• Title/Summary/Keyword: Integrated Definition

Search Result 256, Processing Time 0.024 seconds

SSC risk significance in risk-informed, performance-based licensing of non-LWRs

  • James C. Lin
    • Nuclear Engineering and Technology
    • /
    • v.56 no.3
    • /
    • pp.819-823
    • /
    • 2024
  • The main criteria used in NEI 18-04 to define SSCs as risk-significant include (1) the SSC is required to keep all LBEs within the F-C target, and (2) the total frequency with the SSC failed exceeds 1% of the limit for at least one of the three cumulative risk metrics used for evaluating the integrated plant risk. The first one is a reasonable criterion in determining the risk significant SSCs. However, the second criterion may not be adequate to serve the purpose of determining the risk significance of SSCs. In the second criterion, the cumulative risk metric values representing the integrated plant risk (less the preventive and mitigative effects of the SSC being evaluated) are compared to a risk limit that represents a very small contribution to the overall integrated plant risk, which corresponds appropriately to the contributions from individual SSCs. The easiest approach to redefine the NEI 18-04 definition of risk-significant SSCs in relation to the integrated plant risk metrics is to compare the difference, between the risk metric value calculated with the SSC failed and the risk metric value calculated with the SSC credited, with 1% of the risk limit established for the integrated plant risk metrics.

Design Data Exchange in an Integrated Architectural Design Environment: A Product Model Approach Using STEP Technology (통합 건축 설계 환경에서의 설계 정보의 교환에 관한 연구: STEP을 이용한 Product Modeling 접근 방법)

  • 김인한;김유진
    • Korean Journal of Computational Design and Engineering
    • /
    • v.2 no.1
    • /
    • pp.44-52
    • /
    • 1997
  • A design process is difficult to describe comprehensively because a design problem has a multi-disciplinary nature and the design itself evolves as solutions are attempted by the designer. The process of design has been investigated in this paper with the purpose of characterizing the role that a system of this kind may have. In defining the system, an approach has been used that privileges the relationships with the existing CAD tools based on data exchange standards in course of definition today. Integrated design environment normally consists of a centralized data model a data management system and a set of CAD tools. In this study, all further investigations are directed towards the data management system, as one of the main components of the proposed environment. Moreover, product modeling, as a prerequisite for the data management core, is taken into special consideration.

  • PDF

Development of data analysis tool for combat system integration

  • Shin, Seung-Chun;Shin, Jong-Gye;Oh, Dae-Kyun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.5 no.1
    • /
    • pp.147-160
    • /
    • 2013
  • System integration is an important element for the construction of naval combat ships. In particular, because impeccable combat system integration together with the sensors and weapons can ensure the combat capability and survivability of the ship, the integrated performance of the combat system should be verified and validated whether or not it fulfills the requirements of the end user. In order to conduct systematic verification and validation, a data analysis tool is requisite. This paper suggests the Data Extraction, Recording and Analysis Tool (DERAT) for the data analysis of the integrated performance of the combat system, including the functional definition, architecture and effectiveness of the DERAT by presenting the test results.

An Integrated Production Management Model for a Manufacturing System (제조시스템을 위한 통합형 생산관리모형 구축)

  • Ahn, Jae-Kyoung
    • IE interfaces
    • /
    • v.16 no.1
    • /
    • pp.111-116
    • /
    • 2003
  • Business integration has been considered as one of the most critical success factors that enable the firms to gain competitive edges. Despite this trend, it has also been found among not a few companies that the activities that should be functionally tied with are performed even independently. In this study, an integrated model of production planning and inventory has been developed. Computerization of the production planning activities is proposed and implemented. We also proposed the reasonable inventory levels of each item using historic data of the items, which are composed of safety stock from the given fill-rate, operating stock from the production patterns, and reserved stock from the production planning. This study has helped the firm to have clearer job definition of the related processes, to tightly control the inventory by setting and tracing the reasonable fill rates for every product, and to quickly respond to the market changes through the computerized production planning process.

Study on Integrated Workflow for Designing Sustainable Tall Building - With Parametric method using Rhino Grasshopper and DIVA for Daylight Optimization

  • Kim, Hyeong-ill
    • KIEAE Journal
    • /
    • v.16 no.5
    • /
    • pp.21-28
    • /
    • 2016
  • Purpose: The Objective of this study is to explore the capabilities of an integrated modelling and simulation workflow when applied to an experiment-based research process, aimed at deriving daylight optimization strategies specific to tall buildings. Methods: Two methods were devised to apply this workflow with the help of DIVA and Rhino/Grasshopper. The first method is a multiple variant analysis by setting up an appropriate base case and analysing its daylight and energy performance, forming the basis of comparison for subsequent cases for design variants. The second method involved setting up the base case within a site context and conducting a solar irradiation study. An architectural variables such as overhang and shading device, were then defined as inputs in the parametric definition in Grasshopper to control the selected variable. Results: While the first method took advantage of the speed and efficiency of the integrated workflow, the second method was derived based on the ability to directly process simulation data within the integrated, single-software platform of the proposed workflow. Through these methods, different architectural strategies were explored, both to increase daylight penetration and to reduce radiant heat gain. The focus is on methods by which this workflow can be applied to facilitate the experimental derivation of daylight optimization strategies that are specific to tall building design.

A Study of Integrated SCADA System for Wind Farm to Support Interoperability (이기종간의 상호운용을 지원하는 풍력발전 통합 SCADA 시스템에 관한 연구)

  • Kim, Young-Gon;Moon, Chae-Joo;Joo, Yeong-Tae;Park, Tae-Sik;Chang, Young-Hak
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.6
    • /
    • pp.70-76
    • /
    • 2013
  • Recently industrial control systems have been required to ensure intelligent, high tech automation, interconnection and interoperability demands. Therefore, there is a need to redefine the structure concepts of SCADA system for wind power. Also, at this time, the integrated management system is required for the distributed development of wind farms where are needed often interoperability features and exchange information between different wind farms, wind turbines or SCADA systems. In this paper, an integrated structural concepts for SCADA system are defined. Based on this definition of an integrated SCADA system, the basic designs are analyzed on physical layer, system layer and application layer which are corresponded to wind turbine controller, the SCADA server and the SCADA client, and implement HMI. Between the implementation SCADA server and the client, their normal functions were verified at the small scale wind energy test facilities.

Development of Unique Registration Number System for Construction Site Integrated DB (건설 통합DB 구축을 위한 시공현장등록번호 체계 개발)

  • Hur, Youn Kyoung;Lee, Seung Woo;Yoo, Wi Sung;Kim, Sung Hwan;Sung, Yookyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.367-368
    • /
    • 2023
  • Kiscon, Seumteo, KONEPS and CSI are representative construction-related DBs. All four DBs are operated by the public. However, the characteristics of data are different depending on the purpose. Therefore, it is difficult to utilize integrated data and it is only used sparingly. Creating and sharing a unique key that can identify a construction site will enable integrated accumulation and management of construction-related data for various purposes. At this point, it is most efficient to assign a unique key based on KISCON. KISCOn data conforms to the construction site definition and covers most of the public, private, architectural and civil works. In addition, there is an advantage in that DB construction is performed in the construction situation, which is a relatively preceding process. In the future, it is necessary to create a practical construction site integrated DB through the production of an integrated key table containing linkage information of unique keys for site management, performance indicators, and statistics production.

  • PDF

Derivation of BIM/GIS Platform Application Scenarios and Definition of Specific Functions in Construction Planning and Design (건설 기획 및 설계 단계 BIM/GIS 통합 플랫폼 활용을 위한 시나리오 도출 및 상세기능 정의)

  • Youn, Junhee;Kang, Tae-Wook;Choi, Hyun-Sang;Kim, Changyoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7340-7349
    • /
    • 2014
  • BIM (Building Information Model) and GIS (Geographic Information System) are applied widely to all stages (Planning - Design - Building - Maintenance) of construction. Recently, research for designing an integrated BIM/GIS platform has been conducted to determine the synergy effects. This paper reports the derivation of BIM/GIS platform application scenarios and definition of specific functions in construction planning and design phases. First, BIM/GIS application scenarios and platform functions are derived for each phase based on an analysis of business affairs. Second, SW functions, which compose platform function, are defined. In the construction planning phase, location selection and route location business affairs were analyzed. Preliminary design and detailed design business affairs were analyzed in the construction design phase. The result of this research can be used for BIM/GIS integrated platform design in the future.

A Study on the Information Modeling of Defense R&D Process Using IDEF Methodology (IDEF 방법론을 이용한 국방 연구개발 프로세스의 정보모델링 연구)

  • Kim, Chul-Whan
    • The Journal of Society for e-Business Studies
    • /
    • v.10 no.1
    • /
    • pp.41-60
    • /
    • 2005
  • IDEF(Integrated Definition) method, a standard methodology of CALS process modelling, was applied to the weapon system R&D process to provide information modelling by analysing about goal, input, output and constraints in the R&D process. The information to be managed in R&D institutes was identified by using SmartER which is the automation program of IDEF1/1X and obtained information modelling for TO-BE model. The work process of weapon system R&D consists of the concept study phase, the exploration development phase, the system development phase, the prototype manufacturing phase, and the report writing of R&D results phase. The information modelling of weapon system R&D is the R&D work process with information sharing by means of IWSDB Since IDEF is suitable for large scale system development like weapon system R&D, further studies on IDEF would be required to achieve the goal of defense CALS.

  • PDF

Nonlinear analysis of service stresses in reinforced concrete sections-closed form solutions

  • Barros, Helena F.M.;Martins, Rogerio A.F.
    • Computers and Concrete
    • /
    • v.10 no.5
    • /
    • pp.541-555
    • /
    • 2012
  • This paper presents an algorithm for the evaluation of stresses in reinforced concrete sections under service loads. The algorithm is applicable to any section defined by polygonal contours and is based on an analytical integration of the stresses. The nonlinear behaviour of concrete is represented by the parabola-rectangle law used in the Eurocode-2 for the ultimate concrete design. An integrated definition of the strains in concrete and steel is possible by the use of Heaviside functions, similarly to what is done for ultimate section design in Barros et al. (2004). Other constitutive equations for the definition of the stresses in the concrete or steel can be easily incorporated into the code. The examples presented consist in the evaluation of resulting axial load and bending moment in an irregular section and in a section in L shape. The results, for service stresses, can also be plotted in terms of design abacus; a rectangular doubly reinforced section is presented as example.