• 제목/요약/키워드: Integrated cost and schedule

검색결과 84건 처리시간 0.023초

제품개발 프로세스를 지원하는 통합설계환경 (Integrated design system for supporting product development process ($ezDesign^{(R)}$ System))

  • 이상봉;김수옥;홍태화
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 춘계학술대회논문집C
    • /
    • pp.357-360
    • /
    • 2001
  • Design Engineering Group, LG Production engineering Research Center has been developing The Integrated Design Environment enabling engineering design task with ease, speedy and accurate for several years targeting the design departments in LG Electronics. $ezDesign^{(R)}$ System is consisted by Engineering Database Management, Engineering Knowledge Management, 3D Design Application, Design Evaluation Method and Project Management. Engineering Database Management manage the design information effectively. Engineering Knowledge Management takes control of design knowledge from design engineering activity systematically. It is possible for the engineering designer to utilized 3D CAD easily by 3D Design Application. Design Evaluation Method can evaluate several design alternatives synthetically. In Project management System, Designer can simulate the project schedule and cost. In this report, We will introduce how design process can be innovated by way of $ezDesign^{(R)}$ System.

  • PDF

원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구 (Process Model for development of EVMS in Nuclear Power Plant Project)

  • 김윤명;원서경;신일섭
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

INTEGRATED PERFORMANCE MANAGEMENT FOR WHOLE PHASES OF URBAN RENEWAL MEGAPROJECTS

  • Heedae Park;Kang-Wook Lee;Seung Heon Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1463-1467
    • /
    • 2009
  • Construction projects are vulnerable to diverse internal and external factors, requiring systematic and consistent performance management along the entire life cycle of a project. In particular, urban renewal projects have a range of performance measures, including policy reconciliation and permits, project development, project financing, design, construction, and occupancy and maintenance. This requires a program-level megaproject approach, which integrates each stage of a project as well as variety of stakeholders' interests in pursuing a project from different perspectives. However, previous research on performance management has focused especially on the limited scopes of factors, including cost, quality, and schedule at the project level or on financial factors at the firm level. Given the lack of current approaches, this study suggests an integrated and systematic performance management scheme to control urban renewal megaprojects at the broadened perspectives of the program level. To this end, this study adopts the balanced scorecard approach and elicits key performance indices associated with various project configurations. Finally, an algorithm is presented for quantitatively assessing the level of performances along whole life cycle of urban renewal megaprojects.

  • PDF

신한옥 건설통합정보화를 위한 표준정보분류 및 사업번호체계 (Standard Classifications and Project Numbering System for Integrated Construction Management of Modernized Korean Housing (Hanok))

  • 정영수;김우중;하지원
    • 한국CDE학회논문집
    • /
    • 제17권4호
    • /
    • pp.225-233
    • /
    • 2012
  • A comprehensive research effort in order to develop and disseminate modernized Korean housing (Hanok) has recently been initiated by Korean government. This large scale research project encompasses a wide spectrum of housing development including public policy, architectural plans, modules, construction materials and methods, prefabricated assemblies, automated production, construction management, and advanced information systems. For the purpose of integrating and automating the whole processes from an industry perspective, it is of great importance to develop a standard classification system and project numbering system (PNS) for the modernized Korean housing. This paper focuses on the standard classification systems and PNS for cost and schedule control. The distinct characteristics and managerial requirements were explored and embedded into the proposed classifications for modernized Hanok.

BIM 기반 MEP 설계 조율 프로세스 분석을 통한 비용 관리 시스템 개발 사례 연구 (Cost Management System for Mechanical, Electrical, and Plumbing(MEP) Coordination Using Building Information Modeling(BIM) - A Case Study)

  • 원종성;함성일;장세준
    • 한국건축시공학회지
    • /
    • 제22권2호
    • /
    • pp.195-205
    • /
    • 2022
  • 본 연구에서는 BIM(building information modeling)을 활용한 비용 기반 MEP(mechanical, electrical, and plumbing) 조율 프로세스를 제안하였다. 제안된 프로세스는 MEP 부재간 간섭 해결뿐만 아니라 MEP 조율 과정에서 의사결정에 따른 MEP 관련 비용 변화를 정확하고, 빠르게 분석하고, 참여자와 공유할 수 있도록 해준다. 이를 위하여 MEP BIM 모델로부터 추출된 물량 정보와 비용 데이터베이스, 시간 정보를 통합했다. 제안된 프로세스의 적용성을 평가하기 위하여 국내 건설 프로젝트 현장에 적용하였다. 적용 결과, 예상 비용 대비 약 1.6%의 MEP 관련 비용을 절감했다고 분석되었다.

금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구 (Study on Project Management Method of Naval Ship Building in Monetary Fluctuations)

  • 김형만;서관희;김수영
    • 대한조선학회논문집
    • /
    • 제42권5호
    • /
    • pp.542-549
    • /
    • 2005
  • Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.

종합군수지원에서의 MOEs, MOPs, TPMs 적용방안에 대한 연구 (A Study on the Application of MOEs, MOPs, TPMs for the Integrated Logistics Support)

  • 서양우;오영일;박은심;임성준;이승상
    • 시스템엔지니어링학술지
    • /
    • 제15권2호
    • /
    • pp.47-56
    • /
    • 2019
  • Although the weapon systems are becoming more diverse and complex, they are progressing in a short development period and a longer test and evaluation period. The more difficult the given environment is, the more efforts and performance of quantitative target values can be made by development agencies to carry out stable projects. However, these target values of the Integrated Logistics Support are not specified in the requirements and being set during the system development phase. In this paper, application of MOEs, MOPs and TPMs for ILS are presented and provided the basis for carrying out systematic Verification & Validation activities. As a result that MOEs of the ILS were chosen as Availability and MOPs as Mission Reliability, Logistics Reliability, Maintainability and Supportability and TPMs as MTBF, MTBCF, MTTR and so on. In particular, it is appropriate tailoring and apply the TPMs considering the cost, schedule, scope of work and characteristics of the project.

Concept definition of Small-Medium Reactor Coolant System using System Engineering

  • Park, Jung Hwan;Jung, Jae Cheon
    • 시스템엔지니어링학술지
    • /
    • 제10권1호
    • /
    • pp.33-41
    • /
    • 2014
  • New design concept of Reactor Coolant System (RCS) including a reactor assembly for the SMR is introduced in this work. An exploration of new type of reactor that is advanced from proposed SMRs is performed by using systems engineering approach. In this point of view project structured on three main phases; needs analysis (NA), concept exploration (CE), and concept definition (CD). Main objectives as an output of the CE stage are a small size, low cost, shortening the schedule, and enhancing safety. The SMRs usually have a small size requirement. In order to meet the size requirement and to achieve a productivity, in other words, easiness to manufacture, this paper suggests an integrated PWR design concept through researching predecessors. Although the integrated PWR concept provides many advantages, it has disadvantages that composite of maintenance and a low availability problem. Therefore, this paper comes up with a run-to-fail design concept based on modular design to address the maintenance problem and to maximize the availability of SMRs as well as to be compatible with the overall-SMRs including Barge Mounted(BM)type.

아웃소싱을 고려한 병렬기계 일정계획 연구 (A Parallel Machine Scheduling Problem with Outsourcing Options)

  • 이익선;윤상흠
    • 산업경영시스템학회지
    • /
    • 제31권3호
    • /
    • pp.101-109
    • /
    • 2008
  • This paper considers an integrated decision for scheduling and outsourcing(or, subcontracting) of a finite number of jobs(or, orders) in a time-sensitive make-to-order manufacturing environment. The jobs can be either processed in a parallel in-house facilities or outsourced to subcontractors. We should determine which jobs should be processed in-house and which jobs should be outsourced. And, we should determine the schedule for the jobs to be processed in-house. If a job is determined to be processed in-house, then the scheduling cost(the completion time of the Job) is imposed. Otherwise(if the job should be outsourced), then an additional outsourcing cost is imposed. The objective is to minimize the linear combination of scheduling and outsourcing costs under a budget constraint for the total available outsourcing cost. In the problem analysis, we first characterize some solution properties and then derive dynamic programming and branch-and- bound algorithms. An efficient heuristic is also developed. The performances of the proposed algorithms are evaluated through various numerical experiments.

선단구성을 위한 초기배선 (Initial Ship Allocation for the Fleet Systematization)

  • 이철영;최종화
    • 한국항해학회지
    • /
    • 제8권1호
    • /
    • pp.1-16
    • /
    • 1984
  • The economical property of a shipping enterprise, as well as other transportation industries, is determined by the difference between the freight earned and expense paid. This study can be regarded as a division of optimizing ship allocation to routes under the integrated port transport system. Fleet planning and scheduling require complicated allocations of cargoes to ships and ships to routes in order to optimize the given criterion function for a given forecast period. This paper deals with the optimum ship allocation problem minimizing the operating cost of ships in a shipping company. Optimum fleet operating for a shipping enterprise is very important, since the marine transportation is a form of large quantity transport requiring long-term period, and there is a strong possibility to bring about large amount of loss in operation resulting from a faulty ship allocation. Where there are more than one loading and discharging ports, and a variety of ship's ability in speed, capacity, operating cost etc., and when the amount of commodities to be transported between the ports has been determined, then the ship's schedule minimizing the operating cost while satisfying the transport demand within the predetermined period will be made up. First of all a formula of ship allocation problems will be established and then will be constructed to solve an example by the Integer Programming application after consideration of the ship's ability, supply and demand of commodity, amount of commodity to be transported, operating costs of each ship etc. This study will give good information on deciding intention for a ship oprator or owner to meet the computerization current with shiping management.

  • PDF