• Title/Summary/Keyword: Impact on time and cost

Search Result 325, Processing Time 0.027 seconds

Management in the EPC Business for Overseas Power Plant Projects (해외 발전플랜트 EPC 사업의 리스크 분석 및 관리방안)

  • Park, Euiseung;Yoo, Hoseon;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.7 no.3
    • /
    • pp.48-64
    • /
    • 2011
  • In this work, risks in EPC project for overseas power plant projects are analyzed and risk management methods are suggested to reduce cost and to shorten time. 79% of risks occurred in the engineering phase for S project located in South-East Asia. The impact scales of risks on major project objectives which are cost, time, scope, and quality are analyzed as 3.5, 3.8, 2.7, and 3.7, respectively. The level of impact scales is very similar to each other except the impact scale of scope. The risk management methods suggested in this study have to be applied at the appropriate time to manage risks effectively. After that, risks are managed continuously by monitoring.

  • PDF

Impact of Smoothed Replenishment Ordering Policy on the Performance Measures in Supply Chain (스무딩된 주문 정책이 공급사슬의 성과지표에 미치는 영향)

  • Cho, Myeon-Sig
    • Journal of the Korea Society for Simulation
    • /
    • v.20 no.2
    • /
    • pp.19-27
    • /
    • 2011
  • This study investigates impact of smoothed replenishment ordering policy on the performance measures such as lead time, order fulfillment ratio, and inventory cost. We consider a two-echelon supply chain: a single retailer orders using smoothed order up to replenishment policy and a manufacturer produces the retailer's orders on a make to order basis. Simulation result confirms that lead time from the manufacturer can be reduced by smoothed ordering policy as expected. However, smoothing orders may deteriorate the customer order fulfillment ratio and inventory cost in a retailer. We also observe that variance of manufacturing time contributes more than mean of manufacturing time to both order fulfillment ratio and inventory cost. Therefore, variability of upstream manufacturing time should be minimized.

The Optimal Release Time in Cost Model Using PCLS Model

  • Song, Kwang Yoon;Chang, In Hong;Choi, Min Su;Lee, Da Hye
    • Journal of Integrative Natural Science
    • /
    • v.9 no.3
    • /
    • pp.206-214
    • /
    • 2016
  • The basic goal of software development is to produce high quality software at low cost. Therefore, when to stop software testing and release the software product is a significant point in the software development. The software cost model is an effective tool used to help software developers control costs and determine the release time. In this paper, we discuss the cost model to apply all 6 models with consideration of time to remove errors, cost of removing each error and risk cost due to software failure. We show the impact of cost coefficients and parameter values on the expected total cost by changing the values and comparing the optimal release times.

Analysis of Impact on ERP Customization Module Using CSR Data

  • Yoo, Byung-Keun;Kim, Seung-Hee
    • Journal of Information Processing Systems
    • /
    • v.17 no.3
    • /
    • pp.473-488
    • /
    • 2021
  • The enterprise resource planning (ERP) system is a standardized and advanced business process that many companies are implementing now-a-days through customization. However, it affects the efficiency of operations as these customizations are based on uniqueness. In this study, we analyzed the impact of customized modules and processing time on customer service request (CSR), by utilizing the stacked CSR data during the construction and operation of ERP, focusing on small and medium-sized enterprises (SMEs). As a result, a positive correlation was found between unit companies and the length of ERP implementation; ERP modules and the length of ERP implementation; ERP modules and unit companies; and the type of ERP implementation and ERP module. In terms of CSR, a comparison of CSR processing time of CBO (customized business object) module and STD (standard) module revealed that while the five modules did not display statistically significant differences, one module demonstrated a statistically very significant difference. In sum, the analysis indicates that the CBO-type CSR and its processing cost are higher than those of STD-type CSR. These results indicate that companies planning to implement an ERP system should consider the ERP module and their customization ratio and level. It not only gives the theoretical validity that should be considered as an indicator for decision making when ERP is constructed, but also its implications on the impact of processing time suggesting that the maintenance costs and project scheduling of ERP software must also be considered. This study is the first to present the degree of impact on the operation and maintenance of customized modules based on actual data and can provide a theoretical basis for applying SW change ratio in the cost estimation of ERP system maintenance.

Impact of COVID-19 on R&D Cost Stickiness in IT industry

  • Kwak, Ji-Young;Lee, Jung-wha;Jo, Eun Hye
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.2
    • /
    • pp.36-42
    • /
    • 2021
  • This study aims to examine whether there are some differences in the cost stickiness of R&D expenses of IT companies before and after the COVID-19 crisis. Before COVID-19, IT companies did not reduce R&D expenses even if sales decreased, resulting in cost stickiness. As a result, it appears that during the COVID-19, IT companies adjust R&D expenses in proportion to changes in sales. This is interpreted as a reduction in R&D investment, which takes a long time to create results, in case of a decrease in sales due to uncertainty in future management performance due to the COVID-19 pandemic. In other words, during the COVID-19 risk period, IT companies, like other companies, reduced R&D expenses as sales decreased, resulting in reduced cost stickiness. This study differs from existing literature in that it examines the impact of the COVID-19 pandemic on the R&D expenditure behavior of companies in the IT industry.

Influence of Private Tutoring on Middle School Student's Achievement According to the Experience of Gifted Education (사교육과 영재교육 참여경험이 중학생의 수학성취도에 미치는 영향)

  • Park, Sun Heung;Han, Ki-Soon
    • Journal of Gifted/Talented Education
    • /
    • v.23 no.1
    • /
    • pp.49-65
    • /
    • 2013
  • The purpose of this study is to investigate the longitudinal impact of the engagement of private tutoring on student achievement and the influence of the engagement of gifted education on the effect of private tutoring by applying hierarchical linear growth modeling technique on the KELS (Korean Education Longitudinal Study) data. For the analysis, we used KELS data including the score of Mathematics achievement from 2005 to 2007 in order to get useful variables like whether or not to engage private tutoring, weekly time and monthly cost of private tutoring, the experience of gifted education, gender, prior achievement of 6th grade, parents' monthly income, internal motivation and self-efficacy. The sample consisted of 4,435 7th graders from Korean middle schools who were included in the KELS and have the data available to a significant dataset having no missing values include. The result suggest that the private tutoring experience predicted students' high Mathematics achievement and the interaction between grade and private tutoring time and cost has negative impact on the mathematics achievement. In contrast, it was found that the experience of gifted education has negative impact on the growth of mathematics achievement, but positive impact on the effect of private tutoring cost on the mathematics achievement. In other words, the experience of gifted education shows affirmative impact on the effect of private tutoring cost on the mathematics achievement indirectly. On the basis of this results, we discussed deeply the effect of private tutoring on the Mathematics achievement and the influence and its meaning of the experience of gifted education on the effect of private tutoring.

Applying a Life-Cycle Assessment to the Ultra Pure Water Process of Semiconductor Manufacturing

  • Tien, Shiaw-Wen;Chung, Yi-Chan;Tsai, Chih-Hung;Yang, Yung-Kuang;Wu, Min-Chi
    • International Journal of Quality Innovation
    • /
    • v.6 no.3
    • /
    • pp.173-189
    • /
    • 2005
  • A life-cycle assessment (LCA) is based on the attention given to the environmental protection and concerning the possible impact while producing, making, and consuming products. It includes all environmental concerns and the potential impact of a product's life cycle from raw material procurement, manufacturing, usage, and disposal (that is, from cradle to grave). This study assesses the environmental impact of the ultra pure water process of semiconductor manufacturing by a life-cycle assessment in order to point out the heavy environmental impact process for industry when attempting a balanced point between production and environmental protection. The main purpose of this research is studying the development and application of this technology by setting the ultra pure water of semiconductor manufacturing as a target. We evaluate the environmental impact of the Precoat filter process and the Cation/Anion (C/A) filter process of an ultra pure water manufacturing process. The difference is filter material used produces different water quality and waste material, and has a significant, different environmental influence. Finally, we calculate the cost by engineering economics so as to analyze deeply the minimized environmental impact and suitable process that can be accepted by industry. The structure of this study is mainly combined with a life-cycle assessment by implementing analysis software, using SimaPro as a tool. We clearly understand the environmental impact of ultra pure water of semiconductor used and provide a promotion alternative to the heavy environmental impact items by calculating the environmental impact during a life cycle. At the same time, we specify the cost of reducing the environmental impact by a life-cycle cost analysis.

The Impact of Information Lead Time Improvement on the Distributed Supply Chain System (분산형 공급체인에서 단계별 정보지연 개선이 주는 효과)

  • 김철수;최근영
    • The Journal of Information Systems
    • /
    • v.10 no.2
    • /
    • pp.129-150
    • /
    • 2001
  • In this study, we model a decentralized supply chain system which is managed by four types of centers, sequentially located: Retailer, Wholesaler, Distributor, and Factory Each center contributes to enhancing the performance of the supply chain system individually with its own local inventory information. Through experiments which are performed with a programmed simulation (like the MIT beer game), we investigate how the information lead time improvement in each center affects the whole system. And we show that the impact of the lead time improvement in the downstream, like retailers, affects more to the system than the one in the upstream, like factories, in a cost-effective way. Moreover, by using information lead time for each center, we analyze how much the extent of the improvement affects the whole system, especially for the total cost and the order level.

  • PDF

Economic Analysis for Standardization R&D of Urban Rail System (도시철도 표준화 연구개발사업의 경제성 분석)

  • Chung, Choong-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1694-1714
    • /
    • 2007
  • This study is to estimate economic benefits of Standardization R&D of Urban Rail System. Benefit was to be realized through standardization of main areas such as train vehicle, railway, power system, and signal system. To derive and calculate the quantitative benefit, the sources of economic impact was divided into three dimensions -operational cost savings, import substitution, and safety effects. Economic effect of the standardization was categorized based on a modified BSC model. Economic benefits from time and labor savings are converted into cost savings. Import substitution and investment multiplier effect have a positive impact in addition to cost savings. The estimation of the standardization R&D of Urban Rail System was conservatively estimated 370 billion Won. Cost effectiveness of standardized safety system was conservatively translated into economic benefit in this analysis. This study provides a practical guide to economic evaluation of the various railway R&D projects.

  • PDF

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF