• Title/Summary/Keyword: IT methods for management

Search Result 6,931, Processing Time 0.039 seconds

Application Development Plan for Building Construction Courses Applied with Innovation Teaching Methods (혁신 교수법을 적용한 건축시공 학습용 애플리케이션 개발 방안)

  • Kim, Seong-Bin;Jo, Min-Jin;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.121-122
    • /
    • 2020
  • Universities that offer architectural engineering programs in Korea are making efforts to introduce innovation teaching methods to cultivate teamwork, creativity, flexibility of thought and practical skills needed for the Fourth Industrial Revolution. However, there is a lack of specific measures to support them. In this regard, this study investigated a method of application development for building construction courses applied with the innovation teaching methods. It mainly focused on 'improvement directions for existing learning management systems' and 'online learning support plans using the innovation teaching method' as research contents. It is expected that these improvement directions can be applied to the field of education through the development of mobile and web-based applications. In the follow-up research, the development of specific software for field application will be carried out.

  • PDF

Prioritizing quality attributes using I-S Gap analysis (중요도-만족도 격차분석을 이용한 품질 속성의 우선순위 결정)

  • Song, HaeGeun;Lim, Sung Uk
    • Journal of Korean Society for Quality Management
    • /
    • v.43 no.2
    • /
    • pp.127-140
    • /
    • 2015
  • Purpose: To obtain the area for improvement, the Importance-Performance analysis(IPA) uses relatively simple questions, that is, satisfaction and importance at attribute level. However, no attempt has been made to consider the gap between own company's performance and those of competitors in IPA, in the field of quality management. This study is aimed to suggest a new prioritizing method for improvement and to test for validity of the proposed technique. Methods: This study used data collected from Song and Lim(2015), which is satisfaction of employees, customers and competitors as well as importance data for 7 quality attributes of K animal hospital. A correlation comparison with other priority methods such as Bacon(2003)'s model and Matzler and Hinterhuber(1998)'s QI index is conducted. Results: The priority results by the proposed method shows better in correlation coefficient with customer perceived priority for improvement than other methods. Conclusion: From the result of the current study, it can be concluded that the result of the proposed method is valid, while it is relatively easy to understand and analyze, and therefore no additional survey is necessary for improvement priority.

A Study on the Methods of Systems Reliability Assurance (시스템의 신뢰성(信賴性) 보증방법(保證方法)에 대(對)한 연구(硏究))

  • Lee, Sang-Yong
    • Journal of Korean Society for Quality Management
    • /
    • v.10 no.2
    • /
    • pp.2-9
    • /
    • 1982
  • In principle the methods of increasing the reliability of complex system can be classified into the following four basic methods: (1) using the stand-by redundancy; (2) decreasing the failure rate of the system; (3) decreasing the time of continuous operation; (4) decreasing the mean repair time. Among the above four methods, it is generally known that the method of stand-by redundancy is the most effective general, to increase the reliability of systems. Therefor this paper aims to compare the gain in reliability which is achieved by applying stand-by redundancy with other methods, and to show the characteristics of each method From the comparison of the methods of increasing reliability, the following important facts are found: When the method of stand-by redundancy is used to increase the reliability of complex systems intended for long-term operation, a hight multiplicity of stand-by redundancy is required. Thus an increase of the reliability of complex system by applying stand-by redandancy is realized at the expense of characteristics such as weight, size, cost, increased complexity of operation conditions. And this property restricts its use in systems which are critical with respect to weight, size, cost or operation conditions. The method of stand-by redundancy is the most effective when this method is used to increase the reliability of complex systems intended for short-term operation, and the method of decreasing failure rate is the most effective when it is used to increase the reliability of systems intended for long-term use. The methods of increasing reliability discussed in this paper make it possible to make highly reliable systems. But it is not possible to make a highly reliable system using a single method of increasing reliability, even if it is the most effective one. Therefore it is recommended to use all or a majority of the above four methods by choosing it in accordance with the properties of the system under construction.

  • PDF

A Study on the Visual Resource Management for Soraksan National Parks and Adjacent Area (국립공원 및 인접지역 경관관리 방안에 관한 연구 - 설악산 국립공원을 중심으로 -)

  • 임승빈;신지훈
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.2
    • /
    • pp.283-292
    • /
    • 1998
  • The purpose of this study is to suggest visual resource management methods for the national parks and adjacent areas, where visual impacts by high rise buildings such as hotel, condominium, etc. become serious problems. In this study Soraksan National Park has been selected as a case study for landscape management planning. The results of this study are as follows: 1) Comprehensive landscape management planning for National Parks and adjacent areas is necessary to solve visual impact problems by high rise buldings such as hotel, condominium, etc. 2) It is suggested to investigate visual resources and conceptual landscape management ideas, to select landscape control points and lines, landscape management areas, and to prepare building height control plan for proper landscape management plan. 3) In case of Soraksan national park, the landscape management plan includes three landscape management areas : Landscape preservation area, General landscape management area, and special landscape management area. 4) In the part of special landscape management area, it is necessary to introduce landscape impact assessment system to more effective landscape management.

  • PDF

MANAGEMENT THINKING BEHIND PERFORMANCE MEASURES

  • Yong-Woo Kim ;Glenn Ballard
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.377-382
    • /
    • 2005
  • The tools, methods and measures used for project control reflect underlying theories of management. Management theory has been neglected in the construction industry, which has rather focused on tools and neglected theory. This paper contributes to the theory of project management by introducing and developing two fundamental and competing conceptualizations of management: MBM (Managing-by-Means) and MBR (Managing-by-results). Current project control and performance measurement practice is based on MBR. However, project control based on MBR may not be appropriate for managing dynamic projects. The paper present the Last PlannerTM System (LPS) and Process Variance Control (PVC) as examples of methods reflecting the MBM view. It is argued first that the MBM view is appropriate for managing uncertain, complex and quick projects. The paper also explores how MBR tools and techniques may be appropriately used within an MBM framework.

  • PDF

Relationship between Debt Ratio and Earnings Effect of Earnings Management's Estimating Method, Debt Type (부채비율과 이익조정의 관계에 이익조정 대체적 측정치와 부채유형이 미치는 영향)

  • Park, Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.4
    • /
    • pp.1932-1937
    • /
    • 2014
  • This paper examines whether debt ratio effects earnings management. There are various methods that estimate earnings management. This paper examines whether these methods impact on the relationship between earnings management and debt ratio. In addition, this study examines whether these relationship effects of debt type. Previous studies in this area haven't examined the relationship between debt ratio and earnings management in Korea. These studies didn't consider earnings management's method to analysis for this relationship. This paper tests the relationship between earnings management and debt ratio with methods of earnings management unlike from previous studies. Results are summaried as following. First, the relationship between debt ratio and earnings management was different for these methods. Abnormal Accruals that used estimation of eanrnings management in previous studies didn't examine these results that debt ratio effects of earnings management. However, it was significant positive the relationship between real activity management and debt ratio.

The Characteristics of Coastal Zone Management Methods in U.S.A -Focus on Zoning & Integrated Methods of Different Kind Data- (미국 연안구역(Coastal Zone) 관리수단의 특성 -조닝방식과 이종 데이터 간 통합방법을 중심으로-)

  • Oh, Ji-Hoon;Lee, Seok-Hwan;Lee, Hee-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.9
    • /
    • pp.3590-3598
    • /
    • 2010
  • It is necessary to collect the coastal zone data, to prepare the objective analysis methods, and to build the scientific and technical support system for the efficient management of coastal zone in local aspect. This study analyzes the coastal zoning methods and the integrated methods of different kind data by case study of U.S.A coastal zone. The characteristics of coastal zone management methods in U.S.A are as follows; the concrete indices and methods of establishing coastal zone which can respond to the local values and land use, related data analysis methods for supporting spatial decision making, and establishment and administration of bureau for the spatial information construction and integration of coastal zone. This study suggest the technical implications which can build the domestic coastal zone management in local level on the basis of the common values of the coastal zoning methods and integrated methods of heterogeneous data in U.S.A.

Performance of Evidence-based Pain Assessment and Management Guidelines among Medical-Surgical Nurses (내·외과 간호사의 근거기반 통증사정 및 관리 가이드라인 수행도)

  • Kim, Heui Lyang;Song, Chi Eun;So, Hyang Sook
    • Korean Journal of Adult Nursing
    • /
    • v.28 no.5
    • /
    • pp.546-558
    • /
    • 2016
  • Purpose: This study aimed at the effectiveness to investigate the performance of evidence-based pain assessment and management guidelines. Methods: Participants were 140 nurses at the med-surgical units. Data were collected in early July, 2014 using Registered Nurses Association of Ontario (RNAO) guideline (2007) revised and validated by Hong and Lee (2012) and analyzed by descriptive statistics, t-test, ANOVA using SPSS/WIN18.0. Results: The score of performance of pain assessment guideline was higher than the score of pain management. Categories with high score were pain screening, parameter of pain assessment, documentation, assessment of opioids side-effects, and record of pain caused intervention. Categories with low score were comprehensive pain assessment, multidisciplinary communication, establishing a plan for pain management, consultation and education for patients and their families, and education for nurse. Non-pharmacological management was the lowest one. Conclusion: Assessing and managing pain is a complex phenomenon. It might be useful if institutions host training programs to ensure that nurse are better able to understand and implement pain assessment and management. Since non-pharmacological management is less likely to be used by nurses it may be helpful to include these methods in a training program.

On the Application of Risk Management by Levels of Project Management Maturity (프로젝트관리 성숙도별 리스크관리 적용)

  • Min, Taek-Kee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.2
    • /
    • pp.19-29
    • /
    • 2011
  • The uncertainty of a project generates risks hindering the goal achievement of the project, and the risks affect the success or failure of the project significantly. Risk management, a part of the project management, includes various processes, and there are also various tools or techniques applicable to that. In an organization, the application of project management develops gradually from low to high maturity, and the organization should choose and implement a method of application proper for the level of its maturity. This article suggests a method to reduce inefficiency of the management and how to apply risk management by levels of maturity for easier application. For this, the stages of project management maturity levels were divided into the introduction, development, and maturity step, and methods of risk management suitable for each stage were applied. And methods of risk management that need to be applied by the levels of project maturity are divided into three factors : risk management processes, risk management tools and techniques, and risk management standards and templates. It is expected to be favorable approaches for the application of risk management in an organization to divide those factors into more concrete processes, tools, techniques, and standards and apply them by the levels of management maturity.

A Development of Methodology for Maintenance and Management of the Sustainable Traditional Village in Korea - A Comparative Study of Korea and Japan - (지속가능한 전통마을의 유지와 관리방법론의 개발 - 한국과 일본의 비교 연구 -)

  • 강동진
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.5
    • /
    • pp.1-19
    • /
    • 2001
  • This paper is designed to find and develop new concepts for the sustainable traditional village in Korea. To this end, it is necessary that concern for the traditional village should diversify and expand, and not concentrate solely on the cultural properties and architecture-oriented historic elements. In consideration of this notion, this paper suggests introduction of maintenance and management as a practical concept for the embodiment of the sustainable traditional village. This paper aims to explore the concrete maintenance and management systems of Korean and Japanese cases, to analyze differences and characteristics between the two nation\\\\`s, and through these comparisons, to suggest sustainable maintenance and management methods for the traditional village in Korea. Primary data was collected by field and interview survey on each village in the two nations several times during about a two year period. The major findings of this paper are presented in three categories--maintenance management frame, maintenance management contents, and necessary principles for progressive maintenance management, and are as follows; In the first step, suggests the basic directions, boundaries, and systems for the maintenance and management of sustainable traditional villages. And in the second step, analyzes the relationship among the contents of maintenance and management methods with focus on the village space, village attraction, and village community. Our results suggests diverse maintenance and management contents for the sustainable village maintenance and management. Finally, the basic principles for the application, and use as valuable tools for sustainable village maintenance and management, are strongly recommended.

  • PDF