• Title/Summary/Keyword: Installation criteria

Search Result 298, Processing Time 0.034 seconds

A Study on Design Elements of Freeway Rest Areas for Drowsy Drivers (고속도로 졸음쉼터 설계요소 정립 연구)

  • Han, Da Jeong;Kim, Eungcheol;Yang, Jae Ho
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : In this study, design elements of rest areas for drowsy drivers are classified and appropriate criteria for each design element are presented. METHODS : By comparing and analyzing the design criteria for rest areas, the most appropriate installation criteria were suggested by considering the driving patterns of rest area users. RESULTS : As a result of the study, elements influencing the design of rest areas for drowsy drivers are suggested such as installation location and installation type. In addition, proper separation distance between resting areas was suggested considering vehicle flow, users' fatigue and physiological needs. Other criteria for rest areas were also suggested. CONCLUSIONS : Proper safety facilities were not installed in rest areas because appropriate criteria were not established. In this study, design elements were derived and installation criteria were designed so that rest areas could be used safely and conveniently.

A Study on Improvement of the Assessment Criteria for New and Renewable Energy Facilities in the G-SEED (G-SEED의 신·재생에너지시설 평가기준 개선 연구)

  • Kim, Wan-Young;Tae, Choon-Seob;Shin, U-Cheol;Yu, Chang-Kyun
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.6
    • /
    • pp.43-50
    • /
    • 2015
  • The G-SEED encourages the installation of new and renewable energy facilities through assessments of the new and renewable energy installation rates. The government also regulates the installation rate of new and renewable energy facilities in the 'Project on new and renewable energy obligation in public installations'. The current criteria concerning the new and renewable energy facilities in the G-SEED are the result of an amendment made in July 2010. As over five years have passed since this amendment, the assessment criteria needs to be reenforced. To improve the current criteria, the calculation results of the installation rate of new and renewable energy facilities in the G-SEED were analyzed and compared to the corresponding calculation results of the 'Project on new and renewable energy obligation in public installations'. And an improved draft for the assessment criteria of the new and renewable energy facilities in the G-SEED was proposed.

A Study on the Legal Standards and Design Guidelines on Disabled Auditorium in Cultural Facilities (문화시설 내 장애인 관람석에 대한 법적기준 및 문헌 연구)

  • Lee, Kijeong;Yoon, Taejun;Park, Hyeonsoo
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.21 no.4
    • /
    • pp.37-47
    • /
    • 2015
  • Purpose: Due to increase of interest in the viewing environment for the disabled, ordinances that are related to an optimal auditorium for the disabled are being executed. However, since there are no detailed criteria regarding the optimal auditorium, there is a necessity that it should be supported by more concrete criteria for installation. Therefore, the study is aimed to be utilized as basic data to suggest the criteria for installation of the optimal auditorium in the future through domestic and international legal standards and the analysis of design guidelines that are related to the auditorium for the disabled. Methods: First, legal standards and design guidelines that are related to the auditorium for the disabled were analyzed, and Second, items and things to be improved that are required to suggest the criteria for installation of the optimal auditorium in the future were looked into by comparing and analyzing each contents. Results: Items and considerations by items that are required to establish the criteria for installation of the optimal auditorium were looked into, and based on these results, concrete and standardized installation criteria can be suggested. Implications: Based on the analysis results, the optimal viewing environment for the disabled within cultural facilities can be created through establishment of more concrete installation criteria for the optimal auditorium in the future.

Electrical Environmental Effects of Power System (전력설비의 전기환경장해)

  • ;申玖容
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.13 no.2
    • /
    • pp.156-156
    • /
    • 1999
  • This paper describes the characteristics and the criteria of electrical environmental effects produced from power system especially transmission line. Audible noise radio and TV interference, electric and magnetic inductions which are main items for optimal conductor selection as well as major contributors to the community complaint of electrical environmental problem, are surveyed and studied comparing with the criteria or the environmental protection regulation of domestic and foreign countries. As a result a domestic criteria of electrical environmental on power system was suggested.

A Study on the Assessment of Safety Performance for Complex Installation System of Stationary Fuel Cell and Boiler (건물용 연료전지-보일러 복합설치 안전성능 평가에 관한 연구)

  • Kim, Min-Woo;Lee, Eun-Kyung;Oh, Gun-Woo;Lee, Jung-Woon;Lee, Seung-Kuk
    • Korean Journal of Hazardous Materials
    • /
    • v.6 no.2
    • /
    • pp.77-86
    • /
    • 2018
  • Interest in renewable energy is increasing for eco-friendly use of energy, and fuel cells are being used in various ways such as houses and buildings as power generation methods that have low emissions such as $NO_X$ and $CO_2$. As the supply of fuel cells expands, more and more boilers are installed in the existing buildings, but safety management is not being performed properly. Therefore, in this study, a prior study was conducted on the status of fuel cell-boiler complex installation and related criteria, and the risk factors were analyzed according to the installation environment and structure. Based on these standards, the safety performance of the fuel cell-boiler combined installation is assessed by conducting a demonstration using the starting product of the simulated operation to derive the installation criteria (proposal) for the fuel cell-boiler combined installation. The installation criteria (proposal) include the construction and connection method of the piping according to the fuel cell-boiler complex installation.

Study on the Development of Road Safety Judgment Indicators to Establish of Installation Criteria of Safety Facility (안전시설 설치 기준 마련을 위한 도로안전 판단지표 개발연구)

  • Kim, Do Kyeong;Hwang, Jae Seong;Lee, Jae Hyeong;Lee, Cheol Ki
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.6
    • /
    • pp.192-202
    • /
    • 2021
  • In the past, various studies have been conducted on safety facility installation standards and road safety indices. But there are limitations in applying them to the field, such as using many survey items and variables that are difficult to use. Therefore, this study attempted to develop road safety judgment indicators considering the applicability of the research results and to prepare criteria for installing safety facilities. As part of the study, data of related systems were reviewed, and the use of variables already in use was figured out. Furthermore, the road safety judgment indicators reflecting traffic, road, and accident factors were developed through correlation and factor analysis. Later, the criteria score for determining the installation of safety facilities was derived through cluster analysis. The analyses suggested, that the installation judgment criterion score at the intersection was lower than that of the single road(crosswalk), and the road risk at the intersection was higher.

Analysis on Installation Criteria for Scrambled Crosswalks Considering Vehicle and Pedestrian Traffic Volume (교통량과 보행량을 고려한 대각선 횡단보도 설치기준 정립 방안 연구)

  • NAM, Chanwoo;KHO, Seung-Young;CHO, Shin-Hyung
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.18 no.6
    • /
    • pp.60-75
    • /
    • 2019
  • Nowadays, interest in safety of pedestrians who are relatively weak when compared with vehicles increases. Also, concern for pedestrian accidents on crosswalks increases. For these reasons, scrambled crosswalks which are considered to contribute pedestrian safety by reducing conflicts between vehicles and pedestrians are actively discussed and there are also a few intersections where they are actually installed. However, scrambled crosswalks must include all-red phase for all vehicle traffic flows, which inevitably leads to increase of lost time per cycle. Therefore, evaluation in terms of efficiency should be done before installation of scrambled crosswalks. This research suggests installation criteria for scrambled crosswalks so that it is possible to judge whether installation of scrambled crosswalks is appropriate only by surveying vehicle traffic volume and pedestrian traffic volume. This research derives optimum cycle length from signal optimization models which considers both vehicle traffic volume and pedestrian traffic volume. From this optimum cycle length, this research compares total delay time before and after installation of scrambled crosswalks. From an analysis, two research results are derived. Firstly, there is critical traffic volume above which installation of scrambled crosswalks can not efficient. Secondly, appropriate areas for installation of scrambled crosswalks are different by each signal intersection or by each signal system and those difference vary. From these results, this research suggests installation criteria for scrambled crosswalks which consists of two steps. The delay time of the pedestrians may be increased after the diagonal crosswalk is installed, but it may be desirable to install in consideration of the appropriate traffic level to ensure safety.

Performance based Construction Specifications and Design Criteria Development Plan of Electrical Installations (건축전기설비분야의 성능중심 건설기술기준 작성 지침 개발)

  • Kim, Se-Dong;Lee, Kwang-Sik;Choi, Eun-Hyeok
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.209-212
    • /
    • 2007
  • It is increased electrical energy consumption with the development of intelligence society in buildings and thus an energy conservation through efficient use of electricity and reliability, safety, etc became more important. This research paper intensively investigated performance based construction specifications and design criteria of electrical installations in domestic and foreign country. It is necessary to analyze the key features based on performance and general trend about contractor guarantee, warranty method, performance design criteria from the investigated data. This paper shows a reasonable performance based construction specifications and design criteria of electrical installations.

  • PDF

The New Criteria of Dissolved Gas Analysis for Oil-Filled Transformers Using a Cumulative Distribution Function

  • Cho, Sung-Min;Kim, Jae-Chul;Kweon, Dong-Jin;Koo, Kyo-Sun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.9
    • /
    • pp.87-94
    • /
    • 2007
  • This paper presents new criteria for DGA(Dissolved Gases Analysis) using CDF(Cumulative Distribution Function) obtained from the data from the diagnosis of transformers operated in KEPCO over a period of 16 years. Because of differences in operating environments, construction type, oil volume, and other factors, the interpretative criteria of DGA at KEPCO differs from other standards such as IEC-60599, or Rogers and Doernenburg. To suggest the most appropriate criteria, the DGA data from transformers under normal conditions as well as from developing fault transformers were collected. Using these data, this study suggests the limitative gas level of transformers under normal operating conditions and verifies the suitability of the criteria. Because the application of this new criterion to transformers at KEPCO increases the detectable ratio of incipient faults and reduces unnecessary follow-up sampling and analysis, the new criteria yields a more reliable prediction of transformer condition.