• Title/Summary/Keyword: Inspection Equipment

Search Result 655, Processing Time 0.024 seconds

Fabrication of high brightness multi-lamp backlight system for a large size LCD panel inspection equipment

  • Chun, Young-Tea;Lim, Sung-Kyoo;Lee, Kwang-Kyu;Lee, Hwan-Woong
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.787-790
    • /
    • 2004
  • The large size and high brightness backlight system for LCD panel inspection equipment was designed, fabricated, and evaluated. The cold cathode fluorescent lamp (CCFL) instead of the hot cathode fluorescent lamp (HCFL) were used as the light source. The inverters for driving multi-lamp CCFL backlight systems were also designed and fabricated. The measured luminance of the fabricated CCFL backlight system was 20,000 cd/$m^2$ and the uniformity of the backlight was 85%. The fabricated backlight system was successfully applied to the LCD panel inspection equipment.

  • PDF

Status of Inspection and Management for Nuclear Power Plants Snubbers (원전 방진기 검사 및 관리 현황)

  • Cho, Yong-Bae;Moon, Gyoon-young;Yoo, Hyun-Joo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.10 no.1
    • /
    • pp.20-24
    • /
    • 2014
  • Recently, it is getting more and more important ensuring the integrity for the equipment degradation according to the increase of nuclear power plant operating period. In many equipment of the nuclear power plant, snubbers mainly installed in reactor coolant pumps, steam generators and piping protected the equipment and piping from the occurrence of transient dynamic loads such as the earthquake, thermal load during the plant operation. This report describes the function, regulation, inspection requirements and management status of the snubbers installed in domestic nuclear power plants.

A Case Analysis Study on the Validity Assessment of Safety Inspection Findings for Reconstruction - Focusing on the Building Finish and Equipment Deterioration Sector - (공동주택 재건축 안전진단 적정성 검토 사례분석 연구 - 건축 마감 및 설비노후도 평가 중심으로 -)

  • Jeon, Jun-Seo;Kim, Hong-Seop;Kim, Eun-Young;Choe, Gyeong-Cheol;Lee, Mun-Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.271-272
    • /
    • 2023
  • In this study, we conducted a case analysis of the building finish and equipment deterioration sector in the validity assessment of safety inspection findings for reconstruction. A total of 21 cases were analyzed to confirm the characteristic of performance score for each subsector. It is confirmed that the average performance score was generally affected by maintenance activity, had regional characteristics.

  • PDF

A Study on Management Measures to Maintain the Performance of Personal Protective Equipment(Hard Hat, Safety Belt) (개인보호구(안전모, 안전벨트) 성능 유지를 위한 관리방안에 관한 연구)

  • Kim, Ja-Yeon
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.1
    • /
    • pp.11-19
    • /
    • 2022
  • In order to find out the management and sanitation status of protective gear provided at the construction site, a case study and survey were conducted by visiting the site. As a result of the case study, inspection and management, disinfection, and storage of protective equipment were insufficient in both workplaces with less than 50 employees and workplaces with more than 100 employees. As a result of the survey, workers(66.2%), said they did not know how to identify hard hats(67.6.%), how to identify bad hard hats(60.8%), and how to identify bad safety belts (73.0%), even though workers(66.2%) were educated on protective gear, and those in charge of protective gear Non-specified(56.8%), regular inspection of the provided protective equipment was not performed(82.4%), and disinfection was not performed(90.5%). Therefore, as a management plan to maintain the performance of personal protective equipment, educational aspects, regular training on protective equipment, training on how to identify defective protective equipment, management of recording papers, technical aspects, strengthening of standards for placement of dedicated safety managers in small workplaces, participation of workers' representatives when selecting protective equipment, and selection of protective equipment for workers Providing opportunities, administrative aspects of protective equipment regulation and management, introduction of sanitary and cleanliness system, and selection of personnel in charge of protective equipment management were suggested.

Kinematics Analysis of a 5-Axis Ultrasonic Inspection Equipment (5축 초음파 검사장비의 기구학 해석)

  • Han, Myung-Chul;Sung, Chang-Min
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.32 no.1
    • /
    • pp.89-96
    • /
    • 2015
  • In this paper, it is studied that kinematic analysis of a 5-axis ultrasonic inspection equipment. The equipment is comprised of three straight axes and two rotary axes. With features of ultrasonic, the transmitter and receiver of the equipment are vertical to a test surface, operating at regular intervals. To perform this well, the motions of every link should be found on the based of kinematic analysis of the equipment. We chose starting point for testing and defined relations among all links through transformation of coordinates. For double curvature-shaped test object, we generated test paths. To follow these, we found motions of all links using inverse kinematics. By using Matlab/Simulink, simulator was developed, so that we could find out desired trajectories of main axes for a scan.

Analysis of Maintenance Conditions for Small Photovoltaic Equipment (소형 태양광발전설비의 유지관리 실태 분석)

  • Kang, Seok-Hwa;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.115-116
    • /
    • 2014
  • This study investigated power generation of photovoltaic equipment at detached houses. The study estimated monthly mean generation according to maintenance conditions that included module cleaning, inspection into generation, cleaning of module and photovoltaic generation. At analysis upon generation, households with periodical module cleaning and inspection into generation, clean module and good generation conditions had high generation. 20-years of PV equipment life varied much depending upon maintenance conditions. Users should keep module clean and inspect generation regularly and put PV equipment at the place with good solar radiation.

  • PDF

Implementation of Line Scan Camera based Training Equipment for Technical Training of Automated Visual Inspection System (자동 시각 검사 시스템 기술훈련을 위한 라인스캔 카메라 기반의 실습장비 제작)

  • Ko, Jin-Seok;Mu, Xiang-Bin;Rheem, Jae-Yeol
    • Journal of Practical Engineering Education
    • /
    • v.6 no.1
    • /
    • pp.37-42
    • /
    • 2014
  • The automated visual inspection system (machine vision system) for quality assurance is important factory automation equipment in the manufacturing industries, such as display, semiconductor, etc. There is a lot of demand for the machine vision engineers. However, there are no technical training courses for machine vision technologies in vocational schools, colleges and universities. In this paper, we present the implementation of line scan camera based equipment for technical training of the automated visual inspection system. The training system consists of the X-Y stage which is widely used in machine vision industries and its variable image resolution are set to $10-30{\mu}m$. Additionally, this training system can attach the industrial illumination, either the direct illuminator or coaxial illuminator, for verifying the effect of illuminations. This means that the trainee can have a practical training in various equipment conditions and the training system is similar to the automated visual inspection system in industries.

Application of Risk-Based Inspection with Financial Risk for a Petrochemical Process (석유화학공정에서 재정적 위험도에 의한 위험기반검사의 적용)

  • Kim, Tae-Ok;Lee, Joong-Hee;Choi, Sung-Kyu;Lee, Hern-Chang;Jo, Ji-Hoon
    • Journal of the Korean Institute of Gas
    • /
    • v.13 no.4
    • /
    • pp.53-60
    • /
    • 2009
  • For the case of the facilities using utilities such as cooling water and steam, risk of the facilities is zero because the consequence of failure (COF) through equipment damage area is zero. Therefore, to improve the estimation method of the risk by COF through equipment damage area in the risk-based inspection (RBI), this study developed the procedures of RBI, in which the risk was estimated by COF through financial loss. And, the RBI program (KS-RBI Ver 3.1) was developed to establish inspection interval based on the risk of the facilities estimated by COF through equipment damage area and financial loss, simultaneously, and the developed RBI program was applied to a petrochemical process. As a result, risks of the facilities estimated by COF through financial loss were similar to risks by COF through the equipment damage area. But, for the case of the facilities using utilities or expensive facilities, the estimation method of the risk by COF through financial loss was more accurate than through equipment damage area.

  • PDF

Development of Memory Controller for Punctuality Guarantee from Memory-Free Inspection Equipment using DDR2 SDRAM (DDR2 SDRAM을 이용한 비메모리 검사장비에서 정시성을 보장하기 위한 메모리 컨트롤러 개발)

  • Jeon, Min-Ho;Shin, Hyun-Jun;Jeong, Seung-Heui;Oh, Chang-Heon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.6
    • /
    • pp.1104-1110
    • /
    • 2011
  • The conventional semiconductor equipment has adopted SRAM module as the test pattern memory, which has a simple design and does not require refreshing. However, SRAM has its disadvantages as it takes up more space as its capacity becomes larger, making it difficult to meet the requirements of large memories and compact size. if DRAM is adopted as the semiconductor inspection equipment, it takes up less space and costs less than SRAM. However, DRAM is also disadvantageous because it requires the memory cell refresh, which is not suitable for the semiconductor examination equipments that require correct timing. Therefore, In this paper, we will proposed an algorithm for punctuality guarantee of memory-free inspection equipment using DDR2 SDRAM. And we will Developed memory controller using punctuality guarantee algorithm. As the results, show that when we adopt the DDR2 SDRAM, we can get the benefits of saving 13.5 times and 5.3 times in cost and space, respectively, compared to the SRAM.