• 제목/요약/키워드: Initial Cost

검색결과 1,562건 처리시간 0.027초

환수율 및 접종밀도에 따른 초소형 rotifer, Synchaeta kitina의 대량배양 (Mass Culture of Ultra-small Rotifer, Synchaeta kitina at the Exchange Rate of Culture Water and Initial Inoculation Density)

  • 오정수;박진철;박흠기
    • 한국수산과학회지
    • /
    • 제42권4호
    • /
    • pp.354-359
    • /
    • 2009
  • The productivity of ultra-small rotifer, Synchaeta kitina was investigated at the exchange rate of culture water (10, 20, 30, 40 and 50%) and initial inoculation densities (250, 600 and 900 inds. per mL) in semi-continuous culture. Also, the possibility of mass culture was investigated in a 100 L culture tank. Tetraselmis suecica was used as the feed for S. kitina in all experiments. The production of S. kitina increased with an increase in exchange rate of culture water. The highest production ($82.0{\times}10^5$ inds.) was achieved at 40% exchange rate of culture water. The production of S. kitina increased with an increase of initial inoculation density during the first week and the highest total production ($17.4{\times}10^6$ inds.) was achieved at 900 inds. per mL of initial inoculation density. However, on the second week, all treatments were not significantly different in total production (P>0.05). During the two weeks, total production of S. kitina at 900 inds. per mL of initial inoculation density was higher than at 600 inds. of initial inoculation density, but there was no significant difference (P>0.05). In the 100 L culture tank, density of S. kitina was kept from 516 to 890 inds. per mL and S. kitina was daily harvested $15.5{\times}10^6$ to $26.7{\times}10^6$ during the experimental period. The production cost for 100 million rotifers in semi-continuous culture was 63,656 won. The results from this study indicate that the optimal exchange rate of culture water and initial inoculation density for the semi-continuous culture of ultra-small rotifer, S. kitina are 40% and 600 inds. per mL, respectively.

우유생산비 조사 및 계산상의 문제점과 합리화방안 연구 (Problems in methodology for estimating cost of milk production and its improvement)

  • 천룡;서성원;박종수
    • 농업과학연구
    • /
    • 제39권2호
    • /
    • pp.227-242
    • /
    • 2012
  • Accurate estimation of milk production cost is very important for dairy farmers in establishing strategies for business management (e.g. planning a program for milk production, deciding the size of business and investment, determining the milk price for sale). Since the estimated cost of milk production is used as an important index to determine the basal price of milk in Korea, there has been much interest and debate on the method used to estimate milk production cost among the stakeholder. This study was thus carried out to identify problems in the current methodology for estimating cost of milk production, and to find a better way to improve it. We propose several alternatives and better ways to improve the current method for estimating cost of milk production. Estimation of the income and cost per head should be based on the number of cattle converted to grown cows. Cost estimation per liter of milk should be made for both whole milk and 3.4% milk fat corrected milk. The value of purchased cows and raised replacement heifers should be the same as their market value. The productive life span of cows should be less 4 years, and the terminal or salvage value of cows needs to be 30 to 40% less than her initial value. When calculating depreciation of cows over the productive life span, however, the salvage value should be 0 or 1 Korean won. On calculating labor costs, the farm labor wage corresponding to the average wage of nonfarm industrial workers should be assumed. Beside of these, better estimation procedures for other items are also given. The proposed methods from this study should improve the accuracy of estimation of milk production cost and help to achieve consensus among the stakeholder.

생산량과 공정분산이 변하는 공정평균이동 문제의 마모한계 결정 (Determination of the Wear Limit to the Process Mean Shift Problem with Varying Product and Process Variance)

  • 이도경
    • 산업경영시스템학회지
    • /
    • 제43권3호
    • /
    • pp.95-100
    • /
    • 2020
  • Machines and facilities are physically or chemically degenerated by continuous usage. One of the results of this degeneration is the process mean shift. The representative type of the degeneration is wear of tool or machine. According to the increasing wear level, non-conforming products cost and quality loss cost are increasing simultaneously. Therefore a periodic preventive resetting the process is necessary. The total cost consists of three items: adjustment cost (or replacement cost), non-conforming cost due to product out of upper or lower limit specification, and quality loss cost due to difference from the process target value and the product characteristic value among the conforming products. In this case, the problem of determining the adjustment period or wear limit that minimizes the total cost is called the 'process mean shift' problem. It is assumed that both specifications are set and the wear level can be observed directly. In this study, we propose a new model integrating the quality loss cost, process variance, and production volume, which has been conducted in different fields in previous studies. In particular, for the change in production volume according to the increasing in wear level, we propose a generalized production quantity function g(w). This function can be applied to most processes and we fitted the g(w) to the model. The objective equation of this model is the total cost per unit wear, and the determining variables are the wear limit and initial process setting position that minimize the objective equation.

실적공사비 분석을 통한 유통시설물의 적정공사비 추정에 관한 연구 (A Study on the Presumption of Proper Construction Cost of Distribution Facilities by Analyzing Actual Construction Cost)

  • 고성석;김현식;이현철
    • 한국건설관리학회논문집
    • /
    • 제9권3호
    • /
    • pp.108-117
    • /
    • 2008
  • 최근 유통시설물 공사의 증가와 함께 발주처와 시공사간의 불확실성 요인에 따른 공사비 계약 및 정산방식에 있어서 분쟁의 소지가 많이 제기되고 있다. 이에 초기 착공 시 공사비에 대한 명확한 검증기준이 마련되어야 하며, 저가 공사수주로 인한 공기지연, 품질저하 등을 미연에 예방할 수 있는 적정공사비 추정이 가능해야 할 것이다. 이와 같은 관점에서 본 연구에서는 대형 유통시설물의 공사비 예측을 통한 초기 투자비 분석 및 공사 진행시 발주자와 시공사간의 원만한 공사 진행을 위해 국내 유통시설물 관련 15개 현장의 실적공사비를 조사 분석하여 공법 및 공간, 면적별 적정공사비를 산출하였으며, 이를 근거로 신규 프로젝트 진행시 초기 기획 설계단계에서 부터 타당성 조사를 위한 예측공사비 분석을 통하여 유통시설물 사업의 적정성 여부를 결정하는 수단으로 활용될 수 있는 자료를 제시하고자 하였다.

OPTIMAL DESIGN FOR CAPACITY EXPANSION OF EXISTING WATER SUPPLY SYSTEM

  • Ahn, Tae-Jin;Lyu, Heui-Jeong;Park, Jun-Eung;Yoon, Yong-Nam
    • Water Engineering Research
    • /
    • 제1권1호
    • /
    • pp.63-74
    • /
    • 2000
  • This paper presents a two- phase search scheme for optimal pipe expansion of expansion of existing water distribution systems. In pipe network problems, link flows affect the total cost of the system because the link flows are not uniquely determined for various pipe diameters. The two-phase search scheme based on stochastic optimization scheme is suggested to determine the optimal link flows which make the optimal design of existing pipe network. A sample pipe network is employed to test the proposed method. Once the best tree network is obtained, the link flows are perturbed to find a near global optimum over the whole feasible region. It should be noted that in the perturbation stage the loop flows obtained form the sample existing network are employed as the initial loop flows of the proposed method. It has been also found that the relationship of cost-hydraulic gradient for pipe expansion of existing network affects the total cost of the sample network. The results show that the proposed method can yield a lower cost design than the conventional design method and that the proposed method can be efficiently used to design the pipe expansion of existing water distribution systems.

  • PDF

강상판교의 생애주기비용 최적설계 (Optimum Life-cycle Cost Design of Orthotropic Steel Deck Bridges)

  • 조효남;민대홍;이광민
    • 한국강구조학회 논문집
    • /
    • 제13권4호
    • /
    • pp.337-349
    • /
    • 2001
  • 교량은 계속적으로 변하는 하중 환경에 의해서 다른 구조물에 비해 비교적 빨리 노후화 되기 때문에 초기비용 이외에도 교량의 유지관리, 교통의 원활한 소통 또는 적체 등에 따른 비용, 교량의 손상에 따른 보수보강 및 교량의 해체 재건설 등 추가적인 비용의 영향이 크므로 공용간 생애주기 비용(LCC)을 설계단계에서부터 체계적이고 합리적으로 고려되어야 한다. 이에 본 연구에서는 강상판교의 설계에 있어서 주형의 휨 전단, 사용성, 피로에 대한 보강기대비용 등을 포함하는 LCC에 근거한 비용함수모형을 이용하여 이를 최적설계에 적용하고 기존의 설계방법과 비교 분석하였다. 적용예제의 결과에 나타난 바와 같이 LCC를 고려한 강상판 교량의 최적설계는 더욱 합리적이고, 경제적이며, 안전한 설계를 유동할 수 있으리라 판단된다.

  • PDF

구조 수명간 지진위험도를 고려한 연속 PSC교의 LCC 최적 내진설계 (Optimum Life-Cycle Cost-Effective Seismic Design for Continuous PSC Bridges Considering Lifetime Expected Seismic Risks)

  • 조효남;이광민;박경훈;김평석
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2004년도 춘계 학술발표회 제16권1호
    • /
    • pp.720-723
    • /
    • 2004
  • This study is intended to propose a systematic approach for determining optimum Life-Cycle Cost (LCC)-effective seismic design for continuous PSC bridges considering lifetime expected seismic risks. In the paper, a set of cost function for LCC analysis of bridges is proposed. The total LCC functions consist of initial cost and direct/indirect damage costs considering repair/replacement costs, human losses and property damage costs, road user costs, and indirect socio-economic losses. The damage costs are expressed in terms of Park-Ang median global damage indices (Park and Ang, 1985) and lifetime damage probabilities. The proposed approach is applied to model bridges of both moderate seismicity regions like Korea and high seismicity regions like Japan. Since, in case of bridges, a number of parameters may have an influence on optimal target reliability, various sensitivity analyses are performed in this study. It may be expected that the proposed approach can be effectively utilized for the development of cost-effective performance criteria for design and upgrading of various types of bridges as well as continuous PC bridges.

  • PDF

운영유지비용을 고려한 신뢰도 할당 모형의 선정 (A Selection Methodology for Reliability Allocation Models to Minimize the Operating Cost)

  • 박종화;김기태;전건욱
    • 한국국방경영분석학회지
    • /
    • 제35권3호
    • /
    • pp.31-45
    • /
    • 2009
  • 시스템의 성능과 안전성을 보장하기 위해서는 개발 초기부터 신뢰도에 대한 연구가 이루어져야 한다. 시스템의 목표 신뢰도를 수립하고, 이를 달성하기 위하여 하부시스템 및 부분품에 신뢰도를 할당해야 한다. 시스템의 획득 및 개발에 있어서 성능이 우수하고 비용이 저렴하더라도 고장이 빈번하게 발생한다면 원활한 임무 수행에 많은 영향을 미치고, 막대한 운영유지비용이 소요될 것이다. 본 연구에서는 신뢰도 할당 모형과 운영 유지비용과의 관계를 알아보기 위하여 기존의 알려진 신뢰도 할당 모형들을 검토 및 평가하였다. 신뢰도 할당모형의 평가는 차기 개발 함정용 디젤 엔진을 대상으로 하였으며, 다양한 신뢰도 할당 모형에 목표 신뢰도를 고려하여 신뢰도를 할당하고, 현재 운영하는 함정용 디젤 엔진의 자료를 바탕으로 시뮬레이션을 수행하여 운영유지비용을 최소화하는 신뢰도 할당 모형을 선정하였다.

생애주기비용을 이용한 잔교식 안벽의 신뢰도지수 최적화 (Reliability Index Optimization for Pier Type Quay Walls Using Life Cycle Cost)

  • 김동현;윤길림
    • 한국해안·해양공학회논문집
    • /
    • 제23권6호
    • /
    • pp.422-428
    • /
    • 2011
  • 잔교식 안벽의 생애주기비용(Life Cycle Cost, LCC)을 이용하여 신뢰도지수의 최적값을 구하였다. 응답면 기법을 이용한 신뢰성해석을 통해 횡잔교와 돌제식 잔교의 파괴확률을 산정하였다. 파괴확률은 잔교의 파괴 시 복구비용을 산출하는데 활용하였으며 초기공사비와 유지관리비를 모두 고려한 LCC를 최소화시킬 수 있는 신뢰도지수를 찾았다. 지진하중과 접안하중에 대한 다양한 조건에서의 최적 신뢰도지수를 구하였고 이를 통해 신뢰성설계에 사용할 수 있는 목표신뢰도지수를 제안하였다.

도서용 태양광/내연기관 발전시스템 경제성 비교 분석 (Economic Analysis on PV/Diesel Power System for Remote Islands' Electrification)

  • 이만근;정명웅;진영택
    • 태양에너지
    • /
    • 제18권3호
    • /
    • pp.147-151
    • /
    • 1998
  • Several PV-diesel hybrid systems were built in isolated islands in Korea, where they are far from the inland to be supplied the electric power to a utility level from it. A lot of efforts has been concentrated to find a cost-effective electric supply system with higher reliability and minimum maintenance when compared with a diesel generator. For this purpose, an autonomous PV-diesel hybrid system with multi-channel remote monitoring system was investigated to supply electric power under minimum operating cost and maintenance in a small isolated island. In this report, the economic analysis was performed for comparison with photovoltaic system and diesel generator by computer simulation. And it was proven that a PV system is more cost-effective than an internal combustion engine for the remote island with less than 150 households. Especially, in the case of islands with less than 50 households, the initial construction cost of the PV system is comparable to and its operating cost is about 70% less than the diesel generator.

  • PDF