• Title/Summary/Keyword: Investment Feasibility

Search Result 318, Processing Time 0.025 seconds

Methodological Improvement for the Economic Assessment of Public R&D Programs

  • Hwang, Seogwon
    • STI Policy Review
    • /
    • v.2 no.3
    • /
    • pp.35-44
    • /
    • 2011
  • Korea has rapidly increased R&D investment over the last few decades and the intensity of R&D investment is among the highest in the world; however, there are serious concerns about R&D performance and R&D efficiency. This study is to improve the economic assessment methodology regarding a feasibility study for national R&D programs that are thought to be one of the most prominent ways to enhance R&D efficiency. In order to improve the methodology of economic assessment, a few of important factors such as technical or market uncertainty, spillover effect, and R&D contribution ratio should be covered in the model. The focus of this article is technological and market uncertainty that has a close relation with strategic flexibility and utilization potential to increase the value of R&D programs. To improve the current linear and definitive R&D process, a new framework with strategic flexibility is suggested, in which the result of economic assessment that considers technological and market uncertainty is reflected in planning. That kind of feedback process is expected to enhance the value of the program/project as well as R&D efficiency.

Strategic Business Values of the Blockchain Technology Market to Assist Professionals: Deployment Perspective

  • Waleed Rashideh
    • International Journal of Computer Science & Network Security
    • /
    • v.23 no.2
    • /
    • pp.210-226
    • /
    • 2023
  • It is difficult to transform a blockchain initiative from the feasibility stage to the fully commercialized the technology's products or services, especially considering the significant investment required and the lack of studies on the benefits and barriers from deployment perspective. Whereas some organizations have come up with their own solutions to moving beyond the feasibility stage, commercial applications do not yet exist and few organizations are willing to invest beyond the prototype phase and fill in the gap between the expected and actual business value of these types of projects. This study aims to develop a blockchain model using a survey to gather qualitative data on experts' opinions on the deployment of blockchain technology. Our model will measure how business professionals could take advantage of blockchain's disruptive technology to develop business opportunities. This study's contribution is to show blockchain technology's potential strategic business value. The findings from this exploration include the prospective for delivering comprehensions to businesses for different creating investment choices on the embracing of the blockchain technology.

Investment Analysis of the Modernized Green Houses in Korea (현대화 온실의 투자분석)

  • Lee, Kwang-Won;Lim, Jae-Hwan;Lee, Doo-Hee
    • Korean Journal of Agricultural Science
    • /
    • v.24 no.2
    • /
    • pp.170-181
    • /
    • 1997
  • The number of modernized green houses have been increased to produce high quality and high-payoff farm products. The unit investment costs per pyeong($3.3058m^2$) for building a glass house was estimated at 449 thousand won. On the other hand, the unit prices for the PC house with iron frame and the vynil house with automatic control system were revealed 365 thousand won and 93 thousand won respectively. The main objective of the study was to identify the financial feasibility of the green house investment prevailed in rural area. At present, some farmers have selected the green house without any consideration of profitability of crops and accessiblity of their fanning practices and technology. For the soundness of green house cultivation and management, the indices of finacial efficiency for the modernized green houses were necessary. The decesion making criteria such as NPV(Net Present Value), IRR(Internal Rate of Return), B/C Ratio and Payback Period were analyzed for the individual high investment facilities considering the present farmer's technology and on-farm benefits and costs. The results of the feasibility analysis of green houses were as follows: 1. In case of 100% private burden of the investment costs, NPV revealed only positive value for the vinyl house with automatic system and IRR for the house was also estimated at more than 10% and B/C Ratio was amounted to more than 1.0. On the other hand, the other glass and PC houses showed negative NPV and unacceptable B/C ratio and IRR. 2. In case of the following terms and conditions as 50% Government subsidy, 20% loans and 30% farmers burden of the total investment cost, all the green houses showed acceptable IRR, B/C Ratio and NPV. 3. The financial feasibility of the glass house was acceptable in tomato cultivation rather than in cucumber cultivation. The payback periods of cucumber were represented as 8.9 years for glass house, 8.5 years for PC house and 4.1 years for vinyl house with automatic system respectively. In conclution, the glass and PC house cultivation of high value vegetables were only acceptable under the Goverment subsidy and loan systems from the view point of farmer's financial situations. On account of the unacceptable economic rate of return, the government subsidy and loan policy for glass house cultivation should be transfered to the vinyl and pc houses in the future.

  • PDF

Economic Feasibility Study for Providing Co-generation System in various Type of Apartment Complexes (아파트단지의 특성에 따른 열병합발전도입의 경제성 비교연구)

  • Gi, Woo-Bong;Kim, Gwang-Ho;Lim, Hee-Jin;Yoon, Kyung-Shick;Jang, Hyuk-Bong;Kim, Dong-Hwan
    • New & Renewable Energy
    • /
    • v.3 no.1 s.9
    • /
    • pp.27-37
    • /
    • 2007
  • This study is to analyse the feasibility for providing Co-generation plant in Apartment Complex for 4 typical Apartment Complexes located Seoul metropolitan area, The selected complexes are three midium-large size Apartment[nearby 35pyoug of floor area] and one complex of small size Apartment[below 25 pyoung of floor area] for comparison. The necessary data for the study were collected with visitation of each site. The study showed very positive result for the three medium-large size Apartment Complexes of which the average floor area is more than 25 pyoungs, while negative result for the Complex of which average floor area is less than 25 pyoungs. Other than floor size it was found that the electric consumption density also influence the economic feasibility. In study the unit fixed cost of the energy produced from Co-generation plant is one third of the unit variable cost[fuel cost] and it seems better to select high thermal efficiency machine for Co-generation plant even with some higher cost of the plant.

  • PDF

A Study on the Rationalization of Management and Maintenance Cost for Railway Investment Assessment - Focus on High Speed Railway - (철도투자평가를 위한 운영.유지보수비용 합리화 방안 - 고속철도를 중심으로 -)

  • Suh, Sang-Kyo;Sung, Deok-Yong;Roh, Byoung-Kuk;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.331-340
    • /
    • 2009
  • This study is objected by suggesting rationalization method of management and maintenance cost for railway investment assessment. The estimate of rational benefit and cost are a work of vital importance to decide railway investment as preliminary feasibility investigation is institutionally reinforced since January 2007. In particular, railway management and maintenance cost have to be applied to realistic and detail cost as railway investment assessment guide. For example, types of railway, construction of new line, improvement of conventional line, double tracking, railway electrification. However, railway investment assessment is inconsistency because of estimating the railway management and maintenance cost using existing unrealistic management and maintenance cost. Therefore, this study is performed parametric analysis effecting on the railway management and maintenance cost considered new technique, enhanced facilities and improved standard. Also, it suggests the itemized standard management and maintenance cost. Finally, it will be helped to establish the base of railway investment through the rationalization method of management and maintenance cost.

  • PDF

Study Regarding Interrelations of Transportation Network Using Multi-Criteria Analysis (다기준 분석기법을 이용한 교통네트워크의 상호연관성에 관한 연구)

  • NamKung, Baek-Kyu;Chung, Sung-Bong;Kim, Si-Gon;Yi, Su-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1816-1824
    • /
    • 2011
  • Recently, with traffic SOC investment policy changing from road-centered to railway-centered according to environment-friendly and sustainable development, issues regarding overlapping and overinvestment of traffic facility have been raised. Regarding investment of various traffic facilities of which departure and destination are similar to each other, academia, civic organizations, government, etc. are recognizing problems including overlapping investment of budget, environmental destruction, etc., but not suggesting definite solutions. Objective transportation network analysis is required because various positive effects including solutions of delay/congestion may occur due to provision of alternative way and distribution of the amount of traffic when accidents occur, as well as negative effects suggested by some of civic organizations in various transportation facility investment of similar departure and destination. Hereupon, this study tries to suggest a tool that can objectively evaluate interrelations of transportation network by applying multi-criteria analysis including economic feasibility regarding analysis of interconnections between and within means of transportation.

  • PDF

An Analysis on the Invest Determinants of CDM Project: Evidence from Waste Handling and Disposal Sector (CDM 사업부문별 투자비용 결정요인 분석: 폐기물 부문을 대상으로)

  • Kim, Jihoon;Lim, Sungsoo
    • Korean Journal of Organic Agriculture
    • /
    • v.28 no.4
    • /
    • pp.535-553
    • /
    • 2020
  • In this study, the characteristics of the waste sector CDM project were analyzed through cluster analysis of the waste sector CDM project and the analysis of the CDM investment cost in waste sector using CDM project data registered with UNFCCC since 2008 when EU ETS phase 2 began. As of September 2020, 772 cases of CDM projects in waste disposal and disposal are registered. Biogas technology is the largest, followed by livestock manure processing and biomass production technology. The results of the cluster analysis are summarized as follows: First, on average, projects utilizing AWMS technology are small in size and relatively low in investment costs. This is judged to be relatively low investment costs due to previously attracted foreign investment capital. Second, the average investment cost of CDM projects considered along with waste (No.13), the energy industry (No.1) and agriculture (No.15) was higher than those involving only waste. The analysis of the factors determining the investment cost of the waste sector CDM project showed that, as with cluster analysis, the AWMS technology, which is a livestock manure treatment technology, was lower in the investment cost than those that use other technologies. As a result of multiple regression analysis, the investment cost of the CDM project was analyzed lower in the order of biomass, AWMS, LFG and biogas. Also, the higher the investment cost for CDM projects linked to waste, energy and agriculture, and the better the investment environment, the higher the investment cost. Although no statistical feasibility was obtained, the larger the annual emission reduction, the lower the CDM investment cost.

A Development of Quantitative Analysis Model for the Policy Analysis in Feasibility Study Using the Performance Assessment Method (성능평가기법을 활용한 타당성조사 정책적 분석단계의 정량적 의사결정모델 개발 - 복수대안의 타당성 평가를 중심으로 -)

  • Lim, Yong-Soo;Song, Hyun-Young;Jeong, Han-Kee;Jeong, Min-Chul;Kong, Jung-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.89-100
    • /
    • 2011
  • As an impactive factor on industries and national economy, The Social Overhead Capital(SOC) is major factor to determine the national competitiveness and the investment of SOC is essential for its economic growth. Accordingly, introduction of the preliminary feasibility study and establishment of legal institutionalization and evaluation system has been carried out and reviewed since 1999. Nevertheless of these efforts, basic problems such as lack of scientific method for investment evaluation and loss of effectiveness on feasibility studies are continuously being brought up. Moreover, as the preliminary study to improve the mentioned problems is mainly focused on the economic and estimated demand analysis, the study of policy analysis, the most important phase during a feasibility study, is still insufficient. Therefore, in this paper, a quantitative decision-making model, to which the performance assessment method of Value Engineering(VE) is applied, is developed and proposed to improve the policy analysis of (preliminary) feasibility study that requires combining with relative studies, to induce quantitative analysis method, and to contribute the improvement of value on the political aspect for SOC investment goals and use as a strategic decision-making method by systematic analysis.

Demand Side Management Technologies Based On Energy Environment (에너지환경을 고려한 수요관리기술)

  • 윤갑구
    • Journal of the Korean Professional Engineers Association
    • /
    • v.27 no.4
    • /
    • pp.46-55
    • /
    • 1994
  • Demand Side Management(DSM) is a system to reduce the investment cost for new power plant construction and expansion of supply facilities, power through the investment for the energy conservation and load management. In this study, the trend of the energy environment, the necessity and feasibility of DSM shall be investigated and analysed, so that this study will give a help to select and develope a proper DSM technologies for actual use.

  • PDF

Analysis of Air Traffic Delays at an Airpor (공항에서의 항공교통 지체현상 분석)

  • Kim, B.J.
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.8 no.1
    • /
    • pp.57-66
    • /
    • 2000
  • Benefit-cost analysis is one of key elements of feasibility study on a large scale investment for transportation infrastructure improvements. Benefit-cost analysis requires measuring expected benefits after the investment is completed. Reduction of delays is the major source for the benefit among other measurable benefits. Measurement methods for delays reduction have been reviewed and two methods were recommended for passenger delay and aircraft operation delay. Using these method, the effects of Cheju International Airport Improvement Projects were evaluated.

  • PDF