• Title/Summary/Keyword: Instrumentation Acceptance Criteria

Search Result 3, Processing Time 0.016 seconds

Response Instrumentation Test Acceptance Criteria for APR1400 RVI CVAP (APR1400 원자로내부구조물 종합진동평가 응답측정시험 허용기준)

  • Ko, Do-Young;Kim, Kyu-Hyung;Kim, Sung-Hwan
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.21 no.11
    • /
    • pp.1036-1042
    • /
    • 2011
  • APR1400 RVI CVAP using the non-prototype category II is being conducted to verify integrity of the RVI design and to secure the CVAP technology. The measurement programs are to confirm vibration analysis results for reactor internals during pre-operational and initial startup testing and to determine the safety margin. One of the important basis for the measurement programs is test acceptance criteria. Therefore, this paper is on establishment of response instrumentation test acceptance criteria for APR1400 RVI CVAP. The established acceptance criteria show that the stress criteria of APR1400 RVI are more conservative values than those of the valid prototype plant(Palo Verde unit 1) and, the displacement criteria of the inner barrel assembly and the upper guide structure were established to 0.03 in and 0.01 in, respectively.

Establishment of Response Instrumentation Test Acceptance Criteria for APR1400 Reactor Vessel Internals Comprehensive Vibration Assessment Program (APR1400 원자로내부구조물 종합진동평가 응답측정시험 허용기준 수립)

  • Ko, Do-Young;Kim, Kyu-Hyung;Kim, Sung-Hwan
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2011.10a
    • /
    • pp.212-218
    • /
    • 2011
  • APR1400 RVI CVAP using the non-prototype category is being conducted to verify integrity of the RVI design and to secure the CVAP technology. The measurement programs are to confirm vibration analysis results for reactor internals during preoperational and initial startup testing and to detemine the safety margin. One of the important basis for the measurement programs is test acceptance criteria. Therefore, this paper is on establishment of response instrumentation test acceptance criteria for APR1400 RVI CVAP. The established acceptance criteria show that the stress criteria of APR1400 RVI are more conservative values than those of the valid prototype plant(Palo Verde unit 1) and, the displacement criteria of the IBA and the UGS were established to 0.03 in and 0.01 in, respectively.

  • PDF

LOSS OF OFFSITE POWER TEST EXPERIENCE FOR YGN 4

  • Chi, Sung-Goo;Sung, Kang-Sik;Kim, Se-Chang;Kim, Eul-Ki;Eom, Young-Meen;Park, Young-Boo
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1995.10a
    • /
    • pp.230-234
    • /
    • 1995
  • The loss of offsite power test was successfully performed on YGN 4 to demonstrate that the reactor can be shutdown and the RCS can be maintained in a hot standby condition following a loss of all offsite Alternating Current (AC) power. Following the loss of main generator and all offsite AC power, the ensile emergency diesel generators were automatically started and the plant was stabilized via natural circulation. Plant conditions were maintained in hot standby for at least 30 minutes before offsite power was restored. Thus, the capability of equipment, controls and instrumentation necessary to remove decay heat from the core using only ensile emergency power was demonstrated, thereby satisfying all objectives and acceptance criteria of the test.

  • PDF