• Title/Summary/Keyword: Influent

Search Result 843, Processing Time 0.024 seconds

Evaluation of Biological Organic and Nutrient Removal Performance in Intermittent MBR Systems by Computer Simulation (컴퓨터 시뮬레이션을 이용한 간헐폭기 MBR시스템에서의 유기물 및 영양염류 처리 성능 평가)

  • Yoo, Hosik;Rhee, Seung-Whee
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.21 no.3
    • /
    • pp.82-92
    • /
    • 2013
  • The Intermittent Aeration MBR systems have the advantage of controlling reaction time by changing aeration period and are one of economic BNR systems since these processes do not require MLSS recirculation that demands capital and operation costs. In this study, two intermittent aeration MBR systems were studied by computer simulation: an intermittent aeration MBR system that had both 1hr/1hr and 4hr/4hr aeration/unaeration periods at intermittent reactor and NEW INTERMITTENT-process that was an energy saving process and certified as a new process by Korean government. Since DO concentration reached only at 0.23mg/L at intermittent reactor when it was aerated, the Intermittent aeration MBR system having 1hr/1hr aeration/unaeration period showed simultaneous nitrification/denitrification and had the highest nitrogen and phosphorus removal efficiencies that were 57% and 55%, respectively. Since this study was based on the constant influent flow and characteristics, more studies are needed to define the operational characteristics of intermittent aeration MBR systems under dynamic influent conditions.

Biological Treatment of Phenolic Industrial Wastewater by a Mixed Culture Immobilized on Ceramic Beads (세라믹담체를 이용한 페놀계 산업폐수의 생물학적 처리)

  • Oh, Hee-Mock;Ku, Young-Hwan;Ahn, Kuk-Hyun;Jang, Kam-Yong;Kho, Yung-Hee;Kwon, Gi-Seok;Yoon, Byung-Dae
    • Microbiology and Biotechnology Letters
    • /
    • v.23 no.6
    • /
    • pp.755-762
    • /
    • 1995
  • A phenolic resin industrial wastewater containing about 41,000 mg/l of phenol and 2,800 mg/l of formaldehyde was biologically treated by a mixed culture GE2 immobilized on ceramic beads. This study was carried out with three experimental groups : Control-only added the sludge of papermill wastewater ; GE2 treatment-added GE2 to Control ; Ceramic treatment-applied ceramic carrier to GE2 treatment. When the original wastewater was diluted 80 times with aerated tap-water, influent COD$_{Mn}$ WaS 1,140 mg/l and that of the effluent was in the range of 22-35 mg/l, which was not much different among the experimental groups. However, at 20-times dilution, influent COD$_{Mn}$ was 4,800 mg/l and the effluent COD$_{Mn}$ of Control, GE2 treatment and Ceramic treatment was 179, 128 and 94 mg/l, respectively. COD$_{Mn}$, removal efficiency by Ceramic treatment was the highest, at 98.0%. At this time, the effluent phenol concentration of Control, GE2 treatment and Ceramic treatment was 10.71, 7.93 and 5.60, respectively. As the dilution times decreased, the removal efficiency of COD$_{Mn}$ and phenol did not change much, but COD$_{Mn}$ and phenol concentration of the effluent increased. Consequently, it is likely that the phenolic industrial wastewater containing phenol and formaldehyde can be biologically treated using a GE2 and ceramic carrier and that at 40-times dilution, the effluent completely meets the effluent standards for industrial wastewater treatment plant.

  • PDF

Design Model of Constructed Wetlands for Water Quality Management of Non-point Source Pollution in Rural Watersheds (농촌유역의 비점원 오염 수질관리를 위한 인공습지 설계모형)

  • 최인욱;권순국
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.44 no.5
    • /
    • pp.96-105
    • /
    • 2002
  • As an useful water purification system for non-point source pollution in rural watersheds, interests in constructed wetlands are growing at home and abroad. It is well known that constructed wetlands are easily installed, no special managemental needs, and more flexible at fluctuating influent loads. They have a capacity for purification against nutrient materials such as phosphorus and nitrogen causing eutrophication of lentic water bodies. The Constructed Wetland Design Model (CWDM), developed through this study is consisted mainly of Database System, Runoff-discharge Prediction Submodel, Water Quality Prediction Submodel, and Area Assessment Submodel. The Database System includes data of watershed, discharge, water quality, pollution source, and design factors for the constructed wetland. It supplies data when predicting water quality and calculating the required areas of constructed wetlands. For the assessment of design flow, the GWLF (Generalized Watershed Loading Function) is used, and for water quality prediction in streams estimating influent pollutant load, Water Quality Prediction Submodel, that is a submodel of DSS-WQMRA model developed by previous works is amended. The calculation of the required areas of constructed wetlands is achieved using effluent target concentrations and area calculation equations that developed from the monitoring results in the United States. The CWDM is applied to Bokha watershed to appraise its application by assessing design flow and predicting water quality. Its application is performed through two calculations: one is to achieve each target effluent concentrations of BOD, SS, T-N and T-P, the other is to achieve overall target effluent concentrations. To prove the validity of the model, a comparison of unit removal rates between the calculated one from this study and the monitoring result from existing wetlands in Korea, Japan and United States was made. As a result, the CWDM could be very useful design tool for the constructed wetland in rural watersheds and for the non-point source pollution management.

Optimal Distance between Positive and Negative Electrode-Plates Coated with Activated Carbon in Dust Removal Chamber (활성탄전극을 이용한 분진제거에서 전극의 적정 간격에 관한 연구)

  • Kim, Kwang Soo;Park, Hyun Chul;Jun, Tae Hwan;Lee, Ju Haeng;Nam, Sang Chul
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.11
    • /
    • pp.821-826
    • /
    • 2013
  • The purposes of this research are to study on optimal distance between positive and negative electrodes in dust removal chamber. The experiments were performed with electrode-plate gab arranging in order of 3 cm, 2 cm, 1 cm in series while varying influent flow-rate. From the experimental results of dust removal the optimal influent linear velocity was 6 cm/sec and the total mass of attached dust on the surface of electrode-plate was increased as electrode-plate gab is closer. But in case of electrode-plate gab being very close about 1 cm or so, the attached dust on the surface of electrode-plate was shown releasing from electrode-plate due to dust electric-charge changing (reverse ionization). Evantually. optimal distance between positive and negative electrode-plates was about 2 cm and also optimal dust loading rate was about $24mg/min{\cdot}m^2$.

The Removal Characteristics of THM Formation Potential According to the Changes of Bromide Concentration of Influent Water in BAC Process (생물활성탄 공정에서 계절별 유입수의 $Br^-$ 농도변화에 따른 THM 생성능 구성종별 제거 특성)

  • Son, Hee-Jong;Yoo, Pyung-Jong
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.31 no.5
    • /
    • pp.378-381
    • /
    • 2009
  • The purpose of this research is the evaluation of removal efficiency of THMFP in BAC. The changes of four types of THMFP and total THMFP were examined in the influent and effluent of BAC filter from March to December in 2008. It turned out that the amounts of brominated THMFP were obviously higher in winter and autumn compared to the spring and summer, which also resulted in an increase of the total-THMFP levels during winter and autumn. In addition, long-term running of BAC filter shows the good removal function of chloroform formation potential, but not brominated THMFP; with further bromination, this function was declined, as it shows the formation of bromoform in BAC filter during October and December. These results were caused by changing of the proportion of $Br^-$/DOC.

Optimization of membrane fouling process for mustard tuber wastewater treatment in an anoxic-oxic biofilm-membrane bioreactor

  • Chai, Hongxiang;Li, Liang;Wei, Yinghua;Zhou, Jian;Kang, Wei;Shao, Zhiyu;He, Qiang
    • Environmental Engineering Research
    • /
    • v.21 no.2
    • /
    • pp.196-202
    • /
    • 2016
  • Membrane bioreactor (MBR) technology has previously been used by water industry to treat high salinity wastewater. In this study, an anoxic-oxic biofilm-membrane bioreactor (AOB-MBR) system has been developed to treat mustard tuber wastewater of 10% salinity (calculated as NaCl). To figure out the effects of operating conditions of the AOB-MBR on membrane fouling rate ($K_V$), response surface methodology was used to evaluate the interaction effect of the three key operational parameters, namely time interval for pump (t), aeration intensity ($U_{Gr}$) and transmembrane pressure (TMP). The optimal condition for lowest membrane fouling rate ($K_V$) was obtained: time interval was 4.0 min, aeration intensity was $14.6 m^3/(m^2{\cdot}h)$ and transmembrane pressure was 19.0 kPa. And under this condition, the treatment efficiency with different influent loads, i.e. 1.0, 1.9 and $3.3kgCODm^{-3}d^{-1}$ was researched. When the reactor influent load was less than $1.9kgCODm^{-3}d^{-1}$, the effluent could meet the third discharge standard of "Integrated Wastewater Discharge Standard". This study suggests that the model fitted by response surface methodology can predict accurately membrane fouling rate within the specified design space. And it is feasible to apply the AOB-MBR in the pickled mustard tuber factory, achieving satisfying effluent quality.

Application of Dynamic $\bar{x}$-R Control Chart for Advanced Phase Isolation Ditch (APID) Process (APID공정 내 공정진단을 위한 dynamic $\bar{x}$-R 관리도의 적용)

  • An, Sang-Woo;Kwak, Sung-Keun;Jung, Young-Wook;Chung, Mu-Keun;Park, Jae-Woo
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.5
    • /
    • pp.704-712
    • /
    • 2009
  • Advanced Phase Isolation Ditch (APID) process was studied to develop economic retrofitting technology, for the plants where retrofitting of common activated sludge process is required. In this study, to evaluate and monitor the effluent water quality ($BOD_5$, SS, T-N, and T-P) and operating conditions (Influent, SVI, SRT, and HRT) as process capable and stable parameters for treating municipal wastewater, a demonstration plant was installed and operated in the existing sewage treatment plant of P city. During this study, the average effluent $BOD_5$, SS, T-N, and T-P concentrations were 7.7, 5.6, 10.8, and 1.6 mg/L. Trend analysis of influent $BOD_5$, SS, T-N, and T-P in APID process were illustrated that APID process need for more strong APID process management on the winter session, such as developing new intermediated aeration mode, operating methods, and managements strategy. At the application of control chart, the signal of uncommon effects at APID process was determined much higher existing control chart tntr conventional control chart in this study. These results indicate that conventional control chart has been collected and determined cleary signal at only stable situation. Therefore, newly developed APID process of dynamic control chart can be one of the useful tool for monitoring and management process.

Application of chemically enhanced backwash coping with algal inflow in desalination pretreatment using ceramic membrane (세라믹 분리막을 이용한 해수담수화 전처리 공정에서 조류 유입에 대한 유지세정 적용)

  • Kang, Joon-Seok;Park, Seo-Gyeong;Lee, Jeong-Jun;Kim, Han-Seung
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.32 no.2
    • /
    • pp.97-106
    • /
    • 2018
  • In this study, the effect of chemically enhanced backwash(CEB) coping with algal(Heterosigma Akashiwo) inflow was evaluated in the seawater desalination pretreatment process using ceramic membrane. In order to confirm the possibility of long-term filtration operation, the recovery rate of transmembrane pressure(TMP) due to the CEB using NaOCl was examined. When the membrane flow rate was 83.3 LMH, the TMP was maintained within 200 kPa for 84 hours in seawater influent. As the algal counts of 30,000 cell/mL were injected into the influent of seawater, however, the TMP rapidly increased and exceed maximum value. Membrane fouling caused by the algae was very poorly recovered by usual physical backwash. The CEB was performed for 30 min(3 min circulation / 27 min immersion) with 300 mg/L of NaOCl. As a result of the CEB application, it was possible to maintain a stable operating of filtration during 10 days and the average recovery rate of TMP by the CEB was 98.1%. It has been confirmed that the CEB using NaOCl is very effective in removal of membrane fouling by algae, resulted in stable membrane filtration for the long-term operation.

A Study on the Behaviour of Organics and Nitrogen Using Upflow Anaerobic Reactor When Acid Fermenter is Added (상향류식 혐기성반응조와 산발효조의 병합처리시 유기물질과 질소거동에 관한 연구)

  • Oh, Dae-Min;Lee, Young-Shin
    • Journal of Environmental Science International
    • /
    • v.18 no.3
    • /
    • pp.325-331
    • /
    • 2009
  • This study was aimed to behaviour of organics and nitrogen on the upflow anaerobic reactor when a acid fermenter is added. Up flow anaerobic reactor (UAR) reaction will result which operates, COD removal efficiencies of reactor with nitrate loading rate 0.11, 0.66g/L/d were over 77%, but one with 1.0g/L/d was 73.5%. Especially, on NLR 0.11g/L/d, COD removal was 77% and nitrate removal efficiency was 93% simultaneously. The other side upflow anaerobic reactor and acid fermenter (UAR+AF) reaction will result witch operates, COD removal efficiencies of reactor with nitrate loading rate 0.11, 0.66g/L/d were over 85%, but one with 1.0g/L/d was 80%. Especially, on NLR 0.11g/L/d, COD removal was 85% and nitrate removal efficiency was 98% simultaneously. Also, without in reaction condition increase of influent nitrate concentration resulted in the linear decrease of nitrate removal efficiency and nitrate removal efficiency at influent nitrate-nitrogen 800mg/L was 50%. Alkalinity was increased theoretically by denitrification at low nitrate-N concentration, however, it was not increased theoretically at high nitrate-No 40% nitrate-N of UAR was denitrified until 70% height of reactor and 90% nitrate-N of UAR+AF was denitrified until 30% height of reactor Upflow anaerobic reactor was to occur accumulate acid, which TVA/Alkalinity is 0.3$\sim$0.47. Increase of NLR resulted increase of effluent alkalinity and TVA production

Applicability of the SBR Process Using Aerobic Granular Sludge (AGS) in Municipal Wastewater Treatment (호기성 그래뉼 슬러지를 이용한 연속 회분식 공정의 도시하수처리에 대한 적용)

  • Yae, Jae-Bin;Ryu, Jae-Hoon;Hong, Seong-Wan;Kim, Hyun-Gu;Ahn, Dae-Hee
    • Journal of Environmental Science International
    • /
    • v.27 no.4
    • /
    • pp.233-240
    • /
    • 2018
  • The purpose of this study was to confirm the applicability of aerobic granular sludge (AGS) in the advanced sewage treatment process. Simulated influent was used in the operation of a laboratory scale reactor. The operation time of one cycle was 4 h and the reactor was operated for six cycles per day. The volume exchange ratio was 50%. The influent was injected in divisions of 25% to increase the removal efficiency of nitrogen in every cycle. As a result, the removal efficiencies of $COD_{Cr}$ and TN in this reactor were 98.2% and 76.7% respectively. During the operation period, the AGS/MLVSS concentration ratio increased from 70.0% to 86.7%, and the average $SVI_{30}$ was 67 mL/g. The SNR and SDNR were 0.073-0.161 kg $NH_4{^+}$-N/kg MLVSS/day and 0.071-0.196 kg $NO_3{^-}$-N/kg MLVSS/day respectively. These values were higher or similar to those reported in other studies. The operation time of the process using AGS is shorter than that of the conventional activated sludge process. Hence, this process can replace the activated sludge process.