• Title/Summary/Keyword: IT Project Feasibility

Search Result 388, Processing Time 0.032 seconds

A methodology for Predicting Equity Input Timing/Amount for Decision Making of Financing Apartment Housing Projects - From the Perspective of Mid-sized Construction Companies - (공동주택 PF사업 참여 의사결정을 위한 자기자본 투입 시점/규모 예측방법론 - 중견 건설사의 관점에서-)

  • Yoo, Jinhyuk;Cha, Heesung;Shin, Dongwoo;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.21-30
    • /
    • 2016
  • The current PF project is entirely relying on construction company's credibility. As such, it has increased a negative and bad recognition in domestic real estate economy. In addition, PF experts has a perception that a project's safety of future cash flow profitability is more important than the construction company's credibility. So many PF experts make an effort in order to set aside safe project structure of PF and analyse systematically the risks of the project. In common feasibility study of the PF Project, financial specialists and real estate specialists are forecasting and evaluating the suitability of the project through reviewing the development profit from the project of sales. However, cash flow analysis and evaluation from the perspective of mid-sized construction companies are still in the primary level. Therefore, this study has analysed the current feasibility study and go/no go decision making procedures. Then the authors have a new cash flow analysis method from the perspective of mid-sized construction companies, by improving the feasibility study and go/no go decision making procedures.

Feasibility Analysis on Slag Reprocessing Project in Lubumbashi, Democratic Republic of the Congo (DR콩고 루붐바시 슬래그재처리사업(再處理事業)의 경제성(經濟性) 평가(評價))

  • Kim, Yu-Jeong;Kim, Dae-Hyoung
    • Resources Recycling
    • /
    • v.21 no.1
    • /
    • pp.49-59
    • /
    • 2012
  • One of the world's top resource-rich countries, the Democratic Republic of the Congo has ample reserves of cobalt, iron ore, copper and diamond in particular. Importing most of major mineral resources, the Republic of Korea has examined-together with the Congo government since 2008-the possibility of a project where it supports port construction in the Democratic Republic of the Congo and acquires useful minerals such as zinc, cobalt and copper in exchange through slag reprocessing in the local city of Lubumbashi. This study conducted feasibility analysis on the slag reprocessing project in Lubumbashi, Congo and found that the project's payback period stands at 6.7 years, net present value(NPV) at 34 million dollars and internal rate of return(IRR) at 17.4%. According to sensitivity analysis that takes into account uncertainties concerning taxation, fixed cost, operational cost and resource prices, the NPV of the project ranges from -24.8 million dollars to 92.7 million dollars.

A Feasibility Study on Construction of the Youth Complex Center (청소년수련과 건설사업 타당성분석)

  • No, Byeong-Ok;Song, Jin-U;Choe, Sang-Hyeon;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.125-128
    • /
    • 2003
  • This study aims to feasibility study of the Youth Center. Welfare of adolescents is appeared to a matter of concern and interest as social problems of various kinds related adolescents including the fire at a beer bar in Inchon occur recently. In view of government, in addition to fairness of facility location, location of such facilities arc to be determined the respect to cost of locating facilities and developmental direction in the future. A feasibility study is and effective tool in determining the decision of investment or not and the level of investment priority on projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected three and two by consideration of facilities distribution and connection with others. Five proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. It was estimated by analysis of catchment area, similar facilities, programs, in result 7,260㎡ come into analysis to the best gross area. The finally, it is to study on economical efficiency. Income Statement estimated was came out ₩1,7billion. in addition, it offer various benefit by public facilities.

  • PDF

A Feasibility Study on Construction of the Youth Complex Center (청소년수련관 건설사업 타당성분석)

  • 노병옥;송진우;최상현;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.125-128
    • /
    • 2003
  • This study aims to feasibility study of the Youth Center. Welfare of adolescents is appeared to a matter of concern and interest as social problems of various kinds related adolescents including the fire at a beer bar in Inchon occur recently. In view of government, in addition to fairness of facility location, location of such facilities are to be determined the respect to cost of locating facilities and developmental direction in the future. A feasibility study is an effective tool in determining the decision of investment or not and the level of investment priority on projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected three and two by consideration of facilities distribution and connection with others. Five proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. It was estimated by analysis of catchment area, similar facilities, programs, in result 7,260$m^2$ cone into analysis to the best gross area The finally, it is to study on economical efficiency. Income Statement estimated was came out \1.7billion. in addition, it offer various benefit by public facilities.

  • PDF

Study on Prioritizing the countries for BOT nuclear power project using Analytic Hierarchy Process (시스템엔지니어링에 기반한 원자력 사업대상국가 평가방법 연구)

  • Choi, Sun Woo;Bui, Hoang Ha;Roh, Myung Sub
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.9 no.2
    • /
    • pp.1-6
    • /
    • 2013
  • Developing Build-Own (or Operate)-Transfer (BOT) nuclear power project carrying large capital in the long term requires initially well-made multi-decision which it prevents sorts of risks from unexpected situation of target countries. In order to analyze the feasibility of project country, the Analytic Hierarchy Process is adopted. Firstly, the factors influencing the success of BOT nuclear power project in overseas countries were investigated through the literature survey for the country risk and were evaluated by expert interview for estimating comparative weight through pairwise comparison between such factors. Finally, it is developed comparative database of alternate countries with respect to each factor. This analytic method enables the developer to select and focus on the country which has preferable circumstance so that it enhances the efficiency of the project promotion. Also, it enables the developer to quantify the qualitative factors so that it diversifies the project success strategy and policy for the target country.

An Analysis of the Economic Effects of the Pilot Project for Multiple-Purpose Utilization of Paddy Fields Focusing on Income and Welfare Changes (소득 및 후생 변화를 통한 농지범용화 시범사업의 경제적 효과 분석)

  • Lim, Che hwan;Ha, Yong hyun;Kim, Do hoon;An, Dong hwan;Yi, Hyang mi;Kim, Kwansoo
    • Journal of Korean Society of Rural Planning
    • /
    • v.28 no.2
    • /
    • pp.71-85
    • /
    • 2022
  • The food self-sufficiency rate of agricultural products in Korea, excluding rice, is around 20%, and the government is promoting various policies including a Multiple-Purpose Utilization of Paddy Fields project, to increase the self-sufficiency rate of major grains. The project for Multiple-Purpose Utilization of Paddy Fields is being promoted as a part of a program to create farmland infrastructure to facilitate the cultivation of crops other than rice in rice paddies, and pilot projects were started in four regions in 2020. The purpose of this study is to analyze the economic effects of the pilot project for Multiple-Purpose Utilization of Paddy Fields, and to propose policies to increase the effectiveness of the project. In order to analyze the economic effect, we estimated the change in farm income generated by switching from rice to other crops, and measured the effect of welfare change using the Equilibrium Displacement Model (EDM). As a result of the analysis, social welfare is expected to increase when the pilot project for Multiple-Purpose Utilization of Paddy Fields is implemented, and the income of the beneficiary farmers is also expected to improve compared to that of single-cropping when double-cropping is implemented. However, it was found that the economic feasibility of the project differs depending on the crops converted. Juksan-myeon, Gimje-si, which is an area where soybean production was successful, was analyzed from the viewpoint of increasing the economic feasibility of the pilot project. Their success factors were analyzed into four major factors: infrastructure, farming methods, education, and collaboration with local agricultural organizations. If such a success story can be utilized in the future project implementation process, it can contribute to the improvement of farm household income and national economic welfare.

A Study on the Method of the Risk Management in the Housing Project (주택사업의 리스크 원인분석 및 대응방안에 관한 연구)

  • Lee, Jong kyu;Lee, Ju Hyung
    • KIEAE Journal
    • /
    • v.8 no.2
    • /
    • pp.79-86
    • /
    • 2008
  • A housing project is very sensitive the changing environment. Therefor, a housing project is the high risk. Therefor in order to be succeed the project it becomes necessary to effectively manage the risk involved in the process of the housing project. This study analysed the risk factors that involved in the process of the housing project as compared with the precede research. The results of this research are as follows : First, complete feasibility study and verification with conviction in market and environment are required. And, securing organization and specificity for simulation and variation of environment are required in the process by step. And then, complaint and flaw are required in the final stage. The results of this study can be used as the guideline to make the risk management system for the housing project.

A Study on Construction of Metro Rapid Transit Network in Daegu Area (철도와 지역발전 - 대구권 광역전철망 구상과 지역발전 효과)

  • Han, Keun-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.06b
    • /
    • pp.27-41
    • /
    • 2008
  • Construction of metro transportation infra is a large-scale project requiring tremendous financial resources. This study suggests operation method to use for rapid transit line existing infra such as Gyeongbu line and spare line capacity following second phase KTX construction. Reviewing various constraints of metro rapid transit operation, we found that the conditions for metro rapid transit operation are already satisfied in Daegu area, just like the case of Gyeongbu line in Seoul Metro area. Also, the evaluation of the economic feasibility of metro rapid transit operation in Daegu area shows that B/C is about 2.4, which implies that there is sufficient economic feasibility. According to the result of sensitivity analysis, the project is economically feasible unless the passenger demand decreases 15% and construction costs increases more than 70%. B/C is evaluated large because the utilization of already exiting infra lowers the initial cost. As one of mass transportation system of large capacity, metro rapid transit can generate significant spillover effect: It will strengthen competitiveness of metro area by connecting cities within the area and by extending one-day life zone of the area, to say nothing of the benefit of improving traffic condition. The construction of metro rapid transit network is necessary for the mass transportation system of Yeongnam area as well as Daegu area, and it may work as a starting point for uniting Daegu and Gyeongbuk and strengthening regional competitiveness.

  • PDF

A Basic Study on Optimal Price Estimation Model Development of Residential Officetel Project (주거용 오피스텔의 최적 분양가 산정 모델 개발 연구)

  • Jeon, Sang-Sub;Jang, Jun-Ho;Ha, Sun-Geun;Lee, Joo-Hyeong;Son, Ki-Young;Son, Seung-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.124-125
    • /
    • 2018
  • Recently, risk analysis studies regarding the architecture development project have been carried out by applying probabilistic method. However, it had a limit that this studies was conducted in only an apartment. Therefore, the objective of this study is to develop an optimal price estimation model that can be utilized on residential officetel project by applying Monte Carlo simulation. To achieve the objective, first, the variables are selected affecting the feasibility of an officetel based on literature review. Second, causal loop diagram is constructed by arranging the relationship between variables, then the import and expense model is suggested. Third, to carry out optimized parcel price, the range limits are set for each variables then Monte Carlo simulation is performed. In the future, the developed model is expected to help decision-makers as a tool to determine both risk and feasibility of the officetel development project.

  • PDF

Designing Study on Techno-Economic Assessment of Solar Photovoltaic Mini-Grid Project in Nepal

  • Poudel, Prasis;Bae, Sang-Hyun;Jang, Bongseog
    • Journal of Integrative Natural Science
    • /
    • v.15 no.2
    • /
    • pp.89-97
    • /
    • 2022
  • This paper presents the comprehensive feasibility study of solar mini-grid project located in Bajhang District, Sudur Paschim Province, Nepal. The study has been conducted with the aim of developing a suitable size solar mini-grid system to meet electricity demand of proposed settlements of the village people. The study forecasts that the estimated average daily peak power consumption of load is about 20kW and average daily energy demand of load is about 100-150kWh/day in the base year 2022. The shared ratio of productive end uses is about 25% of the total power consumption and about 27% of the total energy demand, which will be used for small business/income generation activities and required 45kWp size solar power generation mini-grid system. The estimated project cost for the proposed 45kW solar mini-grid system technology, including 3 years of operation & maintenance, as well as power distribution network up to end user's premises is about 0.24 million USD. It is concluded that 45kWp photovoltaic mini-grid is feasible for the location.