• Title/Summary/Keyword: Inner gate

Search Result 83, Processing Time 0.027 seconds

Ion Electrical and Optical Diagnostics of an Atmospheric Pressure Plasma Jet

  • Ha, Chang Seung;Shin, Jichul;Lee, Ho-Jun;Lee, Hae June
    • Applied Science and Convergence Technology
    • /
    • v.24 no.1
    • /
    • pp.16-21
    • /
    • 2015
  • The characteristics of an atmospheric pressure plasma jet (APPJ) in He discharge are measured with electrical and optical diagnostics methods. The discharge phenomenon in one cycle of the APPJ was diagnosed using intensified charge coupled device (ICCD) imaging. The gate mode images show that the propagation of plasma bullets happens only when the applied voltage on the inner conductor is positive. Moreover, the Schlieren image of the plasma jet shows that the laminar flow is changed into a turbulent flow when the plasma jet is turned on, especially when the gas flow rate increases.

A study of warpage caused by glass fiber orientation in Injection Molding to Upper Frame of Magnetic Contactor in 85 AF (Magnetic Contactor Upper Frame 사출성형시 유리섬유 배향에 따른 뒤틀림 변형에 관한 연구)

  • Park, Jin-Young;Cho, Hae-Yong;Kim, Kil-Su;Hwang, Han-Seong
    • Proceedings of the KSME Conference
    • /
    • 2000.11a
    • /
    • pp.766-771
    • /
    • 2000
  • As using of insulating material of plastic to industrial electric field, thermoset has been gradually substituted for thermoplastic. But changing the material with crystalline has some problem, which is strength or warpage, Especially getting a strength to endure inner pressure is necessary when arc is occurred. So we use the material that is composed of glass fiber to compensate strength. By the way as the reinforced glass-fiber material is used in injection molding, unstableness of dimension is appeared frequently and it is difficult to know warpage pattern. So this paper will be contributed to know warpage pattern of mold product that is upper frame of magnetic contactor caused by glass-fiber orientation with fixed gate-system, when glass-fiber reinforced material with classification of poly-amide is used in injection molding.

  • PDF

Optimized Space Vector Pulse-width Modulation Technique for a Five-level Cascaded H-Bridge Inverter

  • Matsa, Amarendra;Ahmed, Irfan;Chaudhari, Madhuri A.
    • Journal of Power Electronics
    • /
    • v.14 no.5
    • /
    • pp.937-945
    • /
    • 2014
  • This paper presents an optimized space vector pulse-width modulation (OSVPWM) technique for a five-level cascaded H-bridge (CHB) inverter. The space vector diagram of the five-level CHB inverter is optimized by resolving it into inner and outer two-level space vector hexagons. Unlike conventional space vector topology, the proposed technique significantly reduces the involved computational time and efforts without compromising the performance of the five-level CHB inverter. A further optimized (FOSVPWM) technique is also presented in this paper, which significantly reduces the complexity and computational efforts. The developed techniques are verified through MATLAB/SIMULINK. Results are compared with sinusoidal pulse-width modulation (SPWM) to prove the validity of the proposed technique. The proposed simulation system is realized by using an XC3S400 field-programmable gate array from Xilinx, Inc. The experiment results are then presented for verification.

A study on the impedance effect of nonvolatile memory devices (비휘발성 기억소자의 저항효과에 관한 연구)

  • 강창수
    • Electrical & Electronic Materials
    • /
    • v.8 no.5
    • /
    • pp.626-632
    • /
    • 1995
  • In this paper, The effect of the impedances in SNOSFET's memory devices has been developed. The effect of source and drain impedances measured by means of two bias resistances - field effect bias resistance by inner region, external bias resistance. The effect of the impedances by source and drain resistance shows the dependence of the function of voltages applied to the gate. It shows the differences of change in source drain voltage by means of low conductance state and high conductance state. It shows the delay of threshold voltages. The delay time of low conductance state and high conductance state by the impedances effect shows 3[.mu.sec] and 1[.mu.sec] respectively.

  • PDF

A study on shrinkage deformation according to injection molding conditions of pipe (annular) shaped products (파이프(Annular) 형상 제품의 사출성형 조건에 따른 수축 변형에 관한 연구)

  • Jeon, Dae-Seon
    • Design & Manufacturing
    • /
    • v.15 no.2
    • /
    • pp.36-41
    • /
    • 2021
  • The 3 dimensional Pipe (Annular) Shaped Products was selected as a test sample, then a attribute of a molding shrinkage according to the parameters of a injection process was examined with PC, which is the typical engineering plastic. Both the inside and the outside diameter of the Pipe (Annular) sample were shrank into the inner direction of the part. And then the comparative analysis of the samples proved that a increasing thickness led a bigger shrinkage rate in the equal outside diametric samples, and a decreasing outside diameter caused a bigger shrinkage rate in the same thickness samples. The comparative study of the cushion volume of a injection machine showed that the molding shrinkage was most affected by the pressure strength among the resin temperature, the maintenance pressure strength and the maintenance pressure duration time. Each of the shrinkage rates according to the measuring direction and the gate position was different. As a result, the injection molded sample had not a typical circular shape.

Optimum Design of Rubber Injection Molding Process (고무사출성형의 적정설계)

  • Lee, Eun-Ju;Lim, Kwang-Hee;Giang, Vu Tai
    • Korean Chemical Engineering Research
    • /
    • v.49 no.1
    • /
    • pp.47-55
    • /
    • 2011
  • The optimum mold design and the optimum process condition were constructed upon executing process simulation of rubber injection molding with the commercial CAE program of MOLDFLOW (Ver. 5.2) in order to solve the process-problems of K company relating to cracks, which occurs at the inner cavity wall of C. V. joint boots. As a result it was confirmed that the real cracks occurs at the exactly same position of the cavity as exhibits the defects of weld and meld line and unsatisfactory curing according to the result of simulation. In order to prevent the occurrence of weld and meld line at the defect-position, the location of gate was altered to the optimum position of the cavity. Consequently the filling pattern was established to minimize the degree of the melt-fronts confronting or the melt-flows melding to prevent the occurrence of weld and meld line at the defect-position. It was observed that both gate-positions to maximize the degree of the formation of weld and meld line and air traps are located, respectively, in opposite direction each other with reference to the optimum gate position. In addition, the temperature of mold was raised by $10^{\circ}C$ and maintained at $170^{\circ}C$ for satisfactory curing.

A Study on the estimation of traffic congestion for Pyeongtaek·Dangjin port development (평택·당진항의 내항개발에 따른 교통혼잡도 평가에 관한 연구)

  • Gug Seung-Gi;Kim Se-Won;Kim Jung-Hoon
    • Journal of Navigation and Port Research
    • /
    • v.29 no.6 s.102
    • /
    • pp.481-485
    • /
    • 2005
  • The port entry system of the inner harbor in Pyeongtaek${\cdot}$Dangjin was planned as lock-gate in 'Master plan project on port planning in Asan industry base(1990)‘, but was changed to tidal harbor in 'Project maintaining Master plan for comprehensive development of Pyeongtaek${\cdot}$Dangjin port(2001)'. Accordingly, southern sea bank constructed under the lower part of Seohae-bridge will be removed so that inbound/outbound vessels for the inner harbor can navigate at all times. However, in the view of the safety on passing through the lower of Seohae-bridge, navigating conditions for the inner harbor will be restricted in the single-way of 50,000 DWT vessel and the two-way of vessel less than 30,000 DWT Therefore, this study carried out the estimation of traffic congestion arising from these vessels with above restrictions q[ter supposing annual inbound/outbound vessel's numbers for loading and unloading cargo surveyed on the inner harbor.

A Study on the estimation of traffic congestion for Pyeongtaek (Asan) port development (평택(아산)항 개발에 따른 교통혼잡도 평가에 관한 연구)

  • Kuk, Seung-Gi;Kim, Se-Won;Kim, Jeong-Hoon
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.29 no.1
    • /
    • pp.191-195
    • /
    • 2005
  • The port entry system of the inner harbor in Pyeongtaek (Asan) was planned as lock-gate in 'Master plan project on port planning in Asan industry base(1990)', but was changed to tidal harbor in 'Project maintaining Master Plan for comprehensive development of Pyeongtaek (Asan) port(2001)'. Accordingly, southern sea bank constructed under the lower part of Seohae-bridge will be removed so that inbound/outbound vessels for the inner harbor can navigate at all times. However, in the view of the safety on passing through the lower of Seohae-bridge, navigating conditions for the inner harbor will be restricted in the single-way of 50,000 DWT vessel and the two-day of vessel less than 30,000 DWT. Therefore, this study carried out the estimation of traffic congestion arising from these vessels with above restrictions after supposing annual inbound/outboubd vessel's numbers for loading and unloading cargo surveyed on the inner harbor.

  • PDF

A Study on the Change of Current in the Vicinity of Mokpo Harbor and Its Impact on Ship Operation due to the Discharge through Yongsan River Estuary Weir and Yongam-Kumho Sea Dike (영산강 하구둑 및 영암-금호방조제의 방류에 의한 목포항 주변수역의 유동변화 및 선박운용에 미치는 영향에 관한 연구)

  • 정대득;이중우;국승기
    • Journal of Korean Port Research
    • /
    • v.13 no.1
    • /
    • pp.133-146
    • /
    • 1999
  • Mokpo coastal area is connected to the adjacent a long river and two large basins. It is essential for port planning coastal zone management and environmental impact study to analyze the data related to the ship operation and variation of current and water quality due to the development of water area including dredging reclamation and estuary barrage. The Yongsan river estuary weir and Yongam-Kumho basins discharge much of water through water gates for the purpose of flood control and prohibit salt intrusion at the inland fresh water area. To meet this purpose discharge through the gates have been done at the period of maximum water level difference between inner river and sea level. This discharged water may cause the changes of current pattern and other environmental influences in the vicinity and inner area of semi-closed Mokpo harbor. In this study ADI method is applied to the governing equation for the analysis of the changes on current pattern due to discharged water. As the results of this study it is known that the discharging operation causes many changes including the increase of current velocity at the front water area at piers approaching passage and anchorages. Discussion made on the point of problems such as restricted maneuverability and the safety of morred vessels at pier and anchorage. To minimize this influence the linked gate operation discharging warning system and laternative mooring system are recommended.

  • PDF

A Study on the Basic Planning of the Nam-Hae Sin-Sa Architecture (남해신사 기본계획에 따른 신당건축 고찰)

  • Kim, Sang Tae;Jang, Hun Duc
    • Korean Journal of Heritage: History & Science
    • /
    • v.42 no.2
    • /
    • pp.62-85
    • /
    • 2009
  • The Nam-Hae Sin-sa, the South Sea shrine in Yeong-Am, Korea was a national institution for public peace and bliss, was excavated in 2000, and the shrine and the 3-way-gate were reconstructed in 2001. Hae Sin-sa, the Sea shrine is a place for religious service separated into the Nam-Hae Sin-sa, the Dong-Hae Myo, and the Seo-Hae Dan. The Dong-Hae Myo was reconstructed, but restored shrine and 3-way-gate of the Nam-Hae Sin-sa is not perfect in comparison with excavation plan in 2000, therefore new reconstruction was researched through the related literature, the analysis of historical maps and excavation results, the interview with the concerned people and the case study. This research defines the analysis of the Plan of the Nam-Hae Sin-sa Reconstruction as follows. 1. The Nam-Hae Sin-sa was the institution for religious service operated by national direct management, represents the shrine for public peace and bliss on the Mountain, the Sea, and the River. Especially the Nam-Hae Sin-sa had an important position on the pivot of international trade with China and Japan, and had a role of main shrine with another one in the Mt. Ji-ri San. 2. The name of the Sea shrine was called as Nam-Hae Sin-sa(the South Sea shrine), Dong-Hae Myo(the East Sea shrine), Seo-Hae Dan(the West Sea shrine). But the name of the South Sea shrine had changed in the early period of Chosun as Nam-Hae Sin-sa to the later Chosun as Nam-Hae Dang through the research of related literature and historical map. Such as the Seo-Hae Dan, it was constructed for the Dan, the flat raised-floor without buildings, and changed to the type of Sa-Dang with addition of buildings. 3. The historical map of Hae Sin-sa informs the types of the roof, the Mat-bae roof was used in the Dong-Hae Myo, but the Pal-jak roof was showed in the Seo-Hae Dan and the Nam-Hae Sin-sa. 4. According to the analysis of Yong-Ch'uck the unit length, Nam-Hae Sin-sa was reconstructed in the period of Koryo on large scale, but it was restored in the Chosun on middle scale. And the Unit of Yong Ch'uck was changed into Yeong-jo Ch'uck in the period of Chosun. 5. As the results, The Plan of the Nam-Hae Sin-sa Reconstruction designed the new shrine into the 3 Kan front and the 2 Kan side with 3:2 scale. An-ch'o-gong with Yong-du and Yong Mi the ornaments represents head and tail of dragon, the Un-gong and the ornament of Pa-ryun-dae-gong in the building, and the Ch'ung-ryang of the Yong-du show the image of the institution for religious service for the god of the sea who look like dragon. The inner gate building and the main entrance were designed as same plan and scale as Hyang-gyo, the Korean Traditional School and Shrine of Confucianism, on the basis of results of excavation. Raise the 3-tall gate of the main entrance with harmony of the scale and the shape, because the side of gate building has the Mat-bae roof. 6. This research shows that Plan of the Nam-Hae Sin-sa Reconstruction is composed into shrine space and reservation space from the main entrance to inner gate and shrine like Jung-ak Dan in the Mt. Gye-ryong San, and it also informs the well in the west side of Sin-sa is an important factor of the plan of shrine architecture.