The 6th International Conference on Construction Engineering and Project Management
/
pp.268-270
/
2015
Overseas countries' government and facility management industries make efforts to ensure precise and fluent data from building information modeling (BIM). In facility management, a large amount of data and information are necessary to continue the process activities. Facility condition assessment, which is performed to make budget plan for the maintenance and operation requires the related facilities' documentation and information. However, it depends on the owner and the user of the facility to provide accurate and complete information to consultant. The problems as follows: (1) owner and user should provide documents and information, and (2) the consultant cannot verify the provided information. To solve these problems, we suggest a methodology to produce the information for FCA through BIM. First, all of the essential documentation and assessment elements are listed. Next, the documents and elements are separated out, whether they are able to be extracted from BIM or not. Then, the list indicates only the data that is linked with BIM. The suggestion is expected to provide the required information through the connection to BIM with accuracy and completeness and to present another BIM application use for facility management.
In recent farming communities, the international open-economy tendency has been accelerated, and they are in the situation where they cannot but compete against international producers and markets. As a means to survive in this competitive era, a systematic agricultural information system is required to be established. Accordingly, in recent Korean agricultural communities, it's been regarded as an important alternative to provide and construct agricultural facility and to build an information system to maintain and manage them. However, in reality, the agricultural facility has not been constructed systematically enough, and the information system for the users of the agricultural facility has not been sufficient enough. Therefore, this research aims at analyzing the demands of users which might help establish the agricultural facility information system, and at providing information by suggesting what information the users of an agricultural facility information system want. Once the agricultural facility users are provided with some necessary information, the construction process will be more systematized, a structural safety will be secured by the construction by a professional enterprise, and the cost burden has to bear for users who can be effectively decreased by actively reacting to the natural disasters on the facility.
The introduction of BIM technology is expanding not only in the field of design and construction, but also in the maintenance and use stage. In particular, researchers are looking to build a smart facility management system that integrates advanced IT technology and BIM. This study proposes the parts to be used and added to the BIM information, focusing on information generated and exchanged in the application case that is an issue during the current facility maintenance work by introducing the smart facility management technology and its use cases. The effectiveness of this proposal is compared with the scenario in which BIM-based facility safety management is applied and the current business scenario. In conclusion, the requirements for smart facility management are analyzed, and linkable parts between facility management tasks and BIM data that should be reflected in the facility management system are presented. In the maintenance phase, through the use case scenario, the facility management phase is subdivided according to the characteristics and contents of the work. In addition, information about the facilities required for each task is specified. Furthermore, it is examined whether BIM data and IT information can be linked with existing facility management systems. It is a process and guideline that can be provided to practitioners who want to introduce BIM and smart technology to facility management. It can define the required data items and levels according to the required information step by step based on the maintenance case.
The 6th International Conference on Construction Engineering and Project Management
/
pp.280-283
/
2015
Many construction projects have used the building information modeling (BIM) extensively considering data interoperability throughout the projects' lifecycles. However, the current approach, which is to collect the data required to support facility maintenance system (FMS) has a significant shortcoming in that there are various individual pieces of information to represent the performance of the facility and the condition of each of the elements of the facility. Since a heterogeneous external database could be used to manage a construction project, all of the conditions related to the building cannot be included in an integrated BIM-based building model for data exchange. In this paper, we proposed an ontology-based facility maintenance information model to integrate multiple, related pieces of information on the construction project using industry foundation classesbased (IFC-based) BIM data. The proposed process will enable the engineers who are responsible for facility management to use a BIM-based model directly in the FMS-based work process without having to do additional data input. The proposed process can help ensure that the management of FMS information is more accurate and reliable.
From the perspective of the client, the value of information for use in facility management is very low at the point of use. This is because the facility owner, who is a non-professional, cannot accurately request necessary information from the perspective of long-term facility life cycle management. The purpose of this study is to define the information necessary for facility management and to analyze the project operation method to procur this information to the client using BIM. To this end, this study analyzed the role of client and contractor, project delivery process, standards, and submissions in the BIM-based procurement area through USACE Air Force Hospital project case analysis. As a result of the analysis, if the client, who is the subject of facility operation, defines in advance the type and input method of necessary information in the operation stage, the client can receive the BIM optimized for operation from the contractor. The results of this study can be used to establish standards for receiving information necessary for establishment of procurement process and facility management of public institutions considering BIM introduction.
The purpose of this study is to identify the relationship between psychological wellbeing of social welfare facility workers and their organizational commitment. The subjects of this study were 230 social welfare facility workers in OO city, Gyeongsangbuk-do, Korea. Analysis was conducted using the SPSS program, including frequency analysis, reliability analysis and correlation analysis, and regression analysis on the causal relationship between variables. The results of the study showed that the psychological wellbeing of social welfare facility workers had a meaningful effect on their emotional commitment, continuous commitment and normative commitment. These results confirmed that the higher the psychological wellbeing of social welfare facility workers, the higher the sub-factors of organizational commitment, such as emotional, continuous, normative commitment, resulting in positive effects on the achievement of goals and values that are pursued by the welfare facilities. This study aims to become foundational data for the improvement of working conditions to improve psychological wellbeing of social welfare facility workers to increase organizational commitment.
Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.
In university of Korea, the computerization of facility management is lower level than other management areas such as educational matters, administration, library, computing center, teaching assistance, and teaching methodology. So we need urgently the blueprint for an information-oriented and integrated facility management system. In this research, It is presented and implemented an FMS(Facility Management System) for efficient management of the ground and underground facilities on a campus. This studies is computerized the drawings, protocols, and ledgers. It is used a GIS(Geographic Information System) to get the geographical information of facilities. The data more efficiently could be search and update on this system. The decision making process understanding the present facility condition, and analyzing the condition of location could be performed easily by the GUI(Graphic User Interface) of the system.
The 1th International Conference on Construction Engineering and Project Management
/
pp.836-840
/
2005
This research investigates the feasibility of Web technology as a means of delivering facility information for better support facility operation and maintenance. Our research proposes a Web-based feedback system as a pragmatic solution to the limitations of current FM (Facility Management) processes. In practice work orders and records are often misplaced resulting in lower efficiency and customer satisfaction. This may be overcome by a system that states information digitally and provides a Web-based interface. The interface could allow customers to report facility problems, trace their work order in progress, view schedules for maintenance and provide feedback for service online. The benefit for a FM department is that it can receive feedback on performance which would improve the quality of service and build a record of practical experiences.
도면과 대장정보를 데이터베이스화하여 구축한 기존의 시설물 관리시스템은 시설물의 2차원 또는 3차원 관리가 가능하도록 하였으나 현장에서 발생하는 다양한 정보를 실시간으로 수집할 수 없고 이를 종합적으로 운용하지 못하였다. 이러한 단점을 보완하기 위하여 유비쿼터스 기반의 시설물 관리시스템의 구축이 필요하다. 본 연구에서는 기존의 지형지물 전자식별자를 개량하여 시설물 관리에 적용 가능하도록 관리기관과 일련번호 부여방법이 개량된 UFID 체계를 제안하였다. 또한 제안한 UFID를 이용하여 유비쿼터스 기반의 시설물 관리를 위한 프로세스를 정립하였다. 본 연구의 적용성은 가로수를 대상으로 한 사례연구를 통하여 평가되었으며, 이는 유비쿼터스 기반의 다양한 시설물 관리에 적용될 수 있을 것으로 사료된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.