• Title/Summary/Keyword: ISLOCA

Search Result 2, Processing Time 0.014 seconds

Effect analysis of ISLOCA pathways on fission product release at Westinghouse 2-loop PWR using MELCOR

  • Kim, Seungwoo;Park, Yerim;Jin, Youngho;Kim, Dong Ha;Jae, Moosung
    • Nuclear Engineering and Technology
    • /
    • v.53 no.9
    • /
    • pp.2878-2887
    • /
    • 2021
  • As the amount of fission product released from ISLOCA was overestimated because of conservative assumptions in the past, several studies have been recently conducted to evaluate the actual release amount. Among several pathways for the ISLOCA, most studies were focused on the pathway with the highest possibility. However, different ISLOCA pathways may have different fission product release characteristics. In this study, fission product behavior was analyzed for various pathways at the Westinghouse two-loop plant using MELCOR. Four pathways are considered: the pipes from a cold leg, from a downcomer, from a hot leg to the outlet of RHR heat exchanger, and the pipe from the hot leg to the inlet of RHR pump (Pathway 1-4). According to the analysis results, cladding fails at around 2.5 h in Pathways 1 and 2, and on the other hand, about 3.3 h in Pathways 3 and 4 because the ISLOCA pathways affect the safety injection flow path. While the release amount of cesium and iodine ranges between 20 and 26% in Pathways 1 to 3, Pathway 4 allows only 5% to the environment because the break location is submerged. Also, as more than 90% of cesium released to the environment passes through the personnel door, reinforcing the pressure capacity of the doors would be a significant factor in the accident management of the ISLOCA.

An Improvement of Estimation Method of Source Term to the Environment for Interfacing System LOCA for Typical PWR Using MELCOR code

  • Han, Seok-Jung;Kim, Tae-Woon;Ahn, Kwang-Il
    • Journal of Radiation Protection and Research
    • /
    • v.42 no.2
    • /
    • pp.106-113
    • /
    • 2017
  • Background: Interfacing-system loss-of-coolant-accident (ISLOCA) has been identified as the most hazardous accident scenario in the typical PWR plants. The present study as an effort to improve the knowledge of the source term to the environment during ISLOCA focuses on an improvement of the estimation method. Materials and Methods: The improvement was performed to take into account an effect of broken pipeline and auxiliary building structures relevant to ISLOCA. An estimation of the source term to the environment was for the OPR-1000 plants by MELOCR code version 1.8.6. Results and Discussion: The key features of the source term showed that the massive amount of fission products departed from the beginning of core degradation to the vessel breach. Conclusion: The release amount of fission products may be affected by the broken pipeline and the auxiliary building structure associated with release pathway.