A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

IT서비스 프로젝트에서의 팀 내 갈등현상에 관한 비교사례연구 (A Case Study on the Team Conflict Phenomenon in IT Service Project)

  • 박상희;조남재
    • Journal of Information Technology Applications and Management
    • /
    • 제16권4호
    • /
    • pp.109-134
    • /
    • 2009
  • Compared to research on the success of IT projects in general, research on the management of conflict in IT teams and its impact on project success is insufficient. This research performed a comparative study to analyze the nature and evolving phenomenon of conflicts in IT project teams. This study aimed at; First, Why a conflict is created within and around an IT project team. Second, What is the phenomenon of conflict evolution, diffusion, and/or resolution? Third, How the differences in conflict management style affects the IT project performance? Three propositions were drawn from the analysis of two intensive analysis of conflict cases and their comparison. Proposition 1 : Both 'the method of pointing out a problem' and 'the pointed-out contents' can be the trigger of conflicts around an IT project. Proposition 2 : While the focus of attention of one party is 'the method of pointing out a problem', if the other's and focus of attention of one party is 'the pointed-out contents', that is, if the focus of attention mismatch, the conflict can be amplified. Proposition 3 : According to the temporal nature of the relationship, e.g., short-term versus long-term, the way people approach and deal with the conflict differs.

  • PDF

PMO 대가 산정모형의 개발 (A Study on the Development of PMO Cost Estimation Model)

  • 서용원;이덕희
    • 한국IT서비스학회지
    • /
    • 제13권4호
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.

위키방식의 전문지식 협력이 프로젝트 구성원의 성과에 미치는 효과 (Wiki-Based Expert Knowledge Collaboration Effects on Performance of Project Members)

  • 김희영;강성배;이주헌
    • 한국IT서비스학회지
    • /
    • 제12권1호
    • /
    • pp.173-187
    • /
    • 2013
  • The advent of Web2.0 has believed to be the solution against many barriers in information sharing, especially wiki. Information sharing and collaboration are realized voluntarily and unselfishly with wiki. The purpose of this paper is to analyze the benefits and challenges of using wiki as a project management method in an IT/IS project. Wiki-based project management could provide project managers and members with expert knowledge collaboration for better project results. In the research model, we used TMS(Transactive Memory System) theory to define the relation of collaboration and performance of project members. Based on a survey among project members, the interactions between wiki characteristics and performance are examined in an IS project environment. Using Smart PLS 2.0, the data was analyzed to define the interactions by the structural equation modeling. From the empirical data, the mediated effect of expert knowledge collaboration is supported. We also derive the implications of wiki-based method. It is expected to bring new possibilities of Project management performance.

소프트웨어 개발을 위한 통합 프로젝트 관리의 개념적 모형에 관한 연구 (A Study on the Integrated Conceptual Model of Software Development Project Management System)

  • 문용은;이재범
    • Asia pacific journal of information systems
    • /
    • 제6권1호
    • /
    • pp.241-267
    • /
    • 1996
  • The problems like exceeding estimated cost, late due-date, expensive maintenance, insuffiency of experts and low productivity are becoming emphasized related with the software development. In order to overcome these problems and to develop the highly qualified software within the limited resources, a project management tool is used. The purpose of this study is to develop a conceptual model of the project management system which can plan, analyze and control the software development projects effectively. The model is constructed with plan and track management system, cost management system and operation management system for the efficient project management. It is named by LSD-PMS : Large-scale Software Development Project Management System. We reviewed 5 cases of project management. LSD-PMS is evaluated and reviewed by the project managers in the field. It is proved that LSD-PMS is a tool which can help project managers develop software successfully given budget and time schedule. In the future, this system should be further developed as an integrated model with system implementation tools such as CASE products.

  • PDF

Evaluation and improvement of forest watershed management projects in Korea

  • Rhee, Hakjun
    • 농업과학연구
    • /
    • 제47권4호
    • /
    • pp.885-901
    • /
    • 2020
  • A forest watershed management project was introduced in 2004 to develop ecologically sound forest watersheds. It includes landslide prevention and erosion control, water resource management, landscape development, and forest resource management. However, it has been managed fragmentarily and inefficiently, far from the original intents. This study investigated current status, problems, and improvement measures of the project. Literature reviews were conducted on forest watershed management in Korea and other countries, and surveys were conducted on 201 erosion control experts. When introduced, the forest watershed management project was well planned and implemented as intended. It later turned to focus only on disaster prevention such as erosion control dams and stream conservation measures. The survey results showed that a majority (89% and 86%) of surveyees wanted increases in the project period and budget. They also responded that conflicts with local residents (51%) and determining project locations (32%) were the most difficult tasks when implementing the projects, and only 36% kept project records. To plan and implement the projects as intended, the following suggestions should be considered: (1) establishment of a solid legal foundation and improvement of the erosion control practices law; (2) increase in the project period (from 1 to 2 - 3 years) and budget; (3) development of a manual for project site selection and guidelines; (4) monitoring and systematic information management; and (5) development of spatial analysis tools for watershed analysis and management.

SI 프로젝트 관리자의 리더십 역량과 프로젝트 참여자 개인역량이 프로젝트 성과에 미치는 영향에 관한 연구 (A Study on the Influence of SI Project Manager's Leadership Competencies and Project Participants' Individual Competencies on Project Performance)

  • 이중우;이철규
    • 한국IT서비스학회지
    • /
    • 제21권4호
    • /
    • pp.27-61
    • /
    • 2022
  • In order to improve project performance by analyzing the effects of the project manager's leadership competency and the individual competency of the project participants on the project performance, this study examines the effect. In this study, a research model and hypothesis were established to understand the causal relationship between leadership competency, individual competency, and project performance, and a survey was conducted based on this. Overall, it was found that the leadership competency of the project manager and the individual competency of the project participants had a positive effect on the project management performance, the project leadership competency had a positive effect on the completion performance, and the project participant individual competency had a negative effect on the completion performance. As a result of analyzing the effect of the project manager's core competency on the project management performance according to the amount or period of the project type, which is the moderating variable, it was found that there was no moderating effect on the management performance. For the success of the SI project, it is most important to understand the project characteristics well and select a PM suitable for the characteristics, and methods for nurturing excellent project managers should be further studied. In addition, it is expected that it will be possible to identify the effect of project manager leadership competency and participant competency on project performance based on sophisticated research design for more competent PM selection.

철도사업의 종합사업관리 국제경쟁력 강화방안에 대한 연구 (A Study on the Improvement of Project Management System for International Competitive Power and Global Business Strategy of Rail Project)

  • 이영주;장성용
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1595-1600
    • /
    • 2004
  • High speed railroad project management has been almost completed by starting operation of Seoul-Busan high speed railroad with the exception of a few constructing blocks currently in April, 2004. After Korea Rail Network Authority was established in 2004, it needs to develop new project management system for both conventional railroad construction and high speed railroad construction for domestic railroad projects, while it plans to invest in overseas railroad project for logistics innovation and improvement in passenger transport services on a large scale. Therefore this paper provides the method that we can adapt the project management system for high speed railroad containing experiences and know-how from construction of high speed railroad for both conventional railroad construction and high speed railroad construction or improve project management system for high speed railroad to use it as project management system for overseas railroad projects.

  • PDF

형상관리기법을 활용한 대형 프로젝트 정보화 전략개발 (A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project)

  • 원서경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF