• Title/Summary/Keyword: Ice slurry maker

Search Result 3, Processing Time 0.02 seconds

Continuous Ice Slurry Production and Control of Ice Packing Factor in a Pipe for the District Cooling (지역냉방을 위한 아이스슬러리의 연속제조 및 배관내 빙충전율 조절)

  • Kwon, Jae-Sung;Lee, Yoon-Pyo;Lee, Sang-Hoon;Yoo, Ho-Seon;Yoon, Seok-Mann
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.12
    • /
    • pp.825-832
    • /
    • 2008
  • The ice slurry maker which can produce the ice slurry well for the ice particle in-flowing condition was revised. We removed the stagnant region at the top of the ice slurry maker, and IPF 40% could be realized. The IPF controller with 6 mm diameter holes at the bottom was designed. But the IPF controller with only 6 mm diameter holes could not control IPF in a pipe. This is because the ice particles at ice slurry flow exist homogeneously not only at the upper part but also at the bottom part. We changed the hole size of IPF controller surface using fine meshes and then, IPF in a pipe was increased by 70% when the hole size was $80{\mu}m$ and less.

Optimal Scheduling for Dynamic Ice Storage System with Perfectly Predicted Cooling Loads (동적제빙형 빙축열시스템에 대한 최적운전계획)

  • Lee, Kyoung-Ho;Lee, Sang-Ryoul;Choi, Byoung-Youn;Kwon, Seong-Chul
    • Proceedings of the KSME Conference
    • /
    • 2001.06d
    • /
    • pp.286-291
    • /
    • 2001
  • This paper describes an optimal scheduling for ice slurry systems for energy cost saving. The optimization technique applied in the study is the dynamic programming method, for which the state variable is the storage in the ice storage tank and the control variable is the state of chiller's on-off switching. Though the costs during charge period is included in optimization by taking the average cost of ice per hour for slurry making, the time horizon for the simulation is limited building cooling period because accurate charge rate from the ice maker into the ice storage tank cannot be estimated during the charge period. In the operating simulation after optimizing procedure, energy consumption and operating cost for the optimal control are calculated and compared with them for a conventional control with one case of cooling load profile.

  • PDF

Ice slurry transporting and branching characteristics for the district cooling (지역냉방을 위한 아이스슬러리 시스템의 수송 및 분기 특성)

  • Lee, Sang-Hoon;Yoo, Ho-Seon;Lee, Yoon-Pyo;Lee, Chang-Jun;Kwon, Hyeok-Min
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.662-667
    • /
    • 2009
  • The research are performed to check the characteristics of the ice slurry transport system for the district cooling. The system are installed at the 1st floored building which is as large as the $1204\;m^2$ ($86\;m{\times}14\;m$), and the pumping power and branching characteristics are measured by transporting of the ice slurry. The ice slurry transporting pipe is as long as 200 m. For the same cooling load, the higher IPF is, the lower the transporting flow rate and the pumping power are. But when the IPF is higher than 15%, no less decrease of the pumping power does happen. For the branching characteristics, through the branch pipe where the flow resistance is higher, the higher IPF is measured. A little higher IPF is measured at the thermal expansion branch.

  • PDF