• Title/Summary/Keyword: Installation sequence

Search Result 72, Processing Time 0.02 seconds

A Stduy on the Analysis and Application of Neutral Line Zero Sequence Currents Reduction Device in Lighting Loads (조명부하의 중성선 영상전류 저감장치 분석 및 적용에 관한 연구)

  • Kim, Kyung-Chul;Lee, Il-Moo;Jung, Yung-Ho;Paik, Seung-Hyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.3
    • /
    • pp.59-64
    • /
    • 2004
  • With the proliferation of nonlinear loads such as lighting facilities in all modern society high neutral harmonic currents have been observed. High neutral currents in three- phase four-wire distribution systems can cause lots of harmonic problems. The most common solution of neutral harmonic currents reduction is a zero phase sequence filter using zig-zag transformer. This paper analyzes a commercially available neutral line zero sequence currents reduction device and applies the equipment to lighting loads for eliminating harmonics. Experimental results are compared numerically and graphically with simulation results through the use of MATLAB.

Development of a Data Structure for Effective Monitoring of Power Plant Start-up Sequences (화력 발전소의 기동 시퀀스 진행 모니터링을 위한 자료구조 개발)

  • Lee, Seung-Chul;Han, Seung-Woo;Kim, Seung-Jin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.12
    • /
    • pp.224-232
    • /
    • 2009
  • Power plant start-up is a complicate process involving hundreds of operations that should be performed either automatically or manually. Several major operations should be proceeded in parallel and each major operation is again broken down into detailed operations that must be carried out in a strict sequence. Even though most of the operations are automated, still substantial portions of the operations are carried out manually and the operational status should be monitored by the crew members, which are quite stressful tasks to be performed in real time. In this paper, a data structure called an Event Sequence Monitoring Graph(ESMG) is proposed for monitoring a sequence of events involved in the power plant start-up process. The ESMG is currently being applied to a thermal power plant with a rated output of 500MW. An application example is shown with the boiler feed water pump system start-up process, which exhibits a good potential for future applications.

An online Calibration Algorithm using binary spreading code for the CDMA-based Adaptive Antenna Array

  • Lee, Chong-Hyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.9
    • /
    • pp.32-39
    • /
    • 2006
  • In this paper, an iterative subspace-based calibration algorithm for a CDMA-based antenna array in the presence of unknown gain and phase error is presented. The algorithm does not depend on the array geometry and does not require a prior knowledge of the Directions Of Arrival (DOA) of the signals. The method requires the code sequence of a reference user only. The proposed algorithm is based on the subspace method and root finding approach, and it provides estimates of the calibration vector, the DOA and the channel impulse response, by using the code sequence of a reference user. The performance of the proposed algorithm was investigated by means of computer simulations and was verified using field data measured through a custom-built W-CDMA test-bed. The data show that experimental results match well with the theoretical calibration algorithm. Also, teh study propose an efficient algorithm using the simulated annealing technique. This algorithm overcomes the requirement of initial guessing in the subspace-based approach.

A Re-Configuration Genetic Algorithm for Distribution Systems (배전계통에서 유전적 알고리즘을 이용한 접속변경순서결정방법)

  • Choi, Dai-Seub
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.05a
    • /
    • pp.490-491
    • /
    • 2004
  • Recently, sectionalizing switches have been coming to be operated by remote control through the distribution SCADA system. However, the problem of determining the optimal switching sequence is a combinatorial optimization problem, and is quite difficult to solve. Hence, it is imperative to develop practically applicable solution algorithms for this problem. Several efficient algorithms have been developed for finding approximate solutions to such problems. these algorithms create a new arbitral distribution system configuration from an initial configuration, and some of these algorithms do not show a load transfer sequence to reach the objective system.

  • PDF

Course Design Manual Development on the Job of Indoor Wiring Installations Using ISD and DACUM process for Work Based Curriculum Development (성과중심교육을 위한 옥내배선설비공사 수업 설계 교재 개발)

  • 김세동;김효진
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.363-368
    • /
    • 2002
  • Performance-based course design on the job of receiving substation installations is presented to achieve a work based curriculum development. It includes a job analysis method called ISD(Instructional Systems Design & Development) and DACUM(Developing a Curriculum) which is designed to accept various requirements of industrial fields. It is provided with course profile, key contents, terminal learning objectives, intermediate learning objectives, instruction strategy, instruction sequence, case study, action learning and lesson plan.

  • PDF

Course Design Manual Development on the Sob of deceiving Substation Installations Using ISD and DACUM process for Work Based Curriculum Development (DACUM 및 ISD 수업설계 분석을 통한 자가용 변전설비공사 실무 교계 개발)

  • 김세동;김효진
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2001.11a
    • /
    • pp.151-156
    • /
    • 2001
  • Performance-based course design on the job of receiving substation installations is presented to achieve a work based curriculum development. It includes a job analysis method called ISD(Instructional Systems Design & Development) and DACUM(Developing a Curriculum) which is designed to accept various requirements of industrial fields. It is provided with course profile, key contents, terminal learning objectives, intermediate learning objectives, instruction strategy, instruction sequence, case study, action learning and lesson plan.

  • PDF

BIM-Based Simulator for Rebar Placement

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.98-107
    • /
    • 2012
  • Reinforcing bars (rebar) comprise an integral part of a concrete structure, and play a major role in the safety and durability of the building. However, the actual placement or installation of rebar is not planned and controlled by the detailer. Recently, 4D simulations, using 3D model and scheduling software, have been used to improve the efficiency of the construction phrase. However, 4D simulators have not been introduced at the detailed level of work, such as rebar placement. Therefore, this paper suggests a BIM-based simulator for rebar placement to determine the sequence with which rebar is placed into the form. The system using Autodesk Revit API automatically generates rebar placement plans for a building structure, and labels the placement sequence of each individual bar or set of bars with ascending numbers. The placement sequence is then visualized using Autodesk Revit Structure 2012. This paper provides a short description of a field assessment and limits.

Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method (역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석)

  • Park, Yong-Hyeon;Ju, Young-Kyu
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.6
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.

A Study on Programmable Logic-based Smart Peak Power Control System (프로그램 로직 기반의 스마트 최대 전력 관리 시스템에 관한 연구)

  • Lee, Woo-Cheol;Kwon, Sung-Hyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.2
    • /
    • pp.92-99
    • /
    • 2014
  • The paper is related to smart maximum power system based on program logic. Especially, this system compares the total demand power with the target power by using the signal from the digital kilo watt meter. Based on the power information by the maximum power control equipment the consumed future power is anticipated. In addition, through consumed future power the controllable target power is set, and it applies on the maximum power control equipment. User or manager would control the load efficiently through the simple programming which could control load based on the control sequence and relay. To begin with the conventional maximum power control algorithm is surveyed, and the smart maximum power control system based on program logic is used, and the new algorithm from full load to proportion shut down is proposed by using PLC program. the validity of the proposed control scheme is investigated by both simulation results.

Harmonics Analysis and Reduction of Incheon International Airport (인천국제공항 여객터미널의 고조파분석에 의한 저감대책 강구)

  • Kim, Young-Ha;Lee, Sung-Jun;Kim, Dong Kun;Oh, Suk-Hyun;Kim, Mi-Ye
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.19 no.1
    • /
    • pp.87-93
    • /
    • 2005
  • In this paper, we perform the harmonic filter design for Incheon international airport, especially passenger terminal based on the results of measurement and analysis. Also, we show the waveform of machines which produce harmonics as a harmonic source. For harmonic filter design, we propose the APF(Active Power Filter) and ZSF(Zero Sequence Filter) design. Also, we simulate the filter effects using EDSA package. The results show the effectiveness of the method.