• Title/Summary/Keyword: Internal Rate of Return

Search Result 179, Processing Time 0.025 seconds

Economic Evaluations of CO2 Capture Process from Power Plant Flue Gas Using Dry Sorbents (건식 흡수제를 이용한 발전소배가스의 CO2 회수공정 경제성분석)

  • Shin, Byung Chul;Kwak, Hyun;Lee, Kwang Min
    • Korean Chemical Engineering Research
    • /
    • v.50 no.4
    • /
    • pp.646-653
    • /
    • 2012
  • We studied the economic evaluations on Korea Institute of Energy Research (KIER)'s $CO_2$ capture process using dry sorbents, and compared the results with those of comparable technologies. Capital and operating costs of the $CO_2$ capture system for 500 MW coal fired power plant were estimated to determine the economic feasibility. LCOE (Levelized Cost of Energy) and $CO_2$ capture cost appeared 32.46$/MWh and 28.15$/ton$CO_2$, respectively. The internal rate of return (IRR), the net present values (NPV), and the payback period (PBP), were calculated by assuming several variables. As the result of calculation, IRR of KIER's $CO_2$ capture system was 15%, NPV was calculated 6,631,000$, and PBP was 5.93 years at $50/t$CO_2$ of CER price. Consequently, this process can compete with other comparative processes using dry sorbents.

Predicting the success of CDM Registration for Hydropower Projects using Logistic Regression and CART (로그 회귀분석 및 CART를 활용한 수력사업의 CDM 승인여부 예측 모델에 관한 연구)

  • Park, Jong-Ho;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.65-76
    • /
    • 2015
  • The Clean Development Mechanism (CDM) is the multi-lateral 'cap and trade' system endorsed by the Kyoto Protocol. CDM allows developed (Annex I) countries to buy CER credits from New and Renewable (NE) projects of non-Annex countries, to meet their carbon reduction requirements. This in effect subsidizes and promotes NE projects in developing countries, ultimately reducing global greenhouse gases (GHG). To be registered as a CDM project, the project must prove 'additionality,' which depends on numerous factors including the adopted technology, baseline methodology, emission reductions, and the project's internal rate of return. This makes it difficult to determine ex ante a project's acceptance as a CDM approved project, and entails sunk costs and even project cancellation to its project stakeholders. Focusing on hydro power projects and employing UNFCCC public data, this research developed a prediction model using logistic regression and CART to determine the likelihood of approval as a CDM project. The AUC for the logistic regression and CART model was 0.7674 and 0.7231 respectively, which proves the model's prediction accuracy. More importantly, results indicate that the emission reduction amount, MW per hour, investment/Emission as crucial variables, whereas the baseline methodology and technology types were insignificant. This demonstrates that at least for hydro power projects, the specific technology is not as important as the amount of emission reductions and relatively small scale projects and investment to carbon reduction ratios.

Appraisal of the Special Production Area Development Project in Rural Area and Countermeasures for Off-farm Income Increase (The Case of Chungnam Province) (농어촌(農漁村) 특산단지개발사업(特産團地開發事業)의 평가(評價)와 농외소득증대방안(農外所得增大方案) (충청남도(忠淸南道)를 중심(中心)으로))

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.18 no.2
    • /
    • pp.164-179
    • /
    • 1991
  • Korean agriculture has encountered two problems. One is internal income disparity between rural and urbarn area and the other is external Uruguay Round trade problems as an abolition of direct and indirect import barriers, reduction in export subsidies and to reduce internal price supports. These problems will be brought severe farm problems such as decreasing farm household income and repressing agricultural growth in the near future. Considering the above inevitable facts Korean government has implemented several development projects such as rural industrial area development project, rural special production area development project, leisuresight seeing farm development project, traditional food development project, unskilled labor training project for off-farm employment and so on, to increase farm household income through off-farm income increase. This study was mainly concentrated on the identification of operational problems and post evaluation of the rural special production area development projects which aimed at increasing non-farm incomes and giving employment opportunity for rural farmers in small factories processing regional special farm products and mine products. The main findings and problems to be solved for the successful project implementation are as followed ; 1. Total number of the special production area development projects as of the end of 1991 was amount to 138, and total number of farm household participated were estimated at 2,079, and total amount of off-farm income per farm household was reached to 3,011 thousand won. 2. The total number of processed special products have increased from 21 items in 1981 to 56 items in 1991. On the other hand the total number of farm household participated in the projects have decreased from 2,518 to 2,079 during same period. 3. Total amount of investment for the projects has increased from 1,429 million won in 1981 to 24,760 million won in 1991 but the rate of G'T loan of the total investment has reduced from 24.5% to 5.2% during same period. 4. 138 special production area development project are classified into 6 kinds of commodity groups such as 19 of general industrial good production areas, 52 of folks-industrial art objects production areas, 39 of food processing areas, 9 of fiber and texstile processing areas, 18 of agricultural and fishery inputs processing areas and 1 of stone processing area. 5. The total production value in 1990 was estimated 20,169 million won of which export was amount to 2,627 million won. 6. The finacial rate of return of the UNGOK KUGIJA Tea processing Project operated by UNGOK coops and BAKSAN ginseng tea processing project were estimated at 45.4% (B/C Ratio=1.17, NPV=152.5 million won) and 17.7% (B/C Ratio=1.12, NPV=120.2 million won) respectively. 7. More favorite terms and condition of the loan including collateral problems have to be given to farmers participated. Heavy investment and G'T subsidy policies should be started for the successful project implementation anf farm household income increase. 8. To expand market demand of the rural special goods G'T have to provide special program of TV or other mass media for commodity propaganda and the total cost concerned must be supported by G'T subsidy. 9. The special farm products as GUGUJA,MOSI'Ramie', Ginseng. SOGOKJU,HEMP,Mushroom.DUGYUNJU and Chesnut processing projects have to be propelled and expanded for off-farm income increase in Chung Nam Province. 10. Direct operational pattern of the special production area by coops is more favorable to farmers and recommendable considering with off-farm income increase and market demand creation throughout Korea. 11. In rural area, special organizations for project appraisal are not exist. Accordingly special training program, project appraisal, formulation and preparation for civil servants concerned have to be prepared for project selection and sound implementation under limited budget and financial support.

  • PDF

Greenhouse Gas Emission Reduction and Economic Benefit Evaluation of Carbon Mineralization Technology using CFBC Ash (순환유동층 석탄재를 이용한 탄소광물화 기술의 온실가스 배출 저감량 및 경제성 분석)

  • Jung, Euntae;Kim, Jeongyun
    • Resources Recycling
    • /
    • v.31 no.3
    • /
    • pp.40-52
    • /
    • 2022
  • This study analyzed the amount of carbon dioxide reduction and economic benefits of detailed processes of CO2 6,000 tons plant facilities with mineral carbonation technology using carbon dioxide and coal materials emitted from domestic circulating fluidized bed combustion power plants. Coal ash reacted with carbon dioxide through carbon mineralization facilities is produced as a complex carbonate and used as a construction material, accompanied by a greenhouse gas reduction. In addition, it is possible to generate profits from the sales of complex carbonates and carbon credits produced in the process. The actual carbon dioxide reduction per ton of complex carbonate production was calculated as 45.8 kgCO2eq, and the annual carbon dioxide reduction was calculated as 805.3 tonCO2, and the benefit-cost ratio (B/C Ratio) is 1.04, the internal rate return (IRR) is 10.65 % and the net present value (NPV) is KRW 24,713,465 won, which is considered economical. Carbon mineralization technology is one of the best solutions to reduce carbon dioxide considering future carbon dioxide reduction and economic potential.

Cost-Benefit Analysis on Marine Transportation Safety Facility Using CVM(Contingent Valuation Method) (CVM을 이용한 해상교통안전시설 투자 편익 분석)

  • Kim, Sooyeob;Lee, Gunwoo
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2014.06a
    • /
    • pp.73-75
    • /
    • 2014
  • Marine transportation facility is public goods for the general public and their safety. The study used the Contingent Valuation Method (CVM), a method to estimate economic value of non-market goods, such as environmental goods. In order to analyze economic effects of marine accidents preventable by the VTS, the study estimated costs caused by marine accident cases. It conducted surveys with people and shipping companies in local areas where VTS is to be established in the future. According to a survey with people in areas where marine transportation control center is to be built (Tongyoung), the yearly benefit from building new VTS is estimated at KRW 11billion. If fees are paid in the form of income tax for five years from 2014, corresponding benefits during the same period will reach KRW 47.3 billion in current value. An analysis on economic validity of VTS establishment in Tongyong showed the B/C ration stood at 3.193, far higher than 1. The Net Present Value (NPV) was KRW 32.5 billion and the Internal Rate of Return (IRR) turned out to be 37.4% which was higher than social discount rates of 53.5%. On balance, the establishment has reasonable economic validity.

  • PDF

The Effects of the Computer Aided Innovation Capabilities on the R&D Capabilities: Focusing on the SMEs of Korea (Computer Aided Innovation 역량이 연구개발역량에 미치는 효과: 국내 중소기업을 대상으로)

  • Shim, Jae Eok;Byeon, Moo Jang;Moon, Hyo Gon;Oh, Jay In
    • Asia pacific journal of information systems
    • /
    • v.23 no.3
    • /
    • pp.25-53
    • /
    • 2013
  • This study analyzes the effect of Computer Aided Innovation (CAI) to improve R&D Capabilities empirically. Survey was distributed by e-mail and Google Docs, targeting CTO of 235 SMEs. 142 surveys were returned back (rate of return 60.4%) from companies. Survey results from 119 companies (83.8%) which are effective samples except no-response, insincere response, estimated value, etc. were used for statistics analysis. Companies with less than 50billion KRW sales of entire researched companies occupy 76.5% in terms of sample traits. Companies with less than 300 employees occupy 83.2%. In terms of the type of company business Partners (called 'partners with big companies' hereunder) who work with big companies for business occupy 68.1%. SMEs based on their own business (called 'independent small companies') appear to occupy 31.9%. The present status of holding IT system according to traits of company business was classified into partners with big companies versus independent SMEs. The present status of ERP is 18.5% to 34.5%. QMS is 11.8% to 9.2%. And PLM (Product Life-cycle Management) is 6.7% to 2.5%. The holding of 3D CAD is 47.1% to 21%. IT system-holding and its application of independent SMEs seemed very vulnerable, compared with partner companies of big companies. This study is comprised of IT infra and IT Utilization as CAI capacity factors which are independent variables. factors of R&D capabilities which are independent variables are organization capability, process capability, HR capability, technology-accumulating capability, and internal/external collaboration capability. The highest average value of variables was 4.24 in organization capability 2. The lowest average value was 3.01 in IT infra which makes users access to data and information in other areas and use them with ease when required during new product development. It seems that the inferior environment of IT infra of general SMEs is reflected in CAI itself. In order to review the validity used to measure variables, Factors have been analyzed. 7 factors which have over 1.0 pure value of their dependent and independent variables were extracted. These factors appear to explain 71.167% in total of total variances. From the result of factor analysis about measurable variables in this study, reliability of each item was checked by Cronbach's Alpha coefficient. All measurable factors at least over 0.611 seemed to acquire reliability. Next, correlation has been done to explain certain phenomenon by correlation analysis between variables. As R&D capabilities factors which are arranged as dependent variables, organization capability, process capability, HR capability, technology-accumulating capability, and internal/external collaboration capability turned out that they acquire significant correlation at 99% reliability level in all variables of IT infra and IT Utilization which are independent variables. In addition, correlation coefficient between each factor is less than 0.8, which proves that the validity of this study judgement has been acquired. The pair with the highest coefficient had 0.628 for IT utilization and technology-accumulating capability. Regression model which can estimate independent variables was used in this study under the hypothesis that there is linear relation between independent variables and dependent variables so as to identify CAI capability's impact factors on R&D. The total explanations of IT infra among CAI capability for independent variables such as organization capability, process capability, human resources capability, technology-accumulating capability, and collaboration capability are 10.3%, 7%, 11.9%, 30.9%, and 10.5% respectively. IT Utilization exposes comprehensively low explanatory capability with 12.4%, 5.9%, 11.1%, 38.9%, and 13.4% for organization capability, process capability, human resources capability, technology-accumulating capability, and collaboration capability respectively. However, both factors of independent variables expose very high explanatory capability relatively for technology-accumulating capability among independent variable. Regression formula which is comprised of independent variables and dependent variables are all significant (P<0.005). The suitability of regression model seems high. When the results of test for dependent variables and independent variables are estimated, the hypothesis of 10 different factors appeared all significant in regression analysis model coefficient (P<0.01) which is estimated to affect in the hypothesis. As a result of liner regression analysis between two independent variables drawn by influence factor analysis for R&D capability and R&D capability. IT infra and IT Utilization which are CAI capability factors has positive correlation to organization capability, process capability, human resources capability, technology-accumulating capability, and collaboration capability with inside and outside which are dependent variables, R&D capability factors. It was identified as a significant factor which affects R&D capability. However, considering adjustable variables, a big gap is found, compared to entire company. First of all, in case of partner companies with big companies, in IT infra as CAI capability, organization capability, process capability, human resources capability, and technology capability out of R&D capacities seems to have positive correlation. However, collaboration capability appeared insignificance. IT utilization which is a CAI capability factor seemed to have positive relation to organization capability, process capability, human resources capability, and internal/external collaboration capability just as those of entire companies. Next, by analyzing independent types of SMEs as an adjustable variable, very different results were found from those of entire companies or partner companies with big companies. First of all, all factors in IT infra except technology-accumulating capability were rejected. IT utilization was rejected except technology-accumulating capability and collaboration capability. Comprehending the above adjustable variables, the following results were drawn in this study. First, in case of big companies or partner companies with big companies, IT infra and IT utilization affect improving R&D Capabilities positively. It was because most of big companies encourage innovation by using IT utilization and IT infra building over certain level to their partner companies. Second, in all companies, IT infra and IT utilization as CAI capability affect improving technology-accumulating capability positively at least as R&D capability factor. The most of factor explanation is low at around 10%. However, technology-accumulating capability is rather high around 25.6% to 38.4%. It was found that CAI capability contributes to technology-accumulating capability highly. Companies shouldn't consider IT infra and IT utilization as a simple product developing tool in R&D section. However, they have to consider to use them as a management innovating strategy tool which proceeds entire-company management innovation centered in new product development. Not only the improvement of technology-accumulating capability in department of R&D. Centered in new product development, it has to be used as original management innovative strategy which proceeds entire company management innovation. It suggests that it can be a method to improve technology-accumulating capability in R&D section and Dynamic capability to acquire sustainable competitive advantage.

Simulation and Feasibility Analysis of Aging Urban Park Refurbishment Project through the Application of Japan's Park-PFI System (일본 공모설치관리제도(Park-PFI)의 적용을 통한 노후 도시공원 정비사업 시뮬레이션 및 타당성 분석)

  • Kim, Yong-Gook;Kim, Young-Hyeon;Kim, Min-Seo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.5
    • /
    • pp.13-29
    • /
    • 2023
  • Urban parks are social infrastructure supporting citizens' health, quality of life, and community formation. As the proportion of urban parks that have been established for more than 20 years is increasing, the need for refurbishment to improve the physical space environment and enhance the functions of aging urban parks is increasing. Since the government's refurbishment of aging urban parks has limitations in securing financial resources and promoting attractiveness, they must be promoted through public-private partnerships. Japan, which suffered from the problem of aging urban parks, has successfully promoted several park refurbishment projects by introducing the Park-PFI through the revision of the 「Urban Park Act」 in 2017. This study examines and analyzes the characteristics of the Japan Park-PFI as an alternative to improving the quality of aging domestic urban park services through public-private partnerships and the validity of the aging urban park refurbishment projects through Park-PFI. The main findings are as follows. First, it is necessary to start discussions on introducing Japan's Park-PFI according to the domestic conditions as a means of public-private partnership to improve the service quality and diversify the functions of aging urban parks. In order to introduce Park-PFI social discussions and follow-up studies on the deterioration of urban parks. Must be conducted. The installation of private capital and profit facilities and improvements of related regulations, such as the 「Parks and Green Spaces Act」 and the 「Public Property Act」, is required. Second, it is judged that the Park-PFI project is a policy alternative that can enhance the benefits to citizens, local governments, and private operators under the premise that the need to refurbish aging urban parks is high and the location is suitable for promoting the project. As a result of a pilot application of the Park-PFI project to Seyeong Park, an aging urban park located in Bupyeong-gu, Incheon, it was analyzed to be profitable in terms of the profitability index (PI), net present value (FNPV), and internal rate of return (FIRR). It is considered possible to participate in the business sector. At the local government level, private capital is used to improve the physical space environment of aging urban parks, as well as the refurbishment of the urban parks by utilizing financial resources generated by returning a portion of the facility usage fees and profits (0.5% of annual sales) of private operators. It was found that management budgets could be secured.

Economic Feasibility of Hill Land Development (산지개발(山地開發)의 경제성)

  • Kim, Dong-Min
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.11 no.4
    • /
    • pp.283-295
    • /
    • 1979
  • A new Farmland Expansion and Development Promotion Law was enacted in 1975. This law authorizes the Government to undertake development within a declared "reclamation area", wherever the land owners are unable to do so. In order to give additional impetus to conversion of waste hilly land into productive farmland, these hilly land development projects were conducted as large scale scheme which include soil fertility improvements such as the application of lime and phosphate. Farmland Expansion and Development Promotion Corps has attempted to undertake annual farm surveys in order to obtain some information about hilly land agriculture and farming operations within the reclamation project areas since 1976. As survey data accumulates, more and more clear picture of hilly land farming come to appear and enable us to conduct in-depth study. Effects of such upland reclamation include converting of previously unproductive slopeland into cultivable farmland for lucrative and commercial farming or food production. Furthermore, idle or marginal resources such as farm labor, equipment and compost would be fully employed. Socio-economic effects would include increases in land value and attitude change of farmers. On the other hand the preservation of natural environments might be damaged to the some extend by the projects. As shown in Table 7, the average farm size increased from 3,156 pyeong($3.3m^2$) to 5,562 pyeong, a 76.2% increase. The proportion of small farms with less than I ha dropped from 59.8% to 34.4%, but that of the large farms over 2 ha rose from 13.1% to 32.0% (See Table 8). The survey results indicate that as the farming on reclaimed uplands become time-honored, the acreage devoted for food crop production decreases against the economic crop growing acreage (see Table 6). For example, in the case of uplands reclaimed in 1972, the ratio of food crop acreages decreased from 99.7% in 1972 to 62.5% in 1977, whereas that of economic crop acreages increased from 0.3% in 1972 to 37.5% in 1977. The government used to actively encourage the farmers to carry out food crop production in the reclaimed upland targting toward the realization of self-sufficiency in food grains. It is, however, apparent that the farmers did hardly take the government advises as far as their economic interest were concerned. Yield per 10a. of various crops from the reclaimed uplands by year were surveyed as seen in Table 12. On the average, barley production in the reclaimed areas achieved 83.3% of the average unit yield from the existing upland in its 5 th year. Soybean yields showed a modest increase from 64% in the first year to 95%, in the 5 th year. In contrast, economic crops such as red pepper, totacco and radish achieved their maximum target yields in 3 years from starting to cultivate on the reclaimed farms. In order to test the post economic viability, an economic analysis was performed for each of selected subprojects on the basis of the data obtained through survey. The average actual internal economic rate of return on upland reclamation investments was found to be 20.3% which exceeded other types of projects of land and water development such as tidal land reclamation, irrigation or paddy rearrangement. The actual IRRs of subcategories of upland reclamation projects varied from 17.9% to 21.4% depending upon the kinds of cropping system adopted in each reclaimed areas such as food, economic, fruit or forage crops.

  • PDF

Demonstration and Operation of Pilot Plant for Short-circuit Nitrogen Process for Economic Treatment of High Concentration Nitrogen Wastewater (고농도 질소함유폐수의 경제적 처리를 위한 단축질소공정 파일럿플랜트 실증화 및 운영 결과)

  • Lee, Jae Myung;Jeon, Ji-hyeong;Choi, Hong-bok
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.28 no.1
    • /
    • pp.53-64
    • /
    • 2020
  • A 2㎥/d combined wastewater treatment pilot plant containing the multi-stage vertical stacking type nitrification reactor was installed and operated for more than 1 year under the operating conditions of the short-circuit nitrogen process (pH 8, DO 1mg/L and Internal return rate 4Q from nitrification to denitrification reactor). For economically the combination treatment of food wastewater and the leachate from a landfill, the optimal combination ratio was operated by adjusting the food wastewater with the minimum oil content to 5-25% of the total throughput. The main treatment efficiency of the three-phase centrifugal separator which was introduced to effectively separate solids and oil from the food wastewater was about 52% of SS from 116,000mg/L to 55,700mg/L, and about 48% of normal hexane (NH) from 53,200mg to 27,800 mg/L. During the operational period, the average removal efficiency in the combined wastewater treatment process of BOD was 99.3%, CODcr 94.2%, CODmn 90%, SS 70.1%, T-N 85.8%, and T-P 99.2%. The average concentrations of BOD, CODcr, T-N, and T-P of the treated water were all satisfied with the discharge quality standard for landfill leachate ("Na" region), and SS was satisfied after applying the membrane process. On-site leachate had a relatively high nitrite nitrogen content in the combined wastewater due to intermittent aeration of the equalization tanks and different monthly discharges. Nevertheless nitrite nitrogen was accumulated, denitrification from nitrite nitrogen was observed rather than denitrification after complete nitrification. The average input of anti-forming chemical during the operation period is about 2L/d, which seems to be economical compared to the input of methanol required to treat the same wastewater.