Critical Assessment of Programme-Based Conflict Resolution Model Applied to Multiple Stakeholders Within The Context of Industrialized Building Production and Life Cycle Supply Chain System

  • Tanaka, Koji
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.551-562
    • /
    • 2022
  • The building production system has been analysed by the dichotomy "employer-contractor" relationship, which failed to take into account of the role and function of multiple stakeholders within the life-cycle supply chain. This is further observed in the current conflict resolution model, which, in my argument, struggles to contribute to industrialize the building production and achieve better efficiency and effectiveness as expected. The purpose of this paper is to critically assess the issues of current programme-based conflict resolution model, and discuss alternative models how they can be modelled and applied to the construction projects. The conclusions of findings are; First, the current model is framed around the contracts and dispute resolutions based on the legal concept of "claimant and respondent" where one party(s) advances a claim once and the other(s) objects, as such it fails to reflect the nature of construction projects where multiple stakeholders are involved concurrently and for a long period of life-cycle of buildings. Second, an alternative is "Six-stakeholders model" which represents the multiple stakeholders and clarifies the flow of obligation-liability-monetary relationships among participants for a long period of life-cycle of buildings. Further, with reference to both historical and recent cases, a reflection and insight into pros and cons of programming method is added, especially as to why this method is considered to have become a mandate of the modern construction management, and how academics and practitioners should deal with it more cautiously and prudently.

  • PDF

The Effect of Collaboration through Mobile Messenger Service on Team Performance in Team Projects: Focused on Negative Effect (팀 프로젝트에서 융합 모바일 메신저 서비스를 통한 협업이 팀 성과에 미치는 영향: 부정적 영향을 중심으로)

  • Kim, Byoungsoo;Kwon, Boung Soo;Woo, Saeeun;Chun, Jae Kwan
    • Journal of Digital Convergence
    • /
    • v.14 no.3
    • /
    • pp.95-103
    • /
    • 2016
  • Nowadays, team members often use mobile messenger service (MMS) in performing team projects. Team members can freely express their ideas or opinions using MMS without any restrictions in terms of place and time. But, in team project, using MMS is pressing them to perform their project more quickly than off-line conference, and assigning a role outside the range of their ability. In other words, team members can recognize work overload by utilizing MMS and this work overload can lead to team conflict. This study examines the effect of work overload through MMS use on team performance. We consider team engagement and team trust as the key drivers of team performance. However, team conflict will obstruct team engagement and team trust. Research model was analyzed by 135 university students who were doing several team projects. The analysis results show that work load through MMS use has a significant effect on team conflict. In other words, when work load is increased by utilizing MMS, it leads to team conflict. This team conflict loses trust between team member and hinders team performance. Lastly, this research provides several implications for right usage of MMS to improve team project performance.

DATA WAREHOUSE PROTOTYPE SYSTEM TO SUPPORT THE MASTER PLAN OF URBAN REGENERATION PROJECT

  • Dong-Hyun Cho;Sang-Geum Lee;Hyung-Jin Park;Kyo-Jin Koo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.361-368
    • /
    • 2009
  • In the Urban Regeneration Project, the scale becomes huge and the composition of participating organizations is complex. It is necessary to establish the master plan fast and effectively harmonize conflict options and interests in the early stage of the project. However, the master planner, who is tasked to establish the master plan, and the master planning team, are difficult to establish the master plan fast while effectively considering various and complex information related to regeneration. The Urban Regeneration Project is composed of various types of computer files like HWP, EXL, PDF, DWG and others. When the master plan is established, it is necessary to link the information items and physical files of urban generation in order to effectively save the files in storage for easy search and utilization. This study developed a prototype system to support participating subjects of the Urban Regeneration Projects. It will effectively utilize the information items in the physical computer files using information blocks and Metadata. The developed system provides the base to effectively manage large amount of documents in the early stage of the Urban Regeneration Project and make effective decision-making using the concept of data warehouse.

  • PDF

Rational high-speed railway plan for passing through metropolis (고속철도의 합리적인 광역도시 통과방안)

  • Ahn Yong-Mo;Kim Hong-Yeoun
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.144-150
    • /
    • 2005
  • After the historic opening of the first section of KTX(Korea Train eXpress), it has been made changes three times in a plan to pass through cities of Daejeon, Daegu in the construction of the high speed train's second section(underground${\to}$ on ground${\to}$ under ground${\to}$ on ground). Thereafter, it has been repeatedly argued that the plan to pass through underground caused many problems such as prevention of an accident in tunnel, the difficulty of maintainence, the disadvantage of passengers' moving line. Thus construction on ground plan is coming up again with relation to the interest among local people. There have been lots of national budget loss, construction period delay in this project and people hardly trust policies about national project and nor do engineers. It will be presented that the railway line which is accorded with the characteristics of region, an agreement with local communities about national project, the reasonable procedure to determine how to pass through cities, resolve the conflict among neighborhood, and the role of engineers.

  • PDF

Development of Traffic Conflict Technique with Fuzzy Reasoning Theory (퍼지추론을 적용한 교통상충기법(TCT) 개발)

  • ;;;今田寬典
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.1
    • /
    • pp.55-63
    • /
    • 2002
  • It has been known well that Traffic Conflict Technique(TCT) used to evaluate the safety of intersections in the case of shortage of traffic accidents data and surveying time. Because data for using in traffic conflict technique that is collected by trained surveyors, it is rely on the knowledge, experience and the characteristics of them. The data of surveying generate varying result. So, its variance must minimize and then it is considered of calculating in traffic conflict technique however obviously technique to minimize has not developed until now. So, this paper has a focus on the technical method to minimize the variance. For this, it applied the fuzzy reasoning theory to the existed traffic conflict technique that is the most comprehensive method in the country and then developed the new traffic conflict technique model. Fuzzy reasoning theory is a very appropriate method for minimizing the variance among surveyors because it can systematically calculate the uncertainty of surveyors by approximation reasoning structure. The result of analysis from pilot study, the new Procedure in this Paper minimized the variance by 53 Percentiles and it increased the value of conversion factor two times than the exited traffic conflict technique. The method proposed in this paper, it can be used for evaluating the safety of intersection, and before and after analysis of improving Project of black spots.

A Conceptual Framework to Study the Effectiveness of Interface Management in Construction Projects

  • KEERTHANAA, K.;SHANMUGAPRIYA, S.
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.3
    • /
    • pp.1-21
    • /
    • 2019
  • The management of mega construction projects which incorporate a large number of stakeholders, technologies, data, work culture etc., is cumbersome. The experts in the construction arena advocate that interface management serves as a precise tool in resolving these conflict points due to the intricate nature of the construction projects. Interface management is a current trending management practice in the construction industry which is also a beneficiary to mega/fast track projects in enhancing the project performance. The main objective of this study is to validate a model for assessing the relationships among interface management, IT applications, project performance & project benefits. The mediating effect of interface management in relationship between project performance & interfacial factors was also investigated. The research model was validated using PLS-SEM (Partial Least Square-Structural Equation Modelling) approach. Data were collected from clients, contractors, consultants in large scale projects through questionnaire survey and smart-PLS software was used to analyse the conceptual model. The research model comprises eleven hypothesis and the significance of these hypothesis were tested using T- statistics values. The research implies that people/participants factor is greatly influenced by interface management with the path coefficient of 0.608 and also enhancement of project's schedule performance due to the interface management is strongly appealing (Path coefficient = 0.711). The results also reveal IT application is significantly associated with interface management practice (Path coefficient =0.723) and also the effect of IT application on project performance (schedule, cost, quality & safety) is successfully mediated through interface management practice. The practical application of this validated model was done through case study. The case study aims at measuring the impact of interface management on interfacial factors and role of interface management in improving the project performance in the construction organisations.

Integrating Order Process in Residential Building Construction (주거시설공사의 하도급 통합발주 프로세스 개발)

  • Kim, Yongl-Won;Park, Hyung-Jin;Jung, Jin-Hyun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.84-85
    • /
    • 2013
  • Integrating multi-trade works system helps to reduce to minimize the conflict of subcontract business and improve communication to increase productivity of construction. However it takes such a big risk if subcontract of integrating multi-trade works went bankrupt during the project so some of construction companies executed to only small project and it's not sufficient to adopt overall project. This paper suggested the improvement scheme of work classification integrating multi-trade works, which takes a consideration into work zoning in order to apply current work situation.

  • PDF

A Study of Risk Analysis on Apartment Reconstruction Projects (공동주택 재건축사업의 리스크 분석에 관한 연구)

  • Lee Lo-Na;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.232-235
    • /
    • 2004
  • The apartment reconstruction project is making some problems, such as delay of lack specialty, conflict between project owners and cost increasing etc. The enforcement process of project are very complicated, the term of project is long and too many project owners are participating. For this reasons. it is always in the face of uncertainty. To promote the reconstructing project successfully. we need to make risk management process to get rid of uncertain factors which occur in forwarding the reconstructing project This study has for its objects. First, suggest the best way of risk analysis to manage risk factors systematically and efficiently recognized in The Apartment reconstruction protect. Second, furnish basic data to build the risk managing system of The apartment reconstructing project.

  • PDF

Disputes in Managing Projects: A Case Study of Construction Industry in Vietnam

  • VO, Khoa Dang;NGUYEN, Phong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.8
    • /
    • pp.635-644
    • /
    • 2020
  • The construction industry in developing countries like Vietnam, which incorporates small and medium construction enterprises, is typically more prone to disputes and contract dispute-related lawsuits. A dispute may occur at any time in the life cycle of the project. It is sometimes solved with the intermediation of a lawyer or directly by stakeholders. Understanding the causes of disputes in a construction project not only improves the efficiency of a company but also increases the success of projects. This study was carried out using a questionnaire survey at construction projects in Ho Chi Minh City. Sample data with 117 observations were analyzed to find the disputing factors in construction projects: diversity of working style among the parties; reluctance to work; and poor teamwork. Correlation coefficient on a rank of factors between design consultant and contractor; Design consultant and project owners are positively correlated. The Exploratory Factor Analysis (EFA) analysis identified six groups of factors in construction disputes: cooperation, technology, economics, productivity, information, and behavior. The findings are useful for enterprise practice and provide participants with an overview of sources of dispute. Thus, a more complete risk management plan can be formulated, which will accelerate project progress and improve the likelihood of success.

The Housing Environment Evaluation of Munhwa-Mauel in Rural Area

  • Yoon, Chung-Sook;Jeon, Yeong-Mi
    • Journal of the Korean housing association
    • /
    • v.10 no.3
    • /
    • pp.137-144
    • /
    • 1999
  • The movements to improve rural housing environments have been promoted since the beginning of Sae-Mauel project in 1970s. Since then policies to develop village units and to improve housing units and public facilities have been increased. These trends reflect rural inhabitants' strong desire to enjoy a quality of life. The project of Munhwa-Mauel aims to improve rural housing environment conducted by the Ministry of Agriculture and Forestry since the early 1990s. As of 1998, among 105 districts under the project. 56 districts have been parceled out and sold. The number of Munhwa-Mauels is expected to increase under Government's policy to construct 772 Munhwa-Mauels by the year 2004, which may have a large influences on private sectors. So far several studies have been conducted on the Munhwa-Mauel project. According to them Munhwa-Mauel has merits such that it modernizes the rural villages, and decreases the number of people moving out. while it causes conflict between the residents and the newcomers. Munhwa-Mauel also provides uniform housing layouts and unsuitable environments for the rural area, and lacks locality and facilities to promote income. As, however, the results of previous studies have not been verified through systematic researches, it is necessary to search a verified approach through the evaluation on housing environment in various aspects in order to provide planning guidelines for rural villages.

  • PDF