Improvements of Post-Project Environmental Management for the System of the Sea Area Utilization Consultation (해역이용협의제도의 사후환경관리 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Eom, Ki-Hyuk;Jeon, Kyeong-Am;Kang, Sung-Kyung
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.2
    • /
    • pp.121-129
    • /
    • 2013
  • This study investigated the status and problems of the post-project environmental management for development projects and suggested improvements of the system to achieve effectiveness for the system of the sea area utilization consultation. The post-project environmental management has had several problems such as the neglect of implementations and checks for the consultation items, the lack of actions and notifications of results, the absence of awareness and expertise of the post-project environmental management. In addition, although it is very important to verify results of actual change and modelling of marine environment before and after the projects, the marine environmental monitoring and assessment have been perfunctorily carried out. Thus, for the improvements of the post-project environmental management to the system of the sea area utilization consultation, it is extremely necessary for related stakeholders to raise awareness of the post management and implement it faithfully, and establish the post management system for conflict resolution and enforce sanctions and accountability against executory items. Furthermore, it should establish systematic monitoring system of marine environmental impact survey.

New Paradigm and its Policy Framework in Decision-making on Large Dams

  • Park, Sungje
    • Journal of Wetlands Research
    • /
    • v.8 no.1
    • /
    • pp.97-106
    • /
    • 2006
  • This study discusses two canceled dam projects, Youngwol Dam in South Korea and Two Forks Dam in Colorado of the United States. Both of them illustrate how the new paradigm applies to regional water projects because they became victims of environmental opposition in the new paradigm. While the cases have no apparent close relationships and they occurred in different decades, they offer interesting comparisons. They were basically struggles between water development coalitions and environmental protection coalitions on regional water conflicts. The two proposed projects brought about fierce debates on large dam as they embraced a wide-range of environmental, social, and political issues rather than construction of dams themselves. Huge anti-dam oppositions scrapped them at the cost of nearly ten years for decision-makings and enormous financial resources for feasibility studies respectively. It identifies who the policy actors were, what the policy strategies were, and how the water policies evolved in both countries. The decision-makings on the two projects appeared at first glance to be made under formal institutional frameworks, but in actuality, they relied significantly on decisions of the two important political actors. The Korean society began to learn negotiation and cooperation approaches to solve the water conflict by establishing the Joint Task Force Team on Youngwol project in 1999. The team is recognized as a new conflict resolution method in South Korea because a diverse of stakeholder interests voluntarily participated in the decision-making process and discussed water issues directly. Even though the projects resulted in futile fruits in each country, they illustrate the images of the new paradigm that significantly affected in formulating regional water policies in South Korea and the United States.

  • PDF

DESIGN GUIDELINE FOR BIOSAFETY LABORATORY CONSTRUCTION

  • Tzu-Ping Lo;Sy-Jye Guo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.587-591
    • /
    • 2005
  • The case of laboratory-acquired SARS Corona virus infection in Taiwan has revealed a number of weaknesses in management, construction, and oversight of laboratories. Also, with the increased demands for bio-safety laboratory, there is an urgent need to develop a uniform and comprehensive guidance for architects and construction engineers in the preparation of design and construction. This research investigates the key elements for designers, engineers, and potential owners in biosafety laboratory design and construction. It defines key elements and determines major relationships and standards that should be adhered to when developing site layout. In addition to layout planning and design guidance of biosafety laboratory, this research also interviews the perspective of architects and survey the state-of-the-art technology in Taiwan. It represents the portraits by site investigation. The purpose of the research is to provide guideline of design and avoid potential future conflict to ensure the critical continuity of functions.

  • PDF

Direction of CM Services Defect Liability in the CM Contract

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.3
    • /
    • pp.209-217
    • /
    • 2013
  • The execution of a construction project involves the engagement of many participants. Generally, the Authority uses CM to certify that the Work is built according to the contract documents. The CM work scope is expressed in the Construction Technology Management Act and its Regulation. The mandated and delegated CM services are limited to the construction period. If Contractor is required to repair a construction defect, the Contractor should bear the burden of the inspection service for the defect repair, because it is associated with him. Nevertheless, CM should submit a bond to provide the inspection and supervision service for the defect repair. These may result in conflict with each liability. Therefore, CM service in the law and regulation was investigated and analyzed in this study to classify the characteristics of CM contracts, and it was suggested that the CM liability for the inspection and supervision service for the defect repair should be reconsidered.

Mediating Conflicts in Concurrent Engineering / Design Environment (동시공학/설계 환경에서 Conflict 중재)

  • Kim, Myong-Ok
    • The Journal of Society for e-Business Studies
    • /
    • v.1 no.2
    • /
    • pp.161-173
    • /
    • 1996
  • It Is a typical scenario in concurrent engineering/design that different perspectives of each team members participating In the project exist, and those perspectives lead to conflicting decisions. The model 'resolution network' proposed in this work provides system-mediated resolution for all related team engineers to consider to optimize the manufacture in general. This paper focuses on development of the general architecture of the model and a search engine called Mediator to determine a resolution network from a given constraint network. The Mediator manages the constraint network, determines the most optimistic resolution called optimal point in terms of satisfying overall production goal , and use the optimal point to mediate controversial issues among teams. The biggest merit of our model is that it provides teams with resolution with logical and rational reasoning.

  • PDF

A Study on Compensation of Land according to the Spatial Properties -In case Compensation of Public Housing District- (공간정보 속성에 따른 토지보상액 결정에 관한 연구 -공공주택지구 보상사례를 중심으로-)

  • Moon, Jae-Hyeok;Lee, Myeong-Hun
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.11
    • /
    • pp.188-198
    • /
    • 2016
  • In order to supply the residential land for the promotion of public welfare, it must take a land of city suburb. That land have the difference in thinking is large for the determination of land prices to a variety of development pressure and land use regulations. In the process of executing a public project, the difference of these ideas has become a cause of conflict. Therefore, through objective study for the determination of land prices, to reduce the difference of ideas is going to be a clue of conflict resolution. This study selected the case area that is typical public district of many conflict, and then fix a compensation unit price like fair price as dependent variable. The selected variables through previous studies and expert consultation was an independent variable. To analyze the impact factors of land prices in the hedonic price model. The results were analyzed by distinguishing the group on the basis of the zoning and using, whether or not the site of the building in part that there is influence variable, the aspects of accessibility and regulation in part degree of influence variable came out different results for each group. It is analyzed that it reasonable results. Add selected site assimilation of the building that have not been presented in previous studies as a variable and which was applied at a rate to a variable of road have improved in more expliction of the influence of variables.

Article - 환기.방재측면에서의 초장대.대심도 터널에 관한 고찰

  • Lee, Hang
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.54
    • /
    • pp.41-55
    • /
    • 2011
  • The current railway projects under plan, design, or construction have been designed as 'very long and deep underground tunnel'. Therefore, it is reasonable that the standards for preventing disaster in such conditions should be intensified in order to avoid repeating the same failure which happened in Daegu subway disaster, Although we consent to the opinion that nothing can compete with human being's life, it is very difficult to protect the life from all of potential disasters perfectly in railway fields because the excessive standards can result in excess construction cost, which can bring about cancelation of the project itself eventually. Therefore optimized disaster design standard is required to negotiate the conflict between economical cost and social tolerance limitation simultaneously.

  • PDF

Analysis of The Problem of Exercising the Right of Claim for the Sale of the Housing Reconstruction Project (주택재건축사업의 매도청구권 행사 절차의 문제점 분석)

  • Kim, Kil-Chan;Park, Kyoung-Mi;Eom, Sun-Yong;Lee, Myeong-Hun
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.7
    • /
    • pp.508-518
    • /
    • 2011
  • In various urban renewal projects related to real estate, developer in order to conduct the business, must get real estate inside project section directly or receive the consent for project from the owners. It must be carried out by consultation. When it fails, developer, in order to get ownership, adopts 'the Right of Claim for the sale' which has forcibleness. However, because the procedure for implementation of the right of claim for the sale is not clear, conflict between stakeholders is caused and it causes extension of period. Therefore, after examining judgments and references of judicial power for administrative litigation of the Right of Claim for the sale, by researching stakeholders of the housing rebuilding project and based on the results, finding out differences of stakeholders' recognition according to their position and problems of exercising procedure of the Right of Claim for the sale, and by presenting improvement plans of the system of the Right of Claim for the sale, contributing the success of the housing rebuilding project is the purpose of it.

A Case Study on Information Strategy Plan of the Web Based on Project Management Information System for Construction Company (전사 웹기반 사업관리시스템 구축을 위한 정보화전략계획에 관한 사례연구)

  • Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.259-267
    • /
    • 2008
  • Nowadays PMIS (Project Management Information System) based on web is widely applied to communication, collaboration and community in construction jobsite for various organization such as subcontractors, general contractor, engineering company, supervisors and client. However, individual PMIS in jobsite is prone to be troublesome issue for integration and exchange of information regarding project management in corporate and may result in conflict of data application. The main reason should be lack of information strategy plan such as company master plan for information. This research shows a critical success factor that a big construction company of Korea establishes procedure and method for information strategy plan. In addition, It is to suggest how to be implemented PMIS architecture and execute business process innovation in corporate level. This research expects contribution that many construction companies reduce mistakes to be implemented management information system and to optimize system in corporate level.

A Study on the Improvement Contract System of to Prevent Domestic Public Construction Claims (국내의 공공건설 클레임 예방을 위한 계약제도 개선방안 연구)

  • Jung, Min-Jung;Cho, Young-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.239-242
    • /
    • 2007
  • Many contractors have overlooked the construction contract general conditions and it was a bad construction practice. Today, construction project is very complex and complicated. This requires a networked contract document and results in a complicated contract conflict hardly to be solved. Therefore, to reduce the construction dispute and to enhance construction practice, clarification of definition of Owner, several conditions to be revised, insertion of design supervision were suggested in this paper.

  • PDF