• Title/Summary/Keyword: IT Project Feasibility

Search Result 388, Processing Time 0.029 seconds

Development of a Framework for Estimating the Benefits of IT Projects : Focusing on Preliminary Feasibility Study (정보화 사업의 편익 추정 프레임워크 개발 : 정보화부문 예비타당성조사를 중심으로)

  • Lee, Chunghun
    • Journal of Information Technology Services
    • /
    • v.17 no.3
    • /
    • pp.101-115
    • /
    • 2018
  • In order to promote the IT business efficiently, the Preliminary Feasibility Study has been conducted since 2004. It is to verify the feasibility of a large-scale IT project in advance and to determine whether to reflect the budget. It is more difficult to analyze the benefits of the IT project than other projects, because the IT project is carried out by combining tangible and intangible assets and human resources. For this reason, the Standard Guideline for Preliminary Feasibility Study in the IT field suggests a framework to support in estimating the benefits of the IT project. However, it includes the following problems : 1) level discrepancy among the benefit categories, 2) lack of types of benefit items, 3) no consideration of benefit inducing factors. So the framework is facing a low utilization. This study develops a new framework through a three-step research process. The new framework can be used not only for preliminary feasibility studies but also for estimating the benefits of general IT projects.

Integration of the Feasibility Assessment Procedure and EIA of the Big Public Investment Project : In the Case of the Saemangeum Reclamation Project (대규모 공공투자사업의 경제적 타당성 평가와 환경영향평가 통압 방안 - 새만금 간척사업을 사례로 -)

  • Choi, Mi-Hee
    • Journal of Environmental Impact Assessment
    • /
    • v.11 no.2
    • /
    • pp.93-107
    • /
    • 2002
  • The choice of big public investment project needs an appropriate feasibility analysis before it is implemented, bemuse a rot wisely chosen one would bring about big and longrun societal costs. But the feasibility analysis for the big public investment project in Korea has been done without linking the economic benefits and environmental damages. Consequently social conflicts arose frequently during and after project implementation, owing to such concerns asincreasing costs and serious ecological damages. The recent social conflict over the Saemangeum Project is a typical case. This reclamation project began in 1991 and finished 60% of the whole process in 1999, when its feasibility was again assessed under the public pressure by the joint assessment team consisting of both citizen's and government's professionals. Even the assessment report by this joint team could not show the convincing results owing to the improper assessment procedure and failure to set proper feasibility criteria. This paper pointed out the limitations of our current procedure of feasibility assessment and identified the concrete problems that atosee during the recent reassessment process of the Saemangeum reclamation project by the joint team. In order to improve the current problem-ridden practices, it is concluded by the policy recommendation for establishing a right feasibility assessment procedure for the public investment projects.

A Study Factor of the Feasibility Analysis in Urban Redevelopment Project (도심재개발사업의 타당성 분석 요인에 관한 연구)

  • Joo Jae-Young;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.347-352
    • /
    • 2001
  • Midtown redevelopment project is intended for restoration of city's declining function and promoting the utilization of land, but several factors such as participants of different nature in the project, different expectation level from them, high land value accompanied by geographical location as a city and the demand for high density development, nature of business that requires long duration to complete and vast amount of fund contribute to complication of feasibility study. Due to these characteristics of midtown redevelopment project, consideration of various factors involved with it and reliable analysis are required but suggested complication of feasibility study is causing halt in project, preventing from launching it and delaying it. So, this study was undertaken to be a help to feasibility study of midtown redevelopment project by suggesting main elements that need to be dealt with analysing questionnaire survey result attained from related expert in this area and arranging total 45 factors essential to feasibility study for midtown redevelopment project that can be classified into 5 main category such as economic/financial factors, legal/institutional factors, market related factors, technical factors and conflict related factors through documental investigation, case study and interview with specialist concerned.

  • PDF

A Study on the Feasibility Analysis of Large Scale Research Project (대규모 연구 프로젝트 타당성 분석에 관한 연구)

  • Lee, Hong-Cheol;Hwang, In-Ju;Kim, Tae-Hyung
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.334-339
    • /
    • 2008
  • Nowadays national research and development fund is continuously increased. And the evaluation on the feasibility of R&D budget investment was carried out. Through this study it was possible that a business feasibility evaluation of large scale research project. Also the benefit of research project about large scale plant(A plant) is $2.67{\sim}3.76$ times of research funds, and the R&D fund pay-back period is $6{\sim}8$ years. And also there is employment effect as $1,200{\sim}2,200$ every year, and $22,000{\sim}35,000$ within 20 years after research project.

  • PDF

A financial feasibility analysis of architectural development projects that use probabilistic simulation analysis method (확률론적 시뮬레이션 분석방법을 적용한 건축개발사업의 재무적 타당성 분석)

  • Lee, Seong-Soo;Choi, Hee-Bok;Kang, Kyung-In
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.76-86
    • /
    • 2007
  • Construction development work invents profit as those finalize object, and a make or break success of project depends on correct analysis and forecast business feasibility at project early. Business feasibility study would be decision-making under precarious situation because is connoting uncertainty that is future. estimate at present visual point essentially. Under uncertainty, a decision-making method is based on probability theory of statistics, but business feasibility study had applied with not feasibility study by probabilistic decision method but it by determinism derision method so far. Therefore in this study doing decision-making by a probability theory method for successful project at early business feasibility study, it present a probabilistic study method that use simulation that can supply a little more correct and reliable data to decision-maker As result, a probabilistic study method is more suitable than deterministic study method as technique for a financial feasibility study of construction development work. Making good use of this probabilistic study method at important business or careful decision-making, because efficient Judgment that is based accuracy and authoritativeness may become available.

A Feasibility Study of the Construction Project in Pre-Design Phase (건설 프로젝트의 사업타당성 분석에 관한 연구)

  • 노병옥;이상범;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.109-113
    • /
    • 2002
  • Urban public service is goods and activities which satisfy public demands for the political, social, economic, cultural activity and household affairs of individual or groups and which urban government supply with free of charge. In view of government, in addition to fairness of facilities location, location of such facilities are to be determined the respect to cost of locating facilities and developmental direction in the future. Therefore, it is necessary to study on feasibility. A feasibility study Is an effective tool in determining the decision of investment or not and the level of investment priority on Projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected four and two by consideration of facilities distribution and connection with others. Six proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. The finally, it is to study on economical efficiency. Net Present Value was came out ₩4.4billion by 20years and Inter Rate of Return showed up 11%. in addition, it offer various benefit by public facilities. In conclusion, this project is reasonable.

  • PDF

Analysis of Factors Affecting Economic Feasibility of Long-term Public Rental Housing Reconstruction Project

  • Joe, Won Goog;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • v.24 no.3
    • /
    • pp.85-91
    • /
    • 2022
  • The public rental housing policy aims to provide the housing to the vulnerable class who do not have enough credit to own houses. The Korean government introduced new policies for housing supply to improve the availability of new houses. However, it is difficult to expand the supply because of the accumulated deficit of public rental housing. In this study, the economic feasibility of long-term public rental housing reconstruction projects was examined to ensure the economic and sustainable growth of public rental housing. The research found that the compensation for the accumulated deficit is needed. Also the research analyzed and identified the factors affecting the economic feasibility of reconstruction projects. The significant factors identified in this research are: the supply price of pre-sale/rental housing in the reconstruction project, total cost of the reconstruction project, and total floor area of the reconstruction project. According to the analysis results, it is necessary to increase the rent of existing long-term public rental housing, expand the government subsidy, increase the supply price of pre-sale/rental housing, and reduce the total project cost. However, there are limitations. For example, the fluctuations of construction market, residents' burden of housing costs, and the limit of the budget of the public housing authority. The increasing total Floor Area Ratio(FAR) limitation of the reconstruction project would be the realistic solution to the problem because it gives incentives to the reconstruction project.

Reclaiming Multifaceted Financial Risk Information from Correlated Cash Flows under Uncertainty

  • Byung-Cheol Kim;Euysup Shim;Seong Jin Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.602-607
    • /
    • 2013
  • Financial risks associated with capital investments are often measured with different feasibility indicators such as the net present value (NPV), the internal rate of return (IRR), the payback period (PBP), and the benefit-cost ratio (BCR). This paper aims at demonstrating practical applications of probabilistic feasibility analysis techniques for an integrated feasibility evaluation of the IRR and PBP. The IRR and PBP are concurrently analyzed in order to measure the profitability and liquidity, respectively, of a cash flow. The cash flow data of a real wind turbine project is used in the study. The presented approach consists of two phases. First, two newly reported analysis techniques are used to carry out a series of what-if analyses for the IRR and PBP. Second, the relationship between the IRR and PBP is identified using Monte Carlo simulation. The results demonstrate that the integrated feasibility evaluation of stochastic cash flows becomes a more viable option with the aide of newly developed probabilistic analysis techniques. It is also shown that the relationship between the IRR and PBP for the wind turbine project can be used as a predictive model for the actual IRR at the end of the service life based on the actual PBP of the project early in the service life.

  • PDF

A Study on the Evaluation Criteria for Feasibility Analysis of Apartment House Development Project (공동주택 개발사업 타당성 평가항목에 관한 연구)

  • Hong, Ju-Hyun;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.102-113
    • /
    • 2009
  • When planning and promoting apartment house development project, it is very important to carry on profitability in planning stage through realistic evaluation and analysis about distributability. Especially, the analysis about project feasibility through forecasting the early distribute rate is crucial stage because it could evaluate overall expecting benefit and feasibility of the project. However, researches and studies related with forecasting profitability and distributabilty of construction development project are insufficient. Also there is a big gap of the standard for evaluating early distribute rate between government and individual corporations. So it is necessary to study about the evaluating early distribute rate. In this point, this study aims to present effective evaluating standard(criteria) which is for forecasting profitability and distribute rate through analyzing various factors and weight of apartment house development projects. This study compared and analyzed examples of the real initial rate of private apartment sale based on the government estimated standard. Among estimated index, omitted items and factors to be additionally considered are combined as 33 detail appraisal contents of 4 parts 9 items by allotting them based on the data about priority of all considered factors.

A Study on the Method of the Project for Feasibility Study to Practical Use Urban Transit Maglev Based on System Engineering (시스템 엔지니어링에 기초한 도시형 자기부상열차 실용화 타당성 조사 사업의 수행방법 연구)

  • Jeong, Gyeong-Ryeol;Yun, Se-Gyun;Park, Cheol-Ho
    • Proceedings of the KSR Conference
    • /
    • 2006.05a
    • /
    • pp.47-59
    • /
    • 2006
  • This study is about a feasibility study for the practical using Urban Transit Maglev system based on systems engineering. First of all we defined what phase is matched with the project for feasibility study in the system life cycle and identified tasks that shall be done in the phase. Finally we suggested how to do in this project. The Urban Transit Maglev system is not wholly new system. It has similar architecture to a legacy urban railway system. But it is the system that is partially introduced new technology, because there are many projects have this characteristic within the country, we expect that this study may provide references.

  • PDF