• Title/Summary/Keyword: Installation site

Search Result 653, Processing Time 0.026 seconds

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

Intermediate Storage Process required before Operation Site Installation of System (Focusing on the Rolling Stock of Railway System) (시스템의 운용 현장 설치 전 요구되는 중간 보관 프로세스 연구 (철도차량 중심으로))

  • Choi, Yo Chul
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.16 no.2
    • /
    • pp.141-147
    • /
    • 2020
  • Due to the nature of the long-term project of a Railway business, Many problems have been arisen in the process of delivering products or systems verified by suppliers to the customer's operation site. Unexpectedly, it is often necessary for the verified products to store intermediately at the supplier's site for a variety of reasons, such as delays in business and delays in civil engineering, at the time of sending them to the customer's operation site. In this study, the intermediate storage process for finding and solving problems related to intermediate storage was presented focusing on the Rolling Stock of Railway System by reference to ISO/IEC/IEEE 15288:2015. A suitable intermediate storage process based on the developed product or system's characteristics will allow the verified products or systems to be placed on the customer's operation site and to meet the customer's product or system requirements.

A Study on the Daylight Illumination Environment of a Classroom and a Glare Phenomenon on the Blackboard (교실의 주광 조명환경과 철판의 눈부심 현상에 관한 연구)

  • 임윤빈;장우진
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 1996.11a
    • /
    • pp.42-48
    • /
    • 1996
  • Glare phenomenon by sun's altitude and strong sunlight make a much visual handicap. And so, it reaches to unreadable situation although enough illumination in the fore site student of a window site and passage site. In school student seat arrange in the order of their height. So, cause the eyesight acuity according to distance is different, eyesight of backseat's student drop 1.0 and less in spite of 1.0, a learning effect reduces rather then that of the fore site student for site and Passage sitestudents. Therefore. in school, the conclusion's alteration of school structure, position's alteration and material quality's improvement of blackboard are needed, should be local lighting in blackboard. Therefore, we think that in other in improve the effect of lesson by the student, the student seats are not given by uniform disposition in the order of their height but change by a specified period.

  • PDF

Factors Affecting Survival of Maxillary Sinus Augmented Implants (상악동 거상술을 동반한 임플란트의 생존율에 관한 기여인자)

  • In, Yeon-Soo;Park, Young-Wook
    • Maxillofacial Plastic and Reconstructive Surgery
    • /
    • v.33 no.3
    • /
    • pp.241-248
    • /
    • 2011
  • Purpose: The aim of this study was to present the clinical results of maxillary sinus augmentation implants and to evaluate the effects of various factors on the implant survival rate. Methods: In a total of 112 patients, 293 implants after sinus augmentation were performed. The total survival rate and the influence of the following factors on implant survival were evaluated; patient characteristics (sex, age, smoking, general disease), graft material, implant surface, implant installation stage, site of implant placement, length and width of implant, closure method for osseous window, residual alveolar bone height. Results: 1. Age ranged from 16 to 70 yr, with a mean of 45.7 yr. 2. Cumulative survival rate for the 293 implants with the maxillary sinus augmentation procedure was 94.9%. 3. Simultaneous implant installation was performed in 122 patients and delayed implant installation was performed in 117 implants. The average healing period after sinus elevation was 7.3 months for delayed implant installation and this procedure had a significantly higher survival rate. 4. There were no significant differences in sex, age, smoking, general disease, site of implant placement, length and width of implant, residual alveolar bone height and the survival rate. 5. RBM (Resorbable Blasting Media) implant surface and allograft groups had significantly lower survival rates. Conclusion: These data suggest that maxillary sinus augmentation may give more predictable results for autogenous bone grafts and delayed implant placement.

A Study on the Application of Skirt Plates on Jacket Support Structures of Offshore Wind Turbines

  • Choi, Byeong-Ryoel;Choi, Han-Sik;Jo, Hyo-Jae;Lee, Sang-Hyep;Park, Young-Ho
    • Journal of Advanced Research in Ocean Engineering
    • /
    • v.4 no.2
    • /
    • pp.47-52
    • /
    • 2018
  • The Korea Offshore Wind Power (KOWP) is planning to construct offshore wind energy farms with an overall rated power of 2.5 GW in the south-western coast of the country until 2019. Various types of support structures for offshore wind turbines have been proposed in the past. Nevertheless, in South Korea, jacket structures have in general, been applied as support structures for offshore wind turbines owing to the many accumulated experiences and know-how regarding this kind of support structure. The choice of offshore structure is mainly influenced by site conditions such as seabed soil type and sea environment during installation. In installing jacket sets on the seabed, the mudmat is necessary to maintain the equilibrium of the jacket without the aid of additional devices. Hence, this study proposes the installation of skirt plates underneath the bottom frame of jackets in order to improve the installation stability of jacket structures under rougher sea conditions. To confirm the effect of skirt plates, installation stability analyses considering overturning, sliding and bearing capacity have been performed. From the results, it is shown that jacket structures with skirt plates can contribute to improving the sliding stability of the structures of new wind power farms, while providing economic benefits.

Identification of Factors Influencing the Operability of Precast Concrete Construction Shipment Request Forms

  • Jeong, Eunbeen;Jang, Junyoung;Kim, Tae Wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.145-152
    • /
    • 2022
  • Recently, interest in the precast concrete (PC) construction method has been increasing. The PC construction process consists of i) design, ii) production, iii) transportation, and iv) installation. A PC field manager at the site submits a shipment request form to the factory one to three days before the installation of the PC component. Numerous matters should be considered in writing a shipment request form. Incorrect shipment request forms may cause standby resources, waste of resources, premature work conclusion, or excessive work. These issues can lead to an increase in construction costs, replanning of PC component installation, or rework. In order to prevent such problems, PC component installation should be simulated based on the shipment request form. Accordingly, this study aims to identify factors influencing the operability of shipment request forms for PC construction. To this end, this study derived factors influencing i) initiation of the activity, ii) addition or deletion of activities, and iii) an increase or decrease in the activity execution time. As a result, this study identified flow, the features of PC components, condition of PC components, unloading location, installation location, input equipment and labor, number of anchors, number of supports, weather, strike, and accident. Further studies should verify the factors derived in this study based on focus group interviews.

  • PDF

A Study on the Installation Method of Down Conductors of the Lightning Protection System, using Rebar in Reinforced Concrete Structures (철근콘크리트 구조물 내의 철근을 활용한 피뢰설비 인하도선의 설치방법에 관한 연구)

  • Lee, Young-Chul;Lee, Ju-Cheol
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.7
    • /
    • pp.101-107
    • /
    • 2013
  • IEC Standards on lightning protection system specify the use of natural components as down conductors. This paper provides an analysis of problems revealed from our field investigation and survey conducted for the relevant experts in the construction site where natural components are used as down conductors. It also considers a suitable condition for installing natural components as down conductors in accordance with the latest version of the standard. As a result, when rebars of reinforced concrete are used as down conductors, vertical bars consisting of rebars of which thickness is not less than D13($127mm^2$) should be connected by welding, clamps or bound joints, using appropriate connection components conforming to IEC Standards. The lashed joints, however, shall not be applied for down conductors.

A Fundamental Research to Safety at Tower Crane Major Work (타워크레인 주요 작업의 안전성에 관한 기초 연구)

  • Lee, Sung-Ho;Joo, Jin-Kyu;Lee, Goon-Jae;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.151-152
    • /
    • 2011
  • As recent construction projects aim to build higher and bigger buildings, lifting operation is getting increasingly important in construction sites. Accordingly, as tower cranes get higher and higher, disasters involving tower cranes are also on the rise. According to occupational incident statistics of the Korea Occupational Health & Safety Agency (KOHSA), most of such incidents occur in installation, dismantling and climbing phases of tower crane. Therefore, it is essential to develop preventative measures to secure safety of tower crane operations, with critical focus on installation, dismantling and climbing of tower crane. Hence, this research attempts to measure criticality of key risk factors in installation, dismantling and climbing phases of tower crane on construction site and propose necessary safety measures. As a result, conclusions herein will contribute to minimize disasters and incidents involving tower cranes in high-rise building construction sites.

  • PDF

Field Demonstration of the Distribution STATCON-Installation & Evaluation (배전용 STATCON 설치 사례-설치 및 평가)

  • Cha, J.D.;Kim, J.M.;Hong, S.W.;Lee, H.S.;Lee, K.S.;Oh, K.I.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07f
    • /
    • pp.2641-2643
    • /
    • 1999
  • This paper describes the first field demonstration of the distribution STATCON in Korea including installation and its evaluation for improving power quality in distribution system. The purpose of installation is to verify functionally the voltage source inverter based equipment for voltage regulation and harmonic mitigation in distribution line. The operational data resulting from field test and the site figure are included.

  • PDF