• Title/Summary/Keyword: Internal Rate of Return

Search Result 178, Processing Time 0.026 seconds

Optimal Asset Allocation for National Pension Considering Cohort-Specific Internal Rates of Return (코호트별 내부수익률을 고려한 국민연금 적정 자산배분)

  • Dong-Hwa Lee;Daehwan Kim
    • Journal of the Korea Society for Simulation
    • /
    • v.32 no.4
    • /
    • pp.69-76
    • /
    • 2023
  • To improve the financial stability of the National Pension, an appropriate target rate of return should be established based on pension liabilities, and asset allocation policies should be formulated accordingly. The purpose of this study is to calculate the target rate of return considering the contributions of subscribers and the pension benefits, and based on this, derive an asset allocation. To do this, we utilized the internal rate of return methodology to calculate the target rate of return for each cohort. And then, we employed a Monte Carlo simulation-based re-sampling mean-variance model to derive asset allocation for each cohort that satisfy the target rate of return while minimizing risks. Our result shows that the target rate of return for each cohort ranged from 6.4% to 6.85%, and it decreased as the generations advanced due to a decrease in the income replacement rate of the National Pension. Consequently, the allocation of risky assets, such as stocks, was relatively reduced in the portfolios of future generations. This study holds significance in that it departs from the macroeconomic-based asset allocation methodology and proposes investments from an asset-liability management perspective, which considers the characteristics of subscribers' liabilities.

A Method of Evaluating Profitability and Risk of Multiple Investments Applying Internal Rate of Return

  • Mizumachi, Tadahiro
    • Industrial Engineering and Management Systems
    • /
    • v.9 no.2
    • /
    • pp.121-130
    • /
    • 2010
  • In today's uncertain economic environment, economic risk is inherent in making large investments on manufacturing facilities. It is, therefore, practically meaningful to divide investment over multiple periods, reducing the risk of investment. Then, the cash-flow over the entire planning horizon would comprise positive inflow and negative outflow. In this case, in general, evaluation by internal rate of return (IRR) is not feasible, because multiple IRRs are involved. This paper deals with a problem of evaluating profitability, as well as risk, of investment alternatives made in multiple times of investment over the entire horizon. Typically, an additional investment is required after the initial one, for expanding manufacturing capacity or other reasons. The paper pays attention to a unit cash-flow over two periods, decomposing the total cash-flow into a series of unit cash-flow patterns. It is easy to evaluate profitability of a unit cash-flow by using IRR. The total cash-flow can be decomposed into the series of two types of unit cash-flows: an investment type one (negative-positive) and the borrowing type one (positive-negative). This paper, therefore, proposes a method in which only the borrowing type unit cash-flow is eliminated in the series by converting total cash-flow using capital interest rate. Then, a unique IRR can be obtained and the profitability is evaluated. Thus, the paper extends the method of IRR so that it may help decision making in complicated cash-flow pattern observed in practice.

Feasibility Study of Forestry Project in Sarawak State, Malaysia

  • Woo, Heesung;Turner, Paul;Kang, Byongrho;Jang, Jaeyoung;Woo, Jongchoon
    • Journal of Forest and Environmental Science
    • /
    • v.34 no.4
    • /
    • pp.352-358
    • /
    • 2018
  • This research paper investigates available options for implementing clean development mechanism (CDM) project in Sarawak state, Malaysia. To investigate economic feasibility, data was collected using survey and field research methods. Also, economic analysis was estimated using net present value (NPV), internal rate of return (IRR) and payback period (PBP) during the 30 years CDM: afforestation and reforestation periods. The result of economic analysis indicated that, the payback period was estimated at 9 years with 18 percent of internal rate of return (IRR). This study also highlighted that CDM biomass supply project have a lot of challenges due to the reduction and exclusion of bio-Solid Recovered Fuel (SRF), supply and demand scenario, and impact of restriction of illegal logging in Malaysia. This study results demonstrate the methodology and guideline for future CDM investment and projects.

Economic Feasibility of Circulating Fluidized Bed Combustion Boiler Power Plant for Low Grade Coal (저급탄용 순환유동층 보일러 발전설비의 경제성 평가)

  • Hong, Min-Pyo;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.8 no.1
    • /
    • pp.73-80
    • /
    • 2012
  • The structure and combustion characteristics, and the economic feasibility of the circulating fluidized bed combustion(CFBC) boiler using low grade coal were introduced. The economic feasibility is evaluated by comparing a 500 MW CFBC boiler power plant using low grade coal and a pulverized combustion boiler power plant with high grade coal. As the result of the evaluation, the pulverized coal combustion boiler power plant has an internal rate of return of 12.95%, 1,395.9 billion Korean won of net present value, and 6.26 years of payback period. On the other hand, CFBC boiler power plant has an internal rate of return of 13.54%, 1,704.3 billion Korean won of net present value, and 6.02 years payback period. Therefore, the CFBC boiler power plant has better feasibility in all aspects, as 0.59% higher of internal rate of return, 308.4 billion Korean won of higher net present value and 0.24 year of shorter payback period.

  • PDF

Evaluating the Investment in the Malaysian Construction Sector in the Long-run Using the Modified Internal Rate of Return: A Markov Chain Approach

  • SARSOUR, Wajeeh Mustafa;SABRI, Shamsul Rijal Muhammad
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.8
    • /
    • pp.281-287
    • /
    • 2020
  • In capital budgeting practices, investment project evaluations based on the net present value (NPV) and the internal rate of return (IRR) represent the traditional evaluation techniques. Compared with the traditional methods, the modified internal rate of return (MIRR) gives the opportunity to evaluate an investment in certain projet, while taking the changes in cash flows over time and issuing shares such as dividing shares, bonuses, and dividend for each end of the investment year into account. Therefore, this study aims to evaluate an investment in the Malaysian construction sector utilizing financial data for 39 public listed companies operating in the Malaysian construction sector over the period from Jan 1, 2007, to December 30, 2018, based on the MIRR method. Stochastic was studied in this study to estimate the estimated probability by applying the Markov chain model to the MIRR method where the transition matrix has two possible movements of either Good (G) or Bad (B). it is found that the long-run probability of getting a good investment is higher than the probability of getting a bad investment in the long-run, where were the probabilities of good and bad are 0.5119, 0.4881, respectively. Hence, investment in the Malaysian construction sector is recommended.

Economic Evaluation Analysis of Effect of Train Freight Car Safety Transport Integrated Quality Management System Based on Internet of Things(IoT) (IoT기반 철도 화차 안전운송 통합 품질관리시스템에 관한 경제성 평가지표 분석)

  • Won, Jong-Un;Yoon, Chiho;Park, Sang-Chan
    • Journal of Korean Society for Quality Management
    • /
    • v.44 no.4
    • /
    • pp.869-881
    • /
    • 2016
  • Purpose: The objective of this study is to verify the economic validation of quality management integrated train freight car by analyzing economic evaluation indicators such as benefit and cost, net present value, and inter rate of return. Methods: First, we itemize benefit and cost field by reviewing literatures; Benefit consists of 1)Safety, 2)Operation, and 3)Maintenance; Cost consists of 1)Set-up fee, 2)Wireless internet fee, and 3)Cloud storage using fee. Second, based on these estimated values, we conduct an economic evaluation analysis. Among them, benefit and cost, net present value, and internal rate of return are selected. Results: As a result, all estimated values are highly over criterion of economic validity($$B/C{\geq}_-1$$, $$NPV{\geq}_-0$$, $$IRR{\geq}_-R$$); 1)benefit over cost ratio is 28.22, 2)Net present value is 8,121.66million KRW, and 3)Internal rate of return value is 2272%. Conclusion: The findings of this study will help making a decision when train industry adopts IoT technology for improving the effectiveness.

Determinants of Liquidity of Listed Enterprises: Evidence from Vietnam

  • DANG, Hang Thu
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.11
    • /
    • pp.67-73
    • /
    • 2020
  • The paper examines the influence of internal factors and external factors on liquidity of Vietnamese listed enterprises. The study uses robust regression techniques in the fixed effects linear panel data using data collected from companies listing on the stock market in Vietnam during 2008-2019, with a total of 6,700 observations. Liquidity of Vietnamese listed enterprises is measured by current assets to current liabilities, whereas firm size, capital adequacy, profitability, leverage are used as internal determinants. Further, economic activity, inflation rate, exchange rate, and interest rate are the external factors which are considered. The research results indicate that capital adequacy, return on equity, leverage, economic activity have a positive effect on firm's liquidity, whereas return on assets and exchange rate have a negative effect on firm's liquidity and firm size, inflation rate and lending rate have no correlation with firm's liquidity. Based on the research results, the author suggests that the firms should have optimum current ratio by balancing the current assets and current liabilities in order to avoid a situation of high liquidity or low liquidity. This research seeks to bridge a gap which is present in the body of literature on listed enterprise's liquidity in Vietnam. The findings may be useful for financial managers, investors, and financial management consultants.

The Liquidity of Indian Firms: Empirical Evidence of 2154 Firms

  • AL-HOMAIDI, Eissa A.;TABASH, Mosab I.;AL-AHDAL, Waleed M.;FARHAN, Najib H.S.;KHAN, Samar H.
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.1
    • /
    • pp.19-27
    • /
    • 2020
  • This paper aims to empirically study the determinants of liquidity of Indian listed firms. To account for profit persistence, we apply a (pooled, fixed and random) effect models to a panel of Indian listed firms that covers the time period from 2010 to 2016. This study consists of 2154 firms operating in Indian market. Liquidity (LQD) of Indian firms is measured by liquid assets to total assets, whereas bank size, capital adequacy, profitability, leverage, and firm age are used as internal determinants. Further, economic activity, inflation rate, exchange rate, and interest rate are the external factors considered. The findings reveal that leverage, return on assets, and firm age are the essential internal determinants that impact the liquidity of Indian listed firms. Furthermore, among the internal determinants, the results indicate that firm size, leverage ratio, return on assets ratio, and firm age are found to have a significant positive association with firms' LQD, except leverage ratio and firm age has a negative relationship with firms' LQD. From this result, this article has provides helpful ideas and empirical evidence on the inner and external determinants of the companies mentioned in India is very useful to bankers, analysts, regulators, investors and other stakeholders.

Removal of Nitrogen and Phosphorus from Municipal Wastewater by a Pilot-scale BNR Process (파이롯트 규모의 BNR 공법에 의한 도시하수의 질소 및 인 제거)

  • Kim, Young-Chur
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.21 no.5
    • /
    • pp.589-599
    • /
    • 2007
  • This study was conducted to investigated the removal efficiency of BOD and nutrient for the treatment of low strength municipal wastewater by a biological nutrient removal system. In this experiment, the effect of operating parameter including HRT of 7.0hr, BOD/TN ratios of 2.62~4.08, internal recycle of 50~300%, and return sludge of 50~100%, were studied during winter season. Efficiencies of organic matter and T-P removal and denitrification were not significantly affected by the change of temperature in winter season. However, the specific nitrification rate and nitrification efficiency decreased at low temperature. Besides, denitrification efficiencies increased with increasing BOD/TN ratios. It was also found that the internal recycle and return sludge ratio below 50% is required for the effective denitrification of low strength municipal wastewater. With operating mode 4 of the optimum, the effluent BOD, T-N and T-P concentration were obtained to average 5.8, 14.6, and 0.84 mg/L, respectively. The temperature-activity coefficient (${\theta}$) of specific nitrification rate, specific denitrification rate and specific phosphorus uptake rate were obtained 1.044, 1.017, 1.028, respectively.

Economic Feasibility of Automatic Egg Washer (계란 자동세척기의 경제적 타당성 평가)

  • Lin, Qing-Long;Yeo, Jun-Ho
    • Current Research on Agriculture and Life Sciences
    • /
    • v.32 no.3
    • /
    • pp.165-169
    • /
    • 2014
  • This study assessed the economic feasibility of an automatic egg washer. Based on various cost benefit analysis methods, including the net present value (NPV), internal rate of return (IRR) and benefit cost ratio (B/C Ratio), the automatic egg washer was confirmed to have economic feasibility. The NPVs were 38,565,991 won at 5% discount rate and 32,013,916 won at 10% discount rate, respectively. The IRRs were 1.325 at 5% discount rate and 1.299 at 10% discount rate, respectively. Finally, the B/C ratios were 1.726 at 5% discount rate and 1.699 at 10% discount rate.