Geun;Suh, Suk-Hwan;Sur, Hwal Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.81-93
    • /
    • 2015
  • Steam Reforming H2 Generation (SRH2G) System is a chemical process to produce hydrogen through steam reforming of hydrocarbon. Largely speaking, there are two types of materials for the SRH2G: 1) Oil and coal, and 2)Natural Gas such as shale gas. From the perspective of cost, quality (purity), and environmental burden (pollution), the latter is much more desirable than the former. For this reason, research on SRH2G using natural gas is actively carried out, and implemented and operated in the various industry. In this paper, we develop a natural gas based SRH2G system via systems engineering approach. Specifically, we first derived stakeholder requirements, followed by systems requirements and finally system architecture via a tailored SE process for plant (called Plant Systems Engineering (PSE) process) based on ISO/IEC 15288. The developed method was applied to iron and steel plant as a case study. Through the case study, by the SE approach, we were convinced that a successful system satisfying stakeholders' requirements within the given constraints can be developed, verified and validated.