• Title/Summary/Keyword: Induced Draft Fan

Search Result 11, Processing Time 0.024 seconds

Study on Vibration Characteristics after Applying Variable Speed Control to Constant Speed Fans used in a Power Plant (발전소 통풍계통의 가변속 적용 후 진동특성에 관한 연구)

  • Cho, C.W.;Song, O.S.;Yang, K.H.;Kim, G.Y.;Cho, S.T.;Moon, H.D.
    • Journal of Power System Engineering
    • /
    • v.13 no.6
    • /
    • pp.88-94
    • /
    • 2009
  • In this paper, vibration characteristics after applying variable speed control to fans with a rated speed used in a power plant are studied by performing experiments and analyzing finite element models. Then the campbell diagram is presented to verify the reason of the abnormal vibration measured from fan structure during variable operation of Forced Draft Fan & Induced Draft Fan. According to results, it is found that amplitude of acceleration increases abruptly when a 2X harmonic component meets the natural frequency of fan rotor. Therefore it is very important thing that investigate exactly dynamic characteristics for the rotor at variable speed zone before applying variable speed control to a rotor with a rated speed.

  • PDF

Adjustment of the Excess Air Ratio for Stabilizing the Draft System in a Large Capacity Coal Fired Power Plant (대형 석탄화력 발전소에서 통풍계통 안정화를 위한 과잉공기비 조정)

  • Park, Kun Woo;Yoo, Ho-Seon
    • Plant Journal
    • /
    • v.14 no.2
    • /
    • pp.39-44
    • /
    • 2018
  • In this study, I analyzed the effects on stabilizing the draft system, boiler efficiency when changing excess air ratio under 870 MW load limit operation condition in a large capacity coal fired power plant and decided optimum excess air ratio. It is positively necessary to choose adequate excess air ratio for stabilizing draft system because air pre-heater pressure drop and induced draft fan first stall margin are changing when adjusting excess air ratio. This study therefore, measured air pre-heater pressure drop, induced draft fan first stall margin, boiler efficiency, loss and has chosen adequate excess air ratio adjusting excess air ratio from 1.153 to 1.127. So it is recommended that the operation point needs to be changed to 1.127 that is not only to decrease air pre-heater pressure drop and to stabilize draft system and to secure stall margin but also to maintain boiler efficiency to equivalent level.

  • PDF

Study on Optimum Design Condition for Variable Speed Control of Rated Speed Fans used in a Power Plant (발전소 통풍계통의 가변속 운전을 위한 최적 설계조건에 관한 연구)

  • Cho, C.W.;Yang, K.H.;Jung, N.K.;Kim, B.J.
    • Journal of Power System Engineering
    • /
    • v.14 no.5
    • /
    • pp.30-35
    • /
    • 2010
  • Recently, the large capacity draft fans in power plants had been changed to variable speed type to educe the power consumption. But the fan experienced the unexpected vibration at specific speed regions. In this study, the high vibration frequency of the fan was confirmed and the natural frequency of the rotor were measured and analyzed by FEM programs. It was analyzed that the vibration was caused by the resonance at the frequency, 30.7Hz. So, the rotor vibration characteristic was changed by adjusting the distance between the shaft bearings. It was conformed the high vibration was disappeared over the all operation speeds.

Computational Fluid Dynamic Analysis for Improving the Efficiency of Desulfurization System for the Wet Flue Gas (습식 배연탈황 시스템의 효율 향상을 위한 전산해석)

  • Hwang, Woo-Hyeon;Lee, Kyung-Ok
    • Journal of the Korea Society of Computer and Information
    • /
    • v.19 no.2
    • /
    • pp.161-171
    • /
    • 2014
  • In this paper the flow dynamics of the flue gas equipment in the desulfurization system was numerically analyzed by simulating the problems for the turbulent and combustion flow from Induced Draft Fan(I.D.Fan) outlet to Booster Up Fan(B.U.Fan) inlet using the commercial CFD software of CFD-ACE+ in CFDRC company for Computational Fluid Dynamic Analysis. The guide vane of this section was examined for the minimum pressure loss and the uniform flow dynamic to B.U.Fan with the proper velocity from I.D,Fan exit to B,U,Fan inlet section at the boiler both the maximum continuous rating and the design base. The guide vanes at I,D.Fan outlet and B.U.Fan inlet were removed and modified by numerical simulation of the CFD analysis. The flue gas at the system had the less pressure loss and the uniform flow dynamics of the flow velocity and flow line by comparing with the old design equipment.

The Strategy Design of Control Logic for Ultra Super-Critical Power Plant Boiler (초초임계압 발전소 보일러 제어전략 설계)

  • Park, Doo-Yong;Kim, Byung-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2008.04a
    • /
    • pp.223-224
    • /
    • 2008
  • 초초임계압 화력발전 제어계통 설계와 관련하여 보일러 제어시스템의 기본 요건인 제어전략을 구현하기 위해 현재 표준화력 500MW 제어시스템과 제어로직을 기반으로 1000MW급에서 필요로 하는 새로운 구조의 제어에 요구되는 제어전략에 대해 각종 제어 운전 모드의 구성과 각 운전 모드에서의 제어전략을 개발하고 있다. 최신제어시스템에서 중요하게 취급되는 자동 플랜트 제어(Automatic Plant Control, APE)의 각종 제어전략 구성에 중점을 두고 있으며 Unit Master Control, Boiler Master Control, Turbine blaster Control, Throttle Pressure Control, Fuel/Air Master Control, Forced Draft Fan Control, Induced Draft Fan Control, Primary Air Fan, Feed Water Master Control, Super Heater/Reheater Steam Temp Control 등의 제어전략을 논하고, 실제 프로세스 응단특성 파악을 위해 국내 신규발전소를 방문하여 수집한 프로세스 응답시험 결과와 특성을 분석하고 USC에 적용하기위한 보일러 제어전략에 대해 논하고자 한다.

  • PDF

A Study on Air and Gas System of Coal Fired Power Plant (석탄화력발전소의 공기 및 가스시스템 모델에 관한 연구)

  • Jung, Hwan-Joo;Kim, Tae-Hyun;Ryoo, Young-Jae;Chang, Young-Hak;Moon, Chae-Joo
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.283-285
    • /
    • 2002
  • Boiler combustion systems are large, non-linear systems with numerous interactions between its component parts. In the analysis of such complex systems. dynamic simulation is recognized as a powerful method of keeping track of the myriad of interactions. This paper shows and discusses the developed analysis model, such as the forced draft fan the primary air fan, the furnace and burner system, pulverizer, air preheater and induced draft fan, etc. in accordance with BMCR condition of boiler using the Modular Modeling System(MMS) software.

  • PDF

Development of Analysis Model for Combustion System of Coal Fired Power Plant (석탄화력발전소 연소계통의 해석을 위한 모델개발)

  • Jung, Hwan-Joo;Park, Yong-Sub;Kim, Seong-Hwan;Chang, Young-Hak;Moon, Chae-Joo
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.392-394
    • /
    • 2001
  • Coal power plants are large, non-linear systems with numerous interactions between its component parts. In the analysis of such complex systems, dynamic simulation is recognized as a powerful method of keeping track of the myriad of interactions. This paper shows and discusses the developed analysis model, such as the forced draft fan the primary air fan, the furnace and burner system, air preheater and induced draft fan, etc. in accordance with BMCR condition of boiler using the Modular Modeling System(MMS) software.

  • PDF

A Study on the Noise Characteristics of Cooling Tower (냉각탑의 방사소음특성에 관한 연구)

  • Park, B.Y.;Kim, I.S.;Lee, S.H.
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.8 no.3
    • /
    • pp.361-374
    • /
    • 1996
  • In general, a cooling tower has two major noise sources, one is the fan and the other is the falling water. The fan noise is produced by passage of its blades through the air and radiates from the fan stack. Noises from the falling water are caused by splashing and dropping of water cascading over the internal filler of the cooling tower and into the basin and radiate from the louvered face. In this paper, the noise measurements and its frequency analysis are carried out for the locations facing the louvered side and near the fan stack referring the related code and standards in order to study the noise characteristics of the induced-draft cooling tower, especially for the buildings. As a result, it is found that for every doubling of distance from the noise source the noise level decreases by 2~4dBA in the near field with reflect surfaces and decreases by about 6dBA also in the far field without reflect surfaces. As a supplement to the noise measurements, a computer program with simple algorithm is developed in order to estimate the noise level at a distance from the cooling tower, so that the user could apply and modify it for the particular boundary conditions easily.

  • PDF

Optimization of the Design of Large Ducts with the Space Constraint in 500MW Power Plant (500MW 발전소에서 협소 공간 내 대형 덕트 설계의 최적화)

  • Hwang, Woo-Hyeon;Lee, Kyung-Ok;Cho, Yong-Ki
    • Journal of Environmental Science International
    • /
    • v.18 no.7
    • /
    • pp.755-765
    • /
    • 2009
  • Some sections of the exhaust system to determine the shape of the duct is to suffer the difficulties by space constraints to install new equipment of the environment post-treatment for existing operation of the power plants. In this paper the large duct in flue gas desulfurization equipments of the 500MW coal-fired power plant on the current operation is numerically analyzed from induced draft fan exit to booster up fan inlet section which is in the narrow space of the exhaust system with four times bending and is connected to emergency duct to bypass the exhaust gas on the emergency operation. The procedure and method using computational fluid dynamics are proposed to maintain the stability of the guide vane with the uniform flow and a minimum pressure loss of exhaust gas in the case of normal and emergency operation between the direction of the flow of exhaust gas duct at different.

The Development of Boiler Furnace Pressure Control Algorithm and Distributed Control System for Coal-Fired Power Plant (석탄화력발전소 보일러 노내압력 제어알고리즘과 분산제어시스템의 개발)

  • Lim, Gun-Pyo;Hur, Kwang-Bum;Park, Doo-Yong;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.62 no.3
    • /
    • pp.117-126
    • /
    • 2013
  • This paper is written for the development and application of boiler furnace pressure control algorithm and distributed control system of coal-fired power plant by the steps of design, coding, simulation test, site installation and site commissioning test. The control algorithms were designed in the shape of cascade control for two parts of furnace pressure control and induced draft fan pitch blade by standard function blocks. This control algorithms were coded to the control programs of distributed control systems. The simulator for coal-fired power plant was used in the test step and automatic control, sequence control and emergency stop tests were performed successfully like the tests of the actual power plant. The reliability was obtained enough to be installed at the actual power plant and all of distributed control systems had been installed at power plant and all signals were connected mutually. Tests for reliability and safety of plant operation were completed successfully and power plant is being operated commercially. It is expected that the project result will contribute to the safe operation of domestic new and retrofit power plants, the self-reliance of coal-fired power plant control technique and overseas business for power plant.