Proceedings of the Korea Technology Innovation Society Conference
/
2001.11a
/
pp.307-337
/
2001
In this paper, we propose the valuation frame of the IT(Information Technology) ventures using ROV(Real Options Valuation) model. Generally, ROV can comprises the traditional valuation method such as DCF(Discounted Cash Flow), which can measure only the tangible value of a firm from the expected future earnings, in that ROV can additionally measure the intangible value such as the strategic value of a firm in the uncertain environment. We set up the hypothetic IT venture future investment plan and assume that there are a growth option and a switching option consequently along the investment time horizon, which are caused by each characteristics of ventures and IT technologies, especially modularity. In the case that there are several embedded real options in the firm's investment plan in a row, we should apply the compound option pricing model as a real option valuation model in order to consider the value interaction between real options. In an addition, we present the results of optimal investment timing analysis using real options approach and compare them. with those of the original assumed investment timing.
Journal of Korean Institute of Industrial Engineers
/
v.33
no.2
/
pp.221-226
/
2007
This paper suggests a valuation framework of investment project using the concept of real options. We show the valuation process of real assets using the risk-neutral pricing. Especially, we focus on the investment lag. Real assets have investment lag in general. The decision time and the payment time are not identical. So the investment lag should be considered when valuing real assets for reality. We provide the valuation process for real assets, including R&D project. The results of this paper can be used for the real assets valuation and strategic decision analysis.
Recent collapse of shipping market right after unprecedent surge clearly demonstrates that shipping industry is extremely risky. Due to the volatile movements of the freight rates, investors tend to ask higher rate of return; higher required return reduces the total net present value of the investment project. For several decades, the Discounted Cash Flow(DCF hereafter) analysis has been the most frequently used valuation technique. However, the main problem of the DCF analysis is its assumption that the discount rate would stay the same during the project life. In other words, it usually does not address the decisions that managers have after a project has been accepted. The purpose of this study is investigate a new valuation method of investment: the Real Option Analysis(ROA hereafter) on ship investment. By replacing the existing valuation methods with the new one, the research will present a new perspective on investment with uncertainty. While uncertainty increases risk of investment and consequently discounts the value of it in the traditional feasibility analysis, in the ROA, a new valuation method which will be addressed in the research, uncertainty means some additional value of flexibility so that the tool can help investors produce more accurate decisions. Contrary to the DCF analysis, the ROA takes managerial flexibilities into account. In reality, capital budgeting and project management is typically dynamic, rather than static in nature. The ROA finds and assesses the values of managerial flexibilities or real options in the investments. The main structures of the research will be as follows: (1) overview of the ship investment project, (2) evaluation of the project by the Net Present Value analysis, (3) evaluation of the same project by the Real Option Analysis, (4) comparision of the two techniques.
Proceedings of the Korea Technology Innovation Society Conference
/
2000.11a
/
pp.259-277
/
2000
In this paper, we suggest theoretical grounds on the problem of R&D portfolio with different option premiums utilizing the Real Options Model, which has received intensified attention as the method of assessment of R&D project with high risk. Even though there have been many studies focused on the evaluation of option value of single project from technology valuation's perspective. there are few study on the portfolio of multiple technology investment by option value using. This paper bears practical importance by showing simple examples with the option value of investment alternatives and the valuation of related risk, the construction of optimum portfolio in technology investment alternatives.
Purpose - This study investigates the impact of equity financing on the valuation of R&D investments using a sample of firms from 33 countries from 1997 to 2018. Design/methodology/approach - I use a modified version of the valuation regression widely used in the literature. Findings - I find evidence that R&D investments are more highly valued when financed through equity. In contrast, debt financing does not affect the valuation of R&D investments. I also document that the impact of equity financing on R&D investment valuation weakens during the financial crisis. Research implications or Originality - In light of the distinctive characteristics of innovative investment, previous research investigates its relationship with financing. What remains unexamined, however, is how financing choices impact the way investors value innovative investments. This study seeks to bridge this gap in the existing body of research using a sample of firms from 33 countries from 1997 to 2018, for 22 years.
State's compensation obligation accompanied in case of indirect expropriation of foreign investor's investment asset has been established definite principle under international investment law. But the concrete and unified application criterion regarding valuation methods for measuring compensation have not been established yet. The World Bank investment guideline is adopting the Hull's Formula, which is understood as the full compensation standard with prompt adequate effective compensation and Fair Market Value method. It is a general principle that compensation should be equal to the fair market value of investment asset just before indirect expropriation date. However, there is a problem of the valuation method of fair market value of investment asset. In general, discounted cash flow, liquidation value, replacement value, book value, etc. can be the applicable standards. Arbitral tribunals determine compensation by adopting proper valuation method on a case-by-case basis according to the discretion based on the arbitration parties' experts' review on the presented opinion and by considering fact relevance of the issued dispute. This compensation includes also interest, recently it tends to award according to compound interest rather than simple interest. Beginning of the period to generate interest is the next day of the indirect expropriation occurrence date. And it should be considered that interest until the payment of compensation is also included. In addition, it should be considered that mental damages is available only when there's a basis to prove this or special case. Therefore, this study suggests to review of precedents related to indirect expropriation and concretely specify compensation valuation standard and method of indirect expropriation on investment agreements through enough consultation beforehand.
International conference on construction engineering and project management
/
2011.02a
/
pp.330-334
/
2011
Build-operate-transfer (BOT) projects are privatized infrastructure undertakings that face long-term investment risks and uncertainties. To ensure these projects can be completed on time and operated according to performance specifications, governments usually require BOT concessionaires to furnish performance bonds as a security. However, in order to attract investment, governments often provide abandonment rights for concessionaires to deal with investment risks and uncertainties. In the context of real options, these abandonment rights will increase project value, but the furnish of performance bonds will reduce this value. Currently in the BOT context, there is no real option model that can handle explicitly the impact of performance bonds on project value. In this paper, a real option valuation model is derived to deal with this important issue. The Taiwan high-speed rail project is used as a case study to show the applicability of the proposed model.
Increasing number of transactions and investments in technology has sparked a growing interest in technology valuation. However, it has not been easy to come up with an objective valuation of technology due to variance in technology value, purpose of valuation, and technology patterns. The central paradigm for making decisions about large technology investments is net present value. Unfortunately, it is badly flawed and systematically under values every investment opportunity. The main objective of this paper lies in the development of a new approach for technology valuation using the Real Option Valuation.
There have been many solutions to overcome theoretical problems of the Discounted Cash Flow Methods, especially on the valuation of technology. Real Options are thought as a solution. There, however, are another problems in applying Real Options for the valuation of technology; diversity and complexity of models. This Paper recommends 5 models for the valuation of technology, especially for practitioners.
Attempting to make an economic valuation of semi-liquid manure raises various complex questions. These are the valuation under different farming conditions, cost-benefit analysis in connection with the investment requirements of different semi-liquid manure systems, different storage capacities, transportation distances and treatment procedures. In the following, there questions will be discussed : 1. What value do the different types of semi-liquid manure have under different farming conditions? 2. Which storage capacities are economically justified? 3. Under which conditions is the transport of semi-liquid manure over long distances profitable?
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.