• Title/Summary/Keyword: Institute Application

Search Result 33,291, Processing Time 0.069 seconds

New Design of Central Region in KIRAMS-13 Cyclotron

  • An, Dong-Hyun;Jeong, In-Su;Kang, Joon-Sun;Park, Chong-Shik;Hong, Seong-Seok;Chang, Hong-Suk;Hong, Bong-Hwan;Lee, Min-Yong;Yang, Tae-Keun;Hur, Min-Goo;Hwang, Won-Taek;Kim, Jung-Hwan;Kim, Sang-Wook;Kim, Yu-Seok;Chai, Jong-Seo
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 2004.10a
    • /
    • pp.1249-1250
    • /
    • 2004
  • PDF

Design of RF coupler for KIRAMS-13;Korea Institute of Radiological & Medical Sciences-13

  • Jung, In-Su;An, Dong-Hyun;Kim, Yu-Seok;Yang, Tae-Gun;Kim, Jea-Hong;Jang, Hong-Seok;Hong, Bong-Hwan;Lee, Min-Yong;Hong, Sung-Seok;Chai, Jong-Seo;Oh, Bong-Hun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.2203-2205
    • /
    • 2003
  • KIRAMS-13, the first medical cyclotron developed by domestic technique, is used to produce radio-isotope such as $^{18}F$ whose life time is relatively short through test operation. For high-power operation of charged particle accelerators, the power coupler must withstand enormous stresses due to charging induced by high RF power passing through. High-power RF testing with peak power in excess of 30kW has been performed on prototype power coupler for KIRAMS-13 normal conducting cavities. CST MICROWAVE STUDIO(CST MWS) is used for fundamental RF Design, and power coupler is manufactured according to fundamental power coupler design requisite. The qualification of the couplers has occurred for the time being only in a limited set of conditions as the available RF system and control instrumentation are under improvement.

  • PDF

System Operation of the MSC

  • Kim, Young-Soo;Yong, Sang-Soon;Heo, Haeng-Pal;Kong, Jong-Pil;Kim, Young-Sun
    • Bulletin of the Korean Space Science Society
    • /
    • 2002.10a
    • /
    • pp.48.2-48
    • /
    • 2002
  • PDF