• Title/Summary/Keyword: Institutional improvement plan

Search Result 121, Processing Time 0.023 seconds

An Analysis of Importance for Institutional Improvement of Respond of Heavy Snowfall (대설 대응의 제도적 개선을 위한 중요도 분석)

  • Kim, Heejae;Yoon, Sanghoon;Park, Keunoh;Kim, Geunyoung
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.3
    • /
    • pp.340-347
    • /
    • 2017
  • This study deducted institutional improvement factors for respond of heavy snowfall disaster and performed AHP analysis for choosing the priority. The result of Analysis, establishment of plan concerned heavy snowfall respond was represented most important factor(Importance : 0.461), this is meaningful establishment of plan is more important than facilities, sources, policies for building system of heavy snowfall respond. Establishment of plan concerned respond was represented most important element(Comprehensive Importance : 0.175) in plan for heavy snowfall respond, it is suggested that establishment of respond plan of heavy snowfall has to need for improving law and institution about heavy snowfall. The result of this study will be useful when the central or local government establish institutional improvement plan for respond of heavy snowfall disaster.

Statement by the Korean Society of Occupational and Environmental Medicine on the proposed reform of working hours in South Korea

  • Hee-Tae Kang;Chul-Ju Kim;Dong-Wook Lee;Seung-Gwon Park;Jinwoo Lee;Kanwoo Youn;Hwan-Cheol Kim;Kyoung Sook Jeong;Hansoo Song;Sung-Kyung Kim;Sang-Baek Koh
    • Annals of Occupational and Environmental Medicine
    • /
    • v.35
    • /
    • pp.17.1-17.6
    • /
    • 2023
  • The current 52-hour workweek in South Korea consists of 40 hours of regular work and 12 hours of overtime. Although the average working hours in South Korea is declining, it is still 199 hours longer than the Organisation for Economic Co-operation and Development average of 1,716 hours per year. In view to this, the South Korean government has now proposed to reform the workweek, mainly intending to increase the workweek to 69 hours when the workload is heavy. This reform, by increasing the labor intensity due to long working hours, goes against the global trend of reducing work hours for a safe and healthy working environment. Long working hours can lead to increased cerebrovascular and cardiovascular diseases, industrial accidents, mental health problems, and safety accidents due to lack of concentration. In conclusion, the Korean government's working hour reform plan can have a negative impact on workers' health, and therefore it should be thoroughly reviewed and modified.

Current status of diving and institutional improvement plan of diving apparatus fishery in the southern coast of Korea (우리나라 남해안 잠수기 어업의 잠수현황과 제도적 개선방안)

  • Heo, Gyeom;Lim, Seok-Won;Shin, Hyeon-Ok
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.51 no.1
    • /
    • pp.136-145
    • /
    • 2015
  • A large number of divers that are engaged in a diving apparatus fishery (DAF) have been experienced a decompression sickness. This study has two purposes. One is measurement of the diving patterns and respiration rate. The other one is to research the institutional improvement plan of the DAF. In the experiments, the diving depth, the diving time, the total ascent time and the ascent rate were about 12.4 m, 22 min, 28 s and 28.1 m/min, respectively, in Tongyeong. In the case of Geoje the diving depth, the diving time, the total ascent time and the ascent rate were about 20 m, 64 min, 17 min and 1.3 m/min, respectively. In a questionnaire survey, the diving depth was 20~29 m (56.4%) in Tongyeong and Geoje, the diving time was 50~59 min (42.9%) in Tongyeong and 70~79 min (35%) in Geoje and all of the divers experienced decompression sickness. In the investigation related to a institutional issue, both of the diving apparatus fisheries had adopted the share system. And the laws and the system for the safety of the divers were not enough in Korea. This study suggests that the license and the diving time for diver of the DAF are needed and diver protection for decompression sickness is needed in the law. And the wage payments should change from full sharing to partial sharing included a regular pay to enhance the safety of the divers.

A Study on the Management Plan through Performance Maintenance Analysis of Explosion-proof Facilities (방폭설비 성능유지 실태분석을 통한 관리방안 연구)

  • Kwon, Yong Jun;Byeon, Junghwan
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.8-16
    • /
    • 2020
  • In Article 311 of the Regulation on Occupational Safety and Health Standards requires the use of Korean Industrial Standards Act in accordance with the Industrial Standardization Act. However, the classification, inspection, maintenance, design, selection, and installation of explosion hazard locations for explosion and explosion prevention and internalization of 'safety' in the performance maintenance phase of electrical machinery and equipment There is no technical and institutional management plan for remodeling and alteration. Analysis of actual conditions and problems related to the installation, use, and maintenance of explosion-proof equipment, comparative analysis of domestic and international technical standards and systems, technical, institutional and administrative systems and systems related to installation, use, and maintenance of explosion-proof equipment, technical personnel and qualifications, etc. It is to propose legislation, system improvement, and technical standard establishment related to the maintenance of explosion-proof facility performance through improvement of the necessity and feasibility study for establishment of the legal status of the management site and management plan. As technical measures, KS standard revision (draft), KOSHA guide (draft) and explosion-proof facility performance maintenance manual were presented. In addition, the institutional management plan proposed the revised rule on occupational safety and health standards, the revised rule on the restriction of employment of hazardous work, and the manpower training program related to the maintenance of explosion-proof facilities and the qualification plan. Enhance safety at the installation, use, and maintenance stage of explosion-proof structured electrical machinery. It is expected to be used to classify explosion hazards, select related equipment, and to update and standardize standards related to installation, use and maintenance.

Safety Management Improvement Plan in Construction Project (건설사업 관리의 안전관리 향상 방안에 대한 연구)

  • Kim, Min-Seok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.115-116
    • /
    • 2012
  • The number of safety accidents of the construction industry is higher than other industries. To prevent the accidents from hazard factor, the employees are variously trained in avoiding an accident. Also many studies have been conducted to reduced the safety accident. But most of these studies are limited to institutional complements. This study proposes safety management improvement plan of safety management through case studies.

  • PDF

The Changes of Standardization Administrative Organization and Improvement Plan (표준화행정기구의 변천과정 및 개선방안)

  • 조남호;이내형;한우철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.66
    • /
    • pp.47-57
    • /
    • 2001
  • This thesis introduce the organization system and office regulation of standardization administrative organization for the change of times, also suggest improvement plan for its effective management. The main improvement plan refer to the standardization administrative organization\`s work, this thesis suggest, 1. Readjustment of national standardization system and effective reorganization for standards information organization. 2. For industrial standards system, the korea industrial standards should be maintained uniform system, So decentralized korea industrial standard at government ,must be unified and maintained to unique policy for its effective improvement. 3. To strengthen with international standards organization, a institutional device, budget funds, and expert should be backed up. 4. For training and education of expert, Refer to the performance of one\`s duty, the proper expert should be chosen and posted. Also, systematic training and education system for expert must be developed, So they can be on duty continuously, Finally, this thesis suggest that the necessity of systematic and unique policy must be established for high position at international area. Since the limitation of data, the future research will be performed for budget funds and personnel setup.

  • PDF

A Legal Study on Improvement Plans for Citizen Safety Insurance Operation and Management System (시민안전보험 운영관리체계의 개선방안 연구)

  • Lee, Jung-Im
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.2
    • /
    • pp.77-85
    • /
    • 2022
  • This study tried to suggest a systematic improvement plan to prepare a civil safety insurance operation and management system by reviewing the operation and management status of civil safety insurance, which is operated and managed by each local government autonomously. In this study, the problems of the current civil safety insurance were analyzed by dividing them into the lack of systematic management of insurance items, overlapping coverage between insurance items, and deviations in compensation limits. As a systematic improvement plan, it was suggested to secure the systemic management of guarantee items, standardize compensation standards, prepare an integrated operation and management system, and provide financial support for local governments with poor financial independence. Since the problems and improvement plans for the civil safety insurance analyzed as described above are formed by exchanging and receiving a complex mutual influence, the institutional improvement plan for the operation and management system of the civil safety insurance is not only a specific part of the study, but also comprehensively current citizens. Based on the results derived from the analysis of safety insurance, it is concluded that alternatives must be found.

A Study on Railway Construction System Rationalization - focusing on railway construction in metropolitan area - (철도건설체계의 합리화방안연구 - 대도시지역의 철도건설을 중심으로 -)

  • 이용상
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.387-395
    • /
    • 2002
  • As a result of an increase in population of the Metropolitan area and a steady change of circumstances in many parts, the city is sprawling out into the suburbs. This phenomenon causes the necessity of modification of present urban plan. It is risen as a point of issue that construction systems of new railway routes and underground construction, which should be followed the new urban plan in case of inter-regional railway and regional railway. It is hard to find sufficient financial resources, nevertheless the railway improvement definitely affects regional development and improvement of social environment. Also, there is a limit to government subsidies. In this respect, it is necessary to set up a new idea about movement of existing railway routes and improvement of the equipment. This study examines the present problems of railroad construction system in urban downtown area and introduces a suitable institutional way through referring to the instances of other countries.

  • PDF

Current Status and Planning Improvement through Case Studies of Nursing Homes in the View of Disaster Safety - Focused on the Cases of Cheongju City, Chungbuk - (재난안전 관점의 노인요양시설 사례연구를 통한 현황 및 개선방안 - 충북 청주시 사례를 중심으로 -)

  • Choi, Yu-Ra;Kim, Mi-Kyung
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.5
    • /
    • pp.41-51
    • /
    • 2020
  • As there are the elderly who have difficulty in evacuating themselves, it is necessary to develop architectural and institutional planning for nursing homes that can minimize disaster damage. The purpose of this study was to suggest the improvement plan by grasping the current status of nursing homes on planning aspects such as floor plan type, spatial layout, and evacuation route through 14 case studies in Cheongju city in terms of disaster safety. The results of this study were as follows; the most common plan type was the grouped-corridor type difficulty in securing evacuation routes. The circulation corridor type is need to be considered because it is possible not only to secure evacuation and nursing routes, but also to create a hanging around corridor for the elderly with dementia. Second, if there is a risk of flooding due to the location, the living room should be placed on the 2nd floor or more. In particular, a kitchen should be placed not adjacent to the entrance and the vertical evacuation route. Third, the horizontal evacuation route should be arranged differently depending on the floor plan type. For vertical evacuation routes, it is necessary to install outdoor stairs or ramps considering the evacuation characteristics of the elderly. In addition, the institutional aspects should be considered to ensure the safety of disasters.

Priority for the Improvement on Natural Conservation Zone system (자연보전권역 관련 제도개선 우선순위에 관한 연구)

  • Lee, Yun Sang;Ahn, Hyeon;Lee, Mi Hong
    • Land and Housing Review
    • /
    • v.10 no.2
    • /
    • pp.1-13
    • /
    • 2019
  • This study suggests that the system improvement priority of the Natural Conservation Zone of the Metropolitan Area Maintenance Planning Law, which was enacted for about 37 years. First of all, through the precedent research and the consultation meeting, the improvement plan was divided into the short term and the mid(or long) term. Important findings and implications are as follows. The short-term priority results were 'Improve water quality regulation', 'Strengthen individual location regulations of factories and induce multi-use plan position', and 'Improvement of waterfront area regulation', which were both critical and urgent. The mid-term(or Long-term) priority results were 'To integrate development and environmental duplication regulations', 'Abolition and unification of environmental laws', and 'Adjustment and resetting of natural conservation areas', which were both critical and urgent. On the other hand, 76.4% of the residents and 64.5% of the experts are concerned about the necessity of improvement of the Natural Conservation Zone system. Both residents and experts seem to be aware of the necessity. Opinions about Improvement and mitigation of regulations on Natural Conservation Zone that were constantly raised. In the past, there was a temporary and fragmented institutional mitigation of the government. However, with the rapid development of eco-friendly technologies since 2010, Our Country Conditions is in a transition period. This study has significant implications for the improvement and mitigation of metropolitan area regulations.