• Title/Summary/Keyword: IT Operation Cost

Search Result 1,944, Processing Time 0.025 seconds

A Road Luminance Measurement Application based on Android (안드로이드 기반의 도로 밝기 측정 어플리케이션 구현)

  • Choi, Young-Hwan;Kim, Hongrae;Hong, Min
    • Journal of Internet Computing and Services
    • /
    • v.16 no.2
    • /
    • pp.49-55
    • /
    • 2015
  • According to the statistics of traffic accidents over recent 5 years, traffic accidents during the night times happened more than the day times. There are various causes to occur traffic accidents and the one of the major causes is inappropriate or missing street lights that make driver's sight confused and causes the traffic accidents. In this paper, with smartphones, we designed and implemented a lane luminance measurement application which stores the information of driver's location, driving, and lane luminance into database in real time to figure out the inappropriate street light facilities and the area that does not have any street lights. This application is implemented under Native C/C++ environment using android NDK and it improves the operation speed than code written in Java or other languages. To measure the luminance of road, the input image with RGB color space is converted to image with YCbCr color space and Y value returns the luminance of road. The application detects the road lane and calculates the road lane luminance into the database sever. Also this application receives the road video image using smart phone's camera and improves the computational cost by allocating the ROI(Region of interest) of input images. The ROI of image is converted to Grayscale image and then applied the canny edge detector to extract the outline of lanes. After that, we applied hough line transform method to achieve the candidated lane group. The both sides of lane is selected by lane detection algorithm that utilizes the gradient of candidated lanes. When the both lanes of road are detected, we set up a triangle area with a height 20 pixels down from intersection of lanes and the luminance of road is estimated from this triangle area. Y value is calculated from the extracted each R, G, B value of pixels in the triangle. The average Y value of pixels is ranged between from 0 to 100 value to inform a luminance of road and each pixel values are represented with color between black and green. We store car location using smartphone's GPS sensor into the database server after analyzing the road lane video image with luminance of road about 60 meters ahead by wireless communication every 10 minutes. We expect that those collected road luminance information can warn drivers about safe driving or effectively improve the renovation plans of road luminance management.

Effect of Coolant on PEMFC Performance in Low Humidification Condition (저가습 조건에서 냉각 유체의 고분자전해질 연료전지에 대한 영향)

  • Lee, Hung-Joo;Song, Hyun-Do;Kwon, Jun-Taek;Kim, Jun-Bom
    • Journal of the Korean Electrochemical Society
    • /
    • v.10 no.1
    • /
    • pp.25-30
    • /
    • 2007
  • Proton exchange membrane fuel cell(PEMFC) performance could be affected by various factors such as cell temperature, total pressure, partial pressure of reactants and relative humidity. Hydrogen ion is combined with water to form hydronium ion [$H_3O^+$] and pass through membrane resulting electricity generation. Cooling system is needed to remove heat and other uses on large scale fuel cell. In case that collant conductivity is increased, fuel cell performance could be decreased because produced electricity could be leaked through coolant. In this study, triple distilled water(TDW) and antifreeze solution containing ethylene glycol was used to observe resistance change. Resistance of TDW was taken 28 days to reach preset value, and effect on fuel cell operation was not observed. Resistance of antifreeze solution was not reached to preset value up to 48 days, but performance failure occurred presumably caused by bipolar plate junction resulting stoppage resistance experiment. Generally PEMFC humidification is performed near-saturated operating conditions at various temperatures and pressures, but non-humidifying condition could be applied in small scale fuel cell to improve efficiency and reduce system cost. However, it was difficult to operate large scale fuel cell without humidifying, especially higher than $50{\sim}60^{\circ}C$. In case of small flux such as 0.78 L/min, temperature difference between inlet and outlet was occurred larger than other cases resulting performance decrease. Non-humidifying performance experiments were done at various cell temperature. When both of anode and cathode humidification were removed, cell performance was strongly depended on cell operating temperature.

A Study on the Fabrication and Comparison of the Phantom for CT Dose Measurements Using 3D Printer (3D프린터를 이용한 CT 선량측정 팬텀 제작 및 비교에 관한 연구)

  • Yoon, Myeong-Seong;Kang, Seong-Hyeon;Hong, Soon-Min;Lee, Youngjin;Han, Dong-Koon
    • Journal of the Korean Society of Radiology
    • /
    • v.12 no.6
    • /
    • pp.737-743
    • /
    • 2018
  • Patient exposure dose exposure test, which is one of the items of accuracy control of Computed Tomography, conducts measurements every year based on the installation and operation of special medical equipment under Article 38 of the Medical Law, And keep records. The CT-Dose phantom used for dosimetry can accurately measure doses, but has the disadvantage of high price. Therefore, through this research, the existing CT - Dose phantom was similarly manufactured with a 3D printer and compared with the existing phantom to examine the usefulness. In order to produce the same phantom as the conventional CT-Dose phantom, a 3D printer of the FFF method is used by using a PLA filament, and in order to calculate the CTDIw value, Ion chambers were inserted into the central part and the central part, and measurements were made ten times each. Measurement results The CT-Dose phantom was measured at $30.44{\pm}0.31mGy$ in the periphery, $29.55{\pm}0.34mGy$ CTDIw value was measured at $30.14{\pm}0.30mGy$ in the center, and the phantom fabricated using the 3D printer was measured at the periphery $30.59{\pm}0.18mGy$, the central part was $29.01{\pm}0.04mGy$, and the CTDIw value was measured at $30.06{\pm}0.13mGy$. Analysis using the Mann - Whiteney U-test of the SPSS statistical program showed that there was a statistically significant difference in the result values in the central part, but statistically significant differences were observed between the peripheral part and CTDIw results I did not show. In conclusion, even in the CT-Dose phantom made with a 3D printer, we showed dose measurement performance like existing CT-Dose phantom and confirmed the possibility of low-cost phantom production using 3D printer through this research did it.

A Study on Major Safety Problems and Improvement Measures of Personal Mobility (개인형 이동장치의 안전 주요 문제점 및 개선방안 연구)

  • Kang, Seung Shik;Kang, Seong Kyung
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.1
    • /
    • pp.202-217
    • /
    • 2022
  • Purpose: The recent increased use of Personal Mobility (PM) has been accompanied by a rise in the annual number of accidents. Accordingly, the safety requirements for PM use are being strengthened, but the laws/systems, infrastructure, and management systems remain insufficient for fostering a safe environment. Therefore, this study comprehensively searches the main problems and improvement methods through a review of previous studies that are related to PM. Then the priorities according to the importance of the improvement methods are presented through the Delphi survey. Method: The research method is mainly composed of a literature study and an expert survey (Delphi survey). Prior research and improvement cases (local governments, government departments, companies, etc.) are reviewed to derive problems and improvements, and a problem/improvement classification table is created based on keywords. Based on the classification contents, an expert survey is conducted to derive a priority improvement plan. Result: The PM-related problems were in 'non-compliance with traffic laws, lack of knowledge, inexperienced operation, and lack of safety awareness' in relation to human factors, and 'device characteristics, road-drivable space, road facilities, parking facilities' in relation to physical factors. 'Management/supervision, product management, user management, education/training' as administrative factors and legal factors are divided into 'absence/sufficiency of law, confusion/duplication, reduced effectiveness'. Improvement tasks related to this include 'PM education/public relations, parking/return, road improvement, PM registration/management, insurance, safety standards, traffic standards, PM device safety, PM supplementary facilities, enforcement/management, dedicated organization, service providers, management system, and related laws/institutional improvement', and 42 detailed tasks are derived for these 14 core tasks. The results for the importance evaluation of detailed tasks show that the tasks with a high overall average for the evaluation items of cost, time, effect, urgency, and feasibility were 'strengthening crackdown/instruction activities, education publicity/campaign, truancy PM management, and clarification of traffic rules'. Conclusion: The PM market is experiencing gradual growth based on shared services and a safe environment for PM use must be ensured along with industrial revitalization. In this respect, this study seeks out the major problems and improvement plans related to PM from a comprehensive point of view and prioritizes the necessary improvement measures. Therefore, it can serve as a basis of data for future policy establishment. In the future, in-depth data supplementation will be required for each key improvement area for practical policy application.