• Title/Summary/Keyword: IF Steel Sheet

Search Result 42, Processing Time 0.021 seconds

Effects of Tape on Heat Transfer and Friction Factor in a Square Channel (사각 채널에 설치된 테이프가 열전달과 마찰계수에 미치는 효과)

  • Ahn, Soo-Whan;Kang, Ho-Keun;Bae, Sung-Taek;Putra, Ary Bachtiar Krishna
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.2402-2407
    • /
    • 2007
  • Heat transfer distributions and friction factors in square channels (3.5 ${\times}$ 3.5 cm) with twisted tape inserts and with twisted tape inserts plus interrupted ribs are respectively investigated. Tests are performed for Reynolds numbers ranging from 8,900 to 29,000. The rib height-to-channel hydraulic diameter, e/Dh, is kept at 0.057 and test section length-to-hydraulic diameter, L/Dh is 30. The twisted tape is 0.1 mm thick carbon steel sheet with diameter of 3.3cm, length of 90cm, and 2.5 turns. The square ribs are arranged to follow the trace of the twisted tape and along the flow direction defined as axial interrupted ribs. Each wall of the square channel is composed of isolated aluminum sections. The following conclusions from the experimental study were drawn as: 1) In the 4 heating wall channel with twisted tape inserts, Nusselt number based on bottom wall temperature is enhanced by 1.2 - 1.6 times if adding the axial interrupted ribs on the bottom wall only. 2) The twisted tape with interrupted ribs under the two-sided heating condition produces the highest heat transfer performance. 3) Friction factor data obtained for the square channel with twisted tape inserts plus axial interrupted ribs are less than those in the past publications for circular tubes with axial interrupted ribs and twisted tape inserts.

  • PDF

Research of Early-age Strength Development Technology for Remove the Steel Form of Large-wide Tunnel Lining Concrete (대단면 터널 라이닝 거푸집의 조기 제거를 위한 초기 강도 발현 기법 연구)

  • Kim, Kwang-Don;Lee, Deuk-Bok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.5
    • /
    • pp.116-127
    • /
    • 2014
  • The studies were carried out to process one cycle for a day to the large section tunnel lining concrete. Climatic characteristics of the tunnel inside are changed, when the temperature of the concrete placement is low, the mold remove time is increased that the heat of hydration speed be delayed because affects the strength development, to compensate for this, after installing the curing sheet on both sides of the steel form and installation of tunnel entrance, when it comes to providing the additional heat source of $28{\pm}2^{\circ}C$ therein, it was to be achieved early strength development control standards (4.5MPa) presented as a crack control scheme or more, thus, It was able to remove after age of 14hr from mold. On the other hand, under the conditions of $10{\pm}1^{\circ}C$ that a natural curing temperature in the tunnel, it was analyzed must ensure the curing time of 36hr or more after concrete placement. Throughout this study, the concrete strength development and the temperature in the early-age concrete, it can find that reverify the curing temperature is greatly affected, even concrete fly ash is mixed 10%, if it is possible to raise the surface temperature for a predetermined time, is not a problem in the early strength development.