The modular multilevel converter (MMC) has become a promising topology for high-voltage direct current (HVDC) transmission systems. To control a MMC system properly, the ac-side current, circulating current and submodule (SM) capacitor voltage are taken into consideration. This paper proposes a low-computation indirect model predictive control (IMPC) strategy that takes advantages of the conventional MPC and has no weighting factors. The cost function and duty cycle are introduced to minimize the tracking error of the ac-side current and to eliminate the circulating current. An optimized merge sort (OMS) algorithm is applied to keep the SM capacitor voltages balanced. The proposed IMPC strategy effectively reduces the controller complexity and computational burden. In this paper, a discrete-time mathematical model of a MMC system is developed and the duty ratio of switching state is designed. In addition, a simulation of an eleven-level MMC system based on MATLAB/Simulink and a five-level experimental setup are built to evaluate the feasibility and performance of the proposed low-computation IMPC strategy.
Chun, June Sang;Har, Alix;Lim, Hyun-Pil;Lim, Hoi-Jeong
The Journal of Advanced Prosthodontics
/
v.8
no.1
/
pp.53-61
/
2016
PURPOSE. This study conducted an analysis of cost-effectiveness of the implant and conventional fixed dental prosthesis (CFDP) from a single treatment perspective. MATERIALS AND METHODS. The Markov model for cost-effectiveness analysis of the implant and CFDP was carried out over maximum 50 years. The probabilistic sensitivity analysis was performed by the 10,000 Monte-Carlo simulations, and cost-effectiveness acceptability curves (CEAC) were also presented. The results from meta-analysis studies were used to determine the survival rates and complication rates of the implant and CFDP. Data regarding the cost of each treatment method were collected from University Dental Hospital and Statistics Korea for 2013. Using the results of the patient satisfaction survey study, quality-adjusted prosthesis year (QAPY) of the implant and CFDP strategy was evaluated with annual discount rate. RESULTS. When only the direct cost was considered, implants were more cost-effective when the willingness to pay (WTP) was more than 10,000 won at $10^{th}$ year after the treatment, and more cost-effective regardless of the WTP from $20^{th}$ year after the prosthodontic treatment. When the indirect cost was added to the direct cost, implants were more cost-effective only when the WTP was more than 75,000 won at the $10^{th}$ year after the prosthodontic treatment, more than 35,000 won at the $20^{th}$ year after prosthodontic treatment. CONCLUSION. The CFDP was more cost-effective unless the WTP was more than 75,000 won at the $10^{th}$ year after prosthodontic treatment. But the cost-effectivenss tendency changed from CFDP to implant as time passed.
The purpose of this study is to analyze the cost-effectiveness of four medications for treating and preventing osteoporosis -HRT therapy(conjugated equine estrogen 0.625mg for 25 days and medroxyprogesterone acetate 5mg for 01112 days), Alendronate(10mg and 5mg), Active Vitamin D(Calcitriol), and Calcium. Total costs include the direct medical cost -examination fee, consultation fee, prescription fee, fee for preparing medications, and the price of pharmaceuticals- and the indirect cost of patients such as traffic expenses and time cost. In addition, the costs of monitoring in adverse reactions are added. The effects of four medications are expressed as BMD(Bone Mineral Density) percent change measured by DEXA(Dual Energy X-ray Absorptiometry) in lumbar spine(L2-L4) and femoral neck site. A mixed model based on meta analysis provides the estimates of effectiveness, which are then appled to the hypothetical cohort consisting of postmenopausal women at the age of 50-59. HRT therapy is the most cost-effective medication at 172,433.64 won (lumbar spine site) and 546,328.28 won (femoral neck site) per BMD percent change for osteoporosis. Alendronate 10mg is more cost-effective than Alendronate 5mg as 345,971.23 won and 378,441.63 won per lumbar BMD percent change at 0.991g/$cm^2$, respectively. Alendronate 10mg is more cost-effective than Alendronate 5mg as 1,329,257.89 won and 1,467,291.23 won per femoral neck BMD percent change at 0.834g/$cm^2$, respectively.
In the growth of the government's investment in national R&D project and the abuse of research expense, an effective control and management mechanism is strongly demanded. However, an excessive regulation might hinder the R&D performance, which also endangers the underlying objective of R&D policy. Especially, an excessive regulation on the R&D expenditure may damage the SMEs (Small and Medium sized Enterprises) where securing an adequate level of R&D funding is vital. This study investigates the R&D funding and R&D performance of SMEs participating in the national R&D project by using fixed effect panel model. As a result, this paper reveals the effectiveness of 'Government R&D subsidy'. However, that of 'private R&D fund' is not supported strongly. Also, this paper empirically demonstrates the efficiency of both 'Government R&D subsidy' and 'Private R&D fund' as the R&D costs are spent discretionarily (as the degree of 'Indirect Cost Ratio' increases). Especially, the effectiveness of 'Private R&D fund' can be moderated by 'Indirect Cost Ratio'. On the basis of the conclusions, this paper draws an implication that can increase R&D performance of SMEs through the interactions of manifold administrative values (i.e. effectiveness, efficiency and responsibility).
This research introduces the Financial Effect Measurement (FEM) models which measures both the improvement and the innovation performance of Quality Control Circle (QCC) and activities of Six Sigma. Concepts and principle of Comprehensive Income Statement (CIS), Balanced Scorecard (BSC), Time-Driven Activity Based-Costing (TDABC) and Total Productive Maintenance (TPM) are applied in order to develop the 4 FEM models presented in this paper. First of all, FEM using CIS depicts the improvement effects of production capacity and yield using relationships between demand and supply, and line balancing efficiency between bottleneck process and non-bottleneck processes. Secondly, cause-and-effect relation of Key Performance Indicator (KPI) is used to present Critical Success Factor (CSF) effects for QC Story 15 steps of QCC and DMAIC (Define, Measure, Analyze, Improve, and Control) of Six Sigma. The next is FEM model for service management innovation activities that uses TDABC to calculate the time-driven effect for improving the indirect activities according to the cost object. Lastly, FEM model for TPM activities presents the interpretation of improvement effect model of TPM Capital Expenditure (CAPEX) and Operating Expenditure (OPEX) maintenance using profit, cash and Economic Added Value (EVA) as metrics of enterprise values. To better understand and further investigate FEMs, recent cases on National Quality Circle Contest are used to evaluate new financial effect measurement developed in this paper.
International conference on construction engineering and project management
/
2007.03a
/
pp.69-78
/
2007
In real world, the project managers handle conflicting goals that govern the use of resources within the stipulated time and budget with required quality and safety. These conflicting goals are required to be optimized simultaneously by the project managers in the framework of fuzzy aspiration levels. The fuzzy linear programming model proposed herein helps project managers to minimize total project costs, completion time, and crashing costs considering indirect costs, contractual penalty costs etc by practically charging them in terms of direct cost of the project. A case study of bituminous pavement under construction is considered to demonstrate the feasibility of applying the proposed model for optimization of project parameters. Consequently, the proposed model yields an efficient compromise solution and the decision maker's overall degree of satisfaction with multiple fuzzy goal values. Additionally, the proposed model provides a systematic decision-making framework, enabling decision maker to interactively modify the fuzzy data and model parameters until a satisfactory solution is obtained. The significant characteristics that differentiate the proposed model with other models include, flexible decision-making process, multiple objective functions, and wide-ranging decision information.
Although the effectiveness of an express train's service is measured in "Total System Time or Cost" units, many cases had used indirect method what based on the distintion by number of passengers in a station or experiential knowledgements. These methods are not guarantee itself as an optimal strategy. Focusing "Total System Time or Cost" directly, this paper investigates the express train service's stop scheduling based on each OD-volume and trip time which mainly affect system time and cost. To do this, we built an IP model which has a binary set presenting express train's stop scheduling as decision variable and suggest a Genetic Algorithm (GA) to find heuristic optimal solution.
International conference on construction engineering and project management
/
2007.03a
/
pp.642-652
/
2007
Many contracting firms and project managers in the construction industry have started to utilize multi objective optimization methods to handle multiple conflicting goals for completing the project within the stipulated time and budget with required quality and safety. These optimization methods have increased the pressure on decision makers to search for an optimal resources utilization plan that optimizes simultaneously the total project cost, completion time, and crashing cost by considering indirect cost, contractual penalty cost etc., practically charging them in terms of direct cost of the project which is fuzzy in nature. This paper presents a multiple fuzzy goal programming model (MFGP) that supports decision makers in performing the challenging task. The model incorporates the fuzziness which stems from the imprecise aspiration levels attained by the decision maker to these objectives that are quantified through fuzzy linear membership function. The membership values of these objectives are then maximized which forms the fuzzy decision. The problem is solved using LINGO 8 optimization solver and the best compromise solution is identified. Comparison between solutions of MFGP, fuzzy multi objective linear programming (FMOLP) and multiple goal programming (MGP) are also presented. Additionally, an interactive decision making process is developed to enable the decision maker to interact with the system in modifying the fuzzy data and model parameters until a satisfactory solution is obtained. A case study is considered to demonstrate the feasibility of the proposed model for optimization of project network parameters in the construction industry.
Background: The appropriate interval between negative colonoscopy screenings is uncertain, but the numbers of advanced neoplasms 10 years after a negative result are generally low. We aimed to evaluate the cost-effectiveness of colorectal neoplasm screening and management based on repeat screening colonoscopy every 10 years or single colonoscopy, compared with no screening in the general population. Methods and materials: A state-transition Markov model simulated 100,000 individuals aged 50-80 years accepting repeat screening colonoscopy every 10 years or single colonoscopy, offered to every subject. Colorectal adenomas found during colonoscopy were removed by polypectomy, and the subjects were followed with surveillance every three years. For subjects with a normal result, colonoscopy was resumed within ten years in the repeat screening strategy. In single screening strategy, screening process was terminated. Direct costs such as screening tests, cancer treatment and costs of complications were included. Indirect costs were excluded from the model. The incremental cost-effectiveness ratio was used to evaluate the cost-effectiveness of the different screening strategies. Results: Assuming a first-time compliance rate of 90%, repeat screening colonoscopy and single colonoscopy can reduce the incidence of colorectal cancer by 65.8% and 67.2% respectively. The incremental cost-effectiveness ratio for single colonoscopy (49 Renminbi Yuan [RMB]) was much lower than that for repeat screening colonoscopy (474 RMB). Single colonoscopy was a more cost-effective strategy, which was not sensitive to the compliance rate of colonoscopy and the cost of advanced colorectal cancer. Conclusion: Single colonoscopy is suggested to be the more cost-effective strategy for screening and management of colorectal neoplasms and may be recommended in China clinical practice.
The purpose of this case study is to verify the usefulness of three costing models and a minimum profit management model that can support the logistics warehouse companies in the Busan Newport Distri-park. This case study investigated traditional costing, activity-based costing (ABC), and time-driven ABC (TDABC); and suggested that an appropriate minimum profit management model is contribution margin analysis. Accordingly, in order to verify the usefulness of models, this case study surveyed the actual cost management conditions of companies, applied the three costing models to the "K" warehouse company in the Busan Newport Distri-park, and undertook a comparative study of the results. This case study produced two main findings. First, TDABC was verified as the most useful and advanced of the three costing models tested. Second, contribution margin analysis was confirmed to be the most suitable model to manage minimum profits for port warehouse companies in the Busan Newport Distri-park.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.