• Title/Summary/Keyword: ISO/C224

Search Result 1, Processing Time 0.018 seconds

Development and Application of Performance Indicators to Estimate the Service Activities Relating with Water and Wastewater Works: Focus on Water Works Parts (상하수도 서비스 평가지표 개발 및 적용: 상수도 분야를 중심으로)

  • Choi, Tae-yong;Yoon, Yeo Cheon;Lee, Lan Jung;Kim, Duck-Jin;Jo, Jae Hong;Koo, Ja-yong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.20 no.3
    • /
    • pp.411-429
    • /
    • 2006
  • To improve Service quality for water and wastewater works, most water and wastewater utility effort to develop not only facility construction but also operation optimization. The operation is optimized by accurate estimation for ongoing situation. And from the accurate estimation, utility operator gain a information about their service quality and problems, So we developed a evaluation tool (Performance Indicators: PI) for service activity of water and wastewater works. The PI was developed in many countries and some international organizations (World Bank, IWA etc.) for service benchmarking. And ISO (international organization for standardization) just has been making a service standard for water and wastewater system (So called ISO/C224). This proceeding for making a service standard is ongoing now and will be launched in 2007. In our study, PI was composed of 6 parts (A human resource, facility management, operation, service quality, finance and environment). To evaluate water utilities, performance indicators for water was consisted of 100 items. Each 2 water utilities were estimated by this performance indicator. From the study, we just know that the performance indicator was a very useful tool to estimate utility service quality. And from the result, it is possible to know the strong and weak point of estimated utilities.