Journal of Information Technology Applications and Management
/
제11권2호
/
pp.167-178
/
2004
Different from traditional development methodologies like waterfall model, the CBD (component based development) methodology relies on a building block approach in the design and development of information system. The audit procedure and checklist for the traditional IS development methodology are required to be modified to be suitable for CBD. This research reviewed IS audit guidelines for the existing development process and analyzed multiple projects that employed the by component based development process. For the purpose of this study, we chose a governmental project and a next-generation IS project of a financial agency as sample cases. By comparing existing IS audit checklists and items actually reviewed in audit projects, this study identified appropriate check items for the CBD-centric audit program. New items were proposed as additional items such as project control in management phase, usage case and conceptual model establishment, component evaluation and design, in implementation phase, and so forth. The result of the research provides new guidelines for the audit CBD projects for the purposed of increased efficiency and qualify of application development projects.
Downtown traffic culture of the car focus of our country have developed. But, it was been interested in railroad to saturation of situation, environmental problem. Also, it is getting interest which is international by departure point of network connecting from Europe to Northeast Asia. Private capital project of railroad is activated but Construction companies payability is real that is worsen day by day. Therefore, Construction companies is destroying element enterprise's inefficiency and the waste, be interested in Project Management Information System as part of information. I wish to approach in efficiency of railway construction by presenting professional construction company's Project Management Information System.
Recently, bottom-up information systems (BUIS), developed according to the requirements of individual user departments, have become popular. However, effective management of BUIS projects is not enough, with many organizations having experienced integration challenges with such individual projects. BUIS projects are relatively small and limited in scope, as opposed to the large, complex systems developed through traditional top-down information system development projects. Due to these differences in characteristics, the control modes as well as the aspects to improve development performance in each type of project are also different. Therefore, it is difficult to apply the results of prior research on control in system development projects to improve BUIS project performance. The purpose of this study is to derive a new theory of control to improve BUIS project performance. The results contribute to the improvement of firm performance through effective control of BUIS projects in modern enterprises.
The 3th International Conference on Construction Engineering and Project Management
/
pp.717-724
/
2009
Most recent programs in and out of the country are related to urban renewal projects. Contemporary project management information systems have been developed was to manage single or multiple projects focusing on their construction phase, and those have limitations to apply to large-scale complicated mega projects. So, this study explain the core concept of decision support modules for iPMIS (Intelligent Program Management Information System) and its major functions to support project owner and participants by introducing ontology in the web environment. This study confined the scope of research to the planning phase of urban environment improvement projects. Ontological logic structure and relation about planning works is essential parts and three functions to implement decision support module are developed.
공공 SW 시장은 국내 시장 특성상 중소 SW 기업에게는 상대적으로 중요한 시장이다. 이에 정부는 공공정보화 시장에서의 중소기업 지원을 위해 공공 SW 사업 수요예보 조사제도를 시행하고 있으나 아직 중소기업이나, 발주기관 입장에서의 편의성은 부족한 실정이다. 또한 SW 사업의 발주 이후의 집행정보를 관리하는 SW 사업정보저장소 제도가 별도로 운영되고 있으나, 이는 중소 SW 기업보다는 발주기관을 위한 제도에 머무르고 있다. 본 연구는 두 제도가 가지고 있는 문제점과 개선 가능성에 대한 분석을 통해 사용자 편의성을 높이고 SW 사업정보의 활용도를 확대할 수 있는 시스템의 설계 방안을 제안하고자 한다. 이를 위하여 먼저 발주기관, 정책당국, 공공 SW 사업자, 조사기관의 4대 이해당사자를 식별하였고, 요구사항들을 분석하였다. SW 사업정보 관리체계 분석을 위해 2단계 수요예보 주기, SW 프로젝트 관리 주기, 그리고 SW 시스템 수명주기의 분석 체계를 제안하고, 이들 사이에서 SW 사업정보를 식별, 연계할 수 있도록 단일식별자(UID) 개념도 제안하였다. 그 결과 SW 사업 수요예보 및 사업진행 단계에 따른 사업정보의 통합적 관리체계를 설명할 수 있는 '시스템 수명주기 기반의 SW 사업정보 관리체계 참조모델'을 도출하였으며, 이를 실행할 수 있도록 이해당사자들이 사이의 개선된 프로세스를 설계하였다. 이를 통하여 공공 SW 사업정보의 통합적인 관리가 가능하게 될 것으로 기대된다.
건설 PMIS(Project Management Information System, 이하 PMIS)는 과거의 업무보조 수단에서 벗어나 프로젝트의 성공을 위한 필수적인 도구 중의 하나로 인식되고 있다. 하지만 정보관리시스템 구축 목표와 전략 부재로 인해 투자비 규모 설정은 물론 파급영향에 대한 기대감 상실로 정보화 노력이 일시적 현상에 그치고 있다. 이는 정보화 투자 대비 효과에 대한 검증이 부족하여 정보화를 추진하는데 있어 동기 부여가 되지 못하기 때문이다. 따라서 본 연구에서는 PMIS의 품질요인과 프로젝트 관리의 성공 간에 영향관계를 파악하는 것이 목적이다. 건설 프로젝트 관리의 성공요인, 정보시스템 품질평가 및 성공모델 도출에 대한 기존 문헌고찰을 통해 프로젝트관리의 성공과 PMIS의 품질을 측정하기 위한 평가항목을 구성하였으며 실제 PMIS의 사용자인 시공사, 사업관리자(Construction Manager, 이하 CM)를 대상으로 설문조사를 실시하였다. 이렇게 수집된 자료들로 통계프로그램인 SPSS 12.0을 활용하여 다중회귀분석을 통해 건설 사업에서 PMIS의 품질요인과 프로젝트 관리의 성공간의 영향관계를 분석하고 시사점을 도출하였다.
Objectives: Several domestic search systems for research projects providing capabilities of searching and managing the research information based on metadata have been completed, although they cannot search projects for specific domains such as the Oriental Medicine field. Therefore, in this paper we propose an effective method for collecting and refining information of research projects in the oriental medicine field. We also design and implement a search management system based on the collected information. Methods: We chose three search elements and defined the collecting process for research projects. The collected information was refined to enhance the quality of results. Then, the search management system was implemented by Adobe Flex. Results: We were able to collect 1,688 research projects in the oriental medicine field. We also implemented the search management system, which provides the functionalities of search and management such as input, update, delete, spreadsheet import/export of R&D projects, user management and access control. Conclusions: The collected information and the search management system will be used in a project analysis system which will be constructed in the future. The project analysis system could help to analyze trends in oriental medicine research as well as construct a technical roadmap.
프로젝트의 성공적 수행을 위해 단계별 체계적 관리를 제공하는 사업관리정보시스템은 필수적이다. 그러나, 기존 관리시스템은 사업을 통한 공모과제들의 접수, 선정, 수행관리 등에만 초점이 맞춰져 있었으며, 사업 자체에 대한 관리는 전무한 실정이다. 본 논문에서는 공모과제의 관리뿐만 아니라, 시행사업에 대한 총괄관리가 가능한 하향식 전주기적 사업관리의 시스템화를 통해 연구성과를 체계적으로 관리함으로써 사업관리 업무의 효율성을 제고할 수 있는 방안에 대해 기술한다. 또한, 사용자의 특성에 맞는 차별화된 정보를 제공할 수 있는 사업관리정보시스템 구축을 통해 고객 맞춤형 서비스를 제공하는 환경에 대해 기술한다. 이러한 사업관리정보시스템을 활용함으로써 표준화된 체계적 사업관리를 가능하게 하고, 시스템간 연계를 통한 즉각적인 후속 업무 진행으로 업무 효율성을 향상시킬 수 있음을 적용 사례를 통해 확인한다.
GS건설은 1996년 한국 건설업계 최초로 EVM 기법을 도입하여 공정과 손익을 연계하여 관리하는 PMS(Project Management System)을 구축하였다. 2006년 PMS에 Lean Construction 이론과 JIT(Just In Time) 개념을 접목하여 낭비요소를 최소화하는 최적의 업무 공정을 정립, TPMS(Total Project Management System)를 완성하여 건설현장에서의 생산성 극대화가 가능해 졌다. TPMS의 맞춤형 포탈정보는 발주처, 감리자, 협력사 등의 프로젝트 관계자들에게 맞춤식 정보를 제공하고 있다. 다양한 관계자들에게 필요한 정보들을 맞춤식으로 제공해 줌으로서 사용의 편리성 및 정보의 이용성을 극대화하였으며, 함께 하는 업무 환경을 제공하여 빠른 의사결정 및 원활한 정보공유를 이룰 수 있다. 본 논문은 TPMS의 동남권 현장 적용을 통해 건설현장에서의 PMIS의 성공적인 모델을 제시하고자 한다.
본 논문에서 식스 시그마 프로젝트의 관리를 위한 자동 결재 시스템의 설계를 제안하고자 한다. 제안하는 설계 시스템은 식스 시그마가 추구하는 혁신 및 개선 활동을 활성화하기 위해 전사적인(enterprise-wide) 개선 과제를 등록하고, 선정하고, 과제의 진도를 관리하고, 유효성을 검증하고, 그 이력을 관리하기 위한 목적을 가지고 있다. 각각의 개선 과제들은 데이터베이스에 저장되어, 정보 활용성을 높인다. 제안된 시스템은 국내의 모 기업에서 현재 효과적으로 사용되고 있으며, 이를 통해 체계적으로 식스 시그마 프로젝트의 진도를 관리하고 효율적인 업무 처리를 실현하는 효과를 기대할 수 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.