• Title/Summary/Keyword: ILS(Integrated Logistic Support)

Search Result 12, Processing Time 0.015 seconds

A Study on the Necessity of Verification about depot level maintenance plan through the Weapons System cases analysis (무기체계 사례 분석을 통한 창정비개발계획안 검증 필요성 연구)

  • Ahn, Jung-Jun;Kim, Su-Dong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.76-82
    • /
    • 2019
  • This study has done to search for a solution to remove risk limitedly caused by separating weapon system acquisition from operation and maintenance at the view point of Logistic Commander who's responsible for stable operation and maintenance after acquiring weapon system. At the System development stage, unverified overhaul development plan may cause additional manpower and costs after the development, and furthermore it is likely to have risk to lower reliability of the military. Thus, research and development agency should write overhaul development plan at the System development stage, and it should be verified through evaluation and verification test. Secondly, during research and development, institutional supplementation is needed to calculate human and material resources writing overhaul development plan. Thirdly, it should be able to analyze proper operation & maintenance plan and cost for overhaul plan at the pre-investigation stage. Fourthly, the base which can develop overhaul concept and overhaul factors should be included in the need and need determination document. Lastly, for the weapon system which has small amount of high power figure, project management should be performed to be able to specify at the each acquisition level of weapon system to realize Article 28, clause 3 and 4 of Defense business law.

A Comparative Study on the Reliability Growth Enhancement Activities Using "ANALYSIS" and "TEST" through FMECA and Highly Accelerated Life Tests (신뢰성 성장 강화를 위한 Analysis 방법(FMECA)과 Test(초가속수명시험-HALT) 비교 연구)

  • Shin, Sang-Hee;Jung, Joo-Hyun;Kang, Tae-Ho;Lee, Jong-Sin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.7
    • /
    • pp.406-418
    • /
    • 2020
  • When developing weapons systems, it is important to implement the functions and performance of equipment suitable for development purposes, but it is very important to ensure that the equipment is capable of operating without any vacuum with reliability after development. Therefore, various activities are carried out to enhance reliability of equipment. Reliability is enhanced by using high-specification parts in development, reliability verification through analysis, and testing using development prototypes to reinforce and improve the parts that are lacking in equipment. However, recently, development schedules are shortened due to rapidly changing external conditions and technologies, and there are cases where sufficient reliability growth activities were not carried out due to problems such as cost. Examples are projects that perform reliability activities only in analytical methods (reliability, FMECA). In this paper, analyzing and testing methods for analysis and testing were carried out on the same equipment through FMECA and super-accelerated life test, the contents of reliability growth activity were derived, the results of design change/review were accordingly compared, the differences between the two methods were analyzed, and measures were proposed to strengthen reliable growth activities. It was concluded that reliable growth activities through analysis from the beginning of development and reliable growth activities through testing should be carried out at the completion of initial prototype production.