• Title/Summary/Keyword: Industrial Crane

Search Result 149, Processing Time 0.026 seconds

A Study on design of Optimal Controller for container Crane (컨테이너크레인 제어를 위한 최적제어기 설계에 관한 연구)

  • 이영진;조현철;이진우;이권순
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1998.10a
    • /
    • pp.397-402
    • /
    • 1998
  • PID controller has been used very widely in the industrial applications. But it is difficult tune the PID gains. In this paper, we present a design of optimal 2-DOF PID controller for control of container crane which has to control swing motion and trolley position. For tuning of the 2-DOF PID control gains, we used hybrid evolution program(EP). During operate the crane system in yard, the goal is transporting the load to a goal position as quick as possible without rope oscillation. The crane is generally operated by an expert operator, but recently an automatic control system with high accuracy and rapid transportation is required. However, we developed an optimal controller which has to control the crane system with disturbance.

  • PDF

Development of Multimotor Control Strategy with Network (네트워크를 이용한 다수 전동기 제어 기법의개발)

  • 최명규
    • Proceedings of the KIPE Conference
    • /
    • 2000.07a
    • /
    • pp.115-118
    • /
    • 2000
  • This paper describes the method to control the multimotor drive system with network. The LonWorks network which is a leading industrial control network is applied to the yard crane position control system driven by three motors. The host computer is able to control and monitor three motor drive systems in a yard crane through network. The performance of proposed method is verified on experiments with simulator of yard crane.

  • PDF

Crane Scheduling Considering Tenant Service Time in a Rail-Road Transshipment Yard : Case of the Uiwang ICD (철도-육상트럭 환적지에서의 입주사 작업시간을 고려한 크레인 적하작업 스케줄링 : 의왕ICD 사례)

  • Kim, Kwang-Tae;Kim, Hyo-Jeong;Son, Dong-Hoon;Jang, Jin-Myeong;Kim, Hwa-Joong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.4
    • /
    • pp.238-247
    • /
    • 2018
  • This paper considers the problem of scheduling loading and unloading operations of a crane in a railway terminal motivated from rail-road container transshipment operations at Uiwang Inland Container Depot (ICD). Unlike previous studies only considering the total handling time of containers, this paper considers a bi-criteria objective of minimizing the weighted sum of the total handling time and tenant service time. The tenant service time is an important criterion in terms of terminal tenants who are private logistics companies in charge of moving containers from/to the terminal using their trucks. In the rail-road container shipment yard, the tenant service time of a tenant can be defined by a time difference between beginning and finishing loading and unloading operations of a crane. Thus, finding a set of sequences and time of the crane operations becomes a crucial decision issue in the problem. The problem is formulated as a nonlinear program which is improved by linearizing a nonlinear constraint in the model. This paper develops a genetic algorithm to solve the problem and performs a case study on the Uiwang ICD terminal. Computational experiment results show that the genetic algorithm shows better performance than commercial optimization solvers. Operational implications in terms of tenants are drawn through sensitivity analyses.

Analysis of Crane Accidents by Using a Man-Machine System Model (인간-기계 시스템 모델에 의한 크레인 사망재해 분석)

  • Park, Jae-Hee;Park, Tae-Joo;Lim, Hyun-Kyo;Seo, Eun-Hong
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.2 s.80
    • /
    • pp.59-66
    • /
    • 2007
  • As the need of handling heavy materials increases, various cranes are used in industries. However, the effectiveness of crane also entails industrial accidents such as falling, constriction etc. In fact, the number of fatal accidents caused by crane is still high in Korea. To find out the causes of the accidents in terms of human error, we developed a man-machine system model that consists of two axes; human information processing and crane life cycle. In the human information processing dimension, we simplified it as five functions; sensing and perception, decision making and memory, response etc. In the crane life cycle dimension, we divided it into nine phases; design, production, operation etc. For the 152 fatal accident records during 1999-2006 years, we classified them into 45 cells made by two axes. Then we identified the preceding causes of the classified crane accident based on performance shaping factors. As the results of statistical analysis, the overall trend of crane fatal accidents was described. For the cause analysis, wrong decision making in work plan phase shows the highest frequency. Next, the poor information input in crane operation followed in accident frequency. In ergonomics view, the problems of interface design in displays and controls made 11.8% of fatal accidents. Following the analysis, several ergonomic design guidelines to prevent crane accidents were suggested.

Multi-load Automated Storage/Retrieval Systems (복수운반형 자동창고)

  • Rim, Suk-Chui;Kim, Yong-Jin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.2
    • /
    • pp.239-254
    • /
    • 1995
  • Automated Storage/Retrieval (AS/R) systems have been used mostly in manufacturing or distribution industry in order to store or retrieve palletized items automatically. Since the items ore heavy or bulky, only one pallet at a time is moved by the stacker crane In this study, however, we introduce the "multi -load" AS/R system in which the items to be stored are data storage devices of equal size such as video tape or compact disc. Since the items are small and light multiple items can be stored and retrieved in each trip by using a magazine and a robot arm mounted on the crane Given the magazine capacity, and the locations of retrieval items and empty cells in the rack, the throughput of the multi-load AS/R system will depend on the selection of storage locations and the sequence of visits. We propose four heuristic algorithms for the multi-command. Computer simulation is used to evaluate the four algorithms in terms of throughput and number of back tracking of the crane.

  • PDF

Basic research, according to the inspection of crane equipment (크레인 설비의 검사에 따른 기초연구)

  • An, Tae-Keon;Shim, Kyu-Hyung;Rie, Dong-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.169-175
    • /
    • 2012
  • Self-Inspection is being used in the workplace hazardous, dangerous machinery and equipment to build capacity for the voluntary safety risks due to use of machinery and prevention of industrial accidents that inspect facilities for safety issues, is to check. However, December 31, 2008 as part of Article 36 of the Occupational Safety and Health Act (safety inspection), the financial vanish as the self-test, Safety inspection program has been changed., In each individual workplace that creates its own standards and regulations to use the existing inspection system is in some cases. This study is located in the southeast industrial complex as a risk reducer manufacturer, machine-based target zones in S Corp owns most of the crane based on the results of the tests is to analyze the problem. Then check the results - to bring its measures and information you need to know for sure is to propose.

Analysis on the Structural Safety of the Tower Crane under Load (하중을 받는 타워크레인의 구조 안전성 해석)

  • Cho, Jae-Ung;Kim, Sei-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.10
    • /
    • pp.3641-3646
    • /
    • 2010
  • In this study, the deformation analysis is done at tower crane by applying the load at the end of jib and the moment at mast. The greatest stain and stress are happened at the end of wire supporting jib. The great deformation takes place at the end of jib applied by stress and there is no deformation at the lower part of mast. As the life becomes smallest at the upper part of mast, this part becomes weakest. The safety design and durability can be improved by applying the result of structural safety analysis at tower crane.

A study on Cause Analyses of Fatal injuries by the Mobile Cranes (이동식 크레인 사고사망재해 심층분석 연구)

  • Shin, Woon-chul;Yeo, Hyun-Wook;Kwon, Jun-hyuck;Yi, Kwan-Hyung
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.1
    • /
    • pp.9-15
    • /
    • 2016
  • In this study, the current regulations to be adequate in industrial site have to be renew in order to prevent the fatal injuries by mobile cranes. Fatal injury analyses were conducted with several accident cases by the mobile cranes. For each accident, the causes of the injuries were examined and proper safety measures were proposed. This study proposed a revision of the standard guideline as an accident prevention measures through in-depth analysis of fatal accidents. First, fatality rate per 10,000 persons by the mobiles cranes was 0.57 in 2011. Second, the in-depth analysis of the mobile crane accidents showed that the main factors of the accidents were the overturn of mobile crane, the fracture of connection part between mobile crane boom and rope, the breaking of rope and the misunderstanding over the signal between a mobile crane driver and workers around a mobile crane. Third, the order of high defection of connecting parts was bucket bolt, bracket and extension parts. Fourth, since there were several cases of overturn of mobile crane by itself in the in-depth analysis of the mobile crane, the over slop-proof device was proposed as the main alternative in this study. Fifth, the revision of standards of safety factor that shall be more than 10, of connecting parts of mobile crane was proposed.

Expressions for Expectations and Variances of Cycle Times for Yard Cranes by Considering Dependencies among Time Elements

  • Lee, Byung-Kwon;Kim, Kap-Hwan;Yun, Won-Young
    • Industrial Engineering and Management Systems
    • /
    • v.10 no.4
    • /
    • pp.255-263
    • /
    • 2011
  • During the design process of a terminal, the handling capacity of a container yard needs to be evaluated in advance. This study suggests formulas for estimating the expectations and the variances of cycle times for various types of operations of a yard crane. Statistical analysis is used to estimate the expectations and variances. The main focus of this study is to show the impact of interdependencies among handling time elements on the expectation and variance of the cycle times; these interdependencies have not been considered in previous studies. Numerical experiments are done for evaluating the difference in the variance of cycle times and the waiting of trucks between the cases with and without the consideration of interdependencies.