CAD 정보를 활용한 해양 배관재 설치 준비율 관리 방법에 관한 연구 (A Study on the Installation Readiness Management Method of Offshore Plant using CAD Information)

  • 박중구;김호정;김민규;박지찬
    • 대한조선학회논문집
    • /
    • 제56권2호
    • /
    • pp.152-160
    • /
    • 2019
  • In this study, we propose a piping material supply management method using CAD system. The piping materials installed in super large offshore plants have very complicated connection conditions. Therefore, it is very difficult to determine the order of receipt of a large number of installation materials. Therefore, we have developed a system that can automatically check the preparation rate of installation materials prior to the installation process. We have developed an algorithm to obtain connection information among installation items from PDMS system. We have developed an algorithm that can determine the order of installation materials to be installed using the connection information. The order of the installation material is determined by taking into account the constraint conditions for the complete installation of the piping material. We confirm the effectiveness of the developed algorithms in the operating system. This system is also used to manage installation schedules and plan the installation manpower.

SPD의 설치조건이 보호효과에 미치는 영향 (Protection Effects Associated with Installation Conditions of SPD)

  • 이복희;이동문;정동철;이승칠
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2005년도 춘계학술대회논문집
    • /
    • pp.298-302
    • /
    • 2005
  • This paper presents the protection effect of SPDs according to installation conditions. To develop the effective protection countermeasures of information and communication equipments against lightning surges, actual-sized experiments in relation to the protection effects on the installation positions of surge protective devices(SPDs), the length of branch circuit the materials and long of conduit were conducted. The best method for protecting the electronic equipments from surges is to install the SPD at the front point of the devices to be protected. The installation method of the metal conduit bonded with common ground conductor were more effective than that of the PVC conduit.

  • PDF

지중송전선로 병행지선 최적 설치 방안에 관한 연구 (A Study on Optimal Installation Method of Earth Continuity Conductor on Underground Power Cable Systems)

  • 정채균;강지원;윤종건;김양상
    • 전기학회논문지
    • /
    • 제58권9호
    • /
    • pp.1689-1694
    • /
    • 2009
  • In a previous paper, the characteristics of ECC (earth continuity conductor) have been analysed for reducing the level of induced sheath voltage considering the dimension and position of ECC, the spacing between ECC and three phase cables, and the use of two ECC conductors at the single point boned section of underground power cable system. From these results, the study conditions for optimal installation has been selected such as installation section, conductor size and etc. In this paper, 5 cases which are set by possible installation conditions are tested based on previous research results. Finally, the optimal installation method of ECC is selected on underground power cable systems.

우량계 설치조건에 따른 관측치 신뢰성 평가 연구 (A Study on Confidence Evaluation of the Observed Data According to the Rain Gauges Installation Conditions)

  • 박지창;김남;강명주;류경식
    • 한국환경과학회지
    • /
    • 제18권10호
    • /
    • pp.1115-1121
    • /
    • 2009
  • The purpose of this study is to estimate the impact of rainfall measurement according to the installation conditions of rain gauges: windbreak, grass mat, installation elevation or obstacle. Rain gauges were installed by the standards of Korea Meteorological Administration(KMA), and the rainfall measurement was conducted daily unit during two years(2007~2008). In conclusion, observed error of rain gauge did not affect whether windbreak was installed or not. If there is the obstacle around rain gauge, average error rate was increased about 3.3%: (2007year-2.49%, 2008year-4.10%). If rain gauge is located in a high place, average error rate was increased about 4.89%. Additionally, the observed error of rain gauge according to the wind speed has a positive correlation with obstacle and installation elevation and has a negative correlation with windbreak and has no affection with grass mat.

실제 설치 및 유지보수 조건을 고려한 고속도로 터널조명 보수율 산정 연구 (A Study on the Calculation of Maintenance Factor(MF) of Tunnel Lighting in Expressway Considering the Actual Installation and Maintenance Conditions)

  • 이민욱;박광용;김필영;박용진;김훈
    • 조명전기설비학회논문지
    • /
    • 제27권3호
    • /
    • pp.7-15
    • /
    • 2013
  • In lighting design, the calculation of maintenance factor is performed by calculation considering light source, characteristics of luminaire and environmental factors. The method to calculate the current maintenance factor applied to tunnel lighting design takes into consideration only pollution factors in tunnels. In addition, the calculation method should be change in response to changes of tunnel conditions and used light sources. In this study, the calculated factor of the maintenance factor in tunnel is determine by four calculation factors generally applied to the calculation of maintenance factor. This study examined the method of calculating the maintenance factor of tunnel lighting that can be applied according to the installation conditions in designing tunnel lighting by applying the actual installation data of luminaire.

장죽수로 조류발전건설시 작업특성에 따른 산업잠수 작업한계 (Critical Limits of Commercial Diving on the Construction of Tidal Current Power in Jangjuk Channel)

  • 김원석
    • 수산해양교육연구
    • /
    • 제25권3호
    • /
    • pp.733-742
    • /
    • 2013
  • The Korea has significant tidal current energy resources, but it is so hard to work underwater for tidal turbine installation. Therefore commercial diving work is very important for tidal current generator. Also, Jangjuk channel is vary famous as proper area to generate tidal current energy. Nevertheless, no one is studied about characteristics of commercial diving works with installation of tidal current generator. The purpose of this study is to introduce commercial diving with work types and investigate critical limits of diving working under the conditions, which are working only to minutes at slack tide during the neap tide. As the results, work types are five as like mooring installation, OMAS(Offshore Maintenance Access System), support structure installation, cable and turbine installation. Here, the original construction period is expected about 4 months, but the construction take 18 months to complete. The cause of extends construction period is insufficiency of researching tidal current conditions at the site and ignorance of slack tide which need to secure diving working time. Total diving working times are 110th during 18 months, the highest percentage of diving times is turbine installation about 43.6 %, and cable, mooring installation and support structure construction are 27.3 %, 15.5 %, 13.6 %, respectively. On the basis of this study, estimation of times of commercial diving is possible with work types of tidal current power, and has a significance as basic data to determining construction period.

모형시험을 통한 복열 마이크로파일의 설치조건에 따른 수평 지지력 변화 (Variations of Lateral Bearing Capacity of 2-row Micropile with Installation Conditions by Model Test)

  • 황태현;김무연;이영생
    • 한국지반공학회논문집
    • /
    • 제36권11호
    • /
    • pp.35-49
    • /
    • 2020
  • 마이크로파일의 수평 지지력은 파일의 본 수, 설치 각도와 간격 등 설치조건에 좌우된다. 마이크로파일에 관한 기존 연구는 연직 지지특성에 대한 평가와 효과적인 설치방법의 제안 등에 국한되어 있고, 파괴 모드와 같은 파괴 메커니즘 등에 대한 연구는 거의 없는 실정이다. 또한 대부분의 수평 지지력에 관한 연구도 단열 마이크로파일(1-row micropile)에 관한 것이다. 이에 본 연구에서는 파일의 설치 길이, 각도, 간격 등 설치조건을 달리한 경우 복열 마이크로 파일(2-row micropile)의 거동 및 지지특성을 평가하기 위하여 모형시험을 수행하였다. 모형시험결과, 설치 각도 θ > 0°인 경우(비교차 설치)의 복열 마이크로파일의 수평 지지력은 파일의 간격에 좌우되며, 설치 각도 θ = +30°인 조건이 지지력 증대에 가장 효과적이었다. 또한 설치 각도 θ < 0°인 경우(교차 설치)에는 파일의 간격과 각도에 좌우되며, 설치 각도 θ = -15°인 조건이 지지력 증대에 가장 효과적인 것으로 나타났다.

Numerical analysis results of the cathodic protection for the underground steel pipe by anode installation method

  • Jeong, Jin-A;Choo, Yeon-Gil;Jin, Chung-Kuk;Park, Kyeong-Wan
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제38권10호
    • /
    • pp.1212-1216
    • /
    • 2014
  • This study aims to find out the best anode location for buried pipelines. Numerical simulation program known as CATPRO (Elsyca, Belgium) were used for confirming the best location of anodes and the effects of impressed current cathodic protection system. Applied conditions for numerical simulation were similar to on-site environmental conditions for optimal application of cathodic protection system. Used criterion of cathodic protection was NACE SP 0169, which describes that minimum requirement for cathodic protection is -850mV vs. CSE. Various layouts for anodes' installation were applied, which were distance between anodes, anode installation location, and applied current. The areas where cathodic protection potential was lower than -850mV vs. CSE was limited up to 50m from anode installation locations. It was founded numerical analysis obtain cost-effective and efficient cathodic protection methods before design and application the impressed cathodic protection system to on-site environment.