The Transactions of the Korean Institute of Electrical Engineers P
/
v.57
no.1
/
pp.30-35
/
2008
In this paper, the application of power Quality monitoring based on Sampled Value(SV) which is introduced in the IEC61850 International Standard for substation communication are discussed. Firstly, while Merging Unit(MU) is designed as a process level device transmitting sensor data, the practical problems such as time delay compensation and optical fiber communication are encountered. Secondly, the Sampled Value message which is proper to a power quality monitoring system is presented. Because the power quality monitoring system requests less time-critical service compared to protection and control applications, the Sampled Value service message structure is introduced to improve efficiency. Lastly, the power quality monitoring server having various power quality analysis functions is suggested to verify the performance of Merging Unit With the diverse experiments, it is proved that the process bus distributed solution is flexible and economic for the power quality monitoring.
Cascading failure is the main cause of large blackouts in electrical power systems; this paper analyzes a cascading failure in Hanbit nuclear power plant unit two (2) caused by a circuit breaker (CB) operation failure. This malfunction has been expanded to the loss of offsite power (LOOP). In this study, current practices are reviewed and then the methodologies of how to prevent cascading failures in protection power systems are introduced. An overview on the implementation of IEC61850 GOOSE messaging-based zone selective interlocking (ZSI) scheme as key solution is proposed. In consideration of ZSI blocking time, all influencing factors such as circuit breaker opening time, relay I/O response time and messages travelling time in the communication network should be taken into account. The purpose of this paper is to elaborate on the effect of cascading failure in NPP electrical power protection system and propose preventive actions for this failures. Finally, the expected advantages and challenges are elaborated.
Son, Kyou Jung;Nam, Kyung-Deok;An, Gi Sung;Chang, Tae Gyu
Journal of IKEEE
/
v.24
no.1
/
pp.178-185
/
2020
This paper proposes precise time synchronization-based synchronized sampling structure applied HW/SW platform for LAN-based protection of future digital substations. The integrated software of the proposed platform includes IEC 61850 protocol, IEEE 1588 precision time protocol and synchronized sampling structure. The proposed platform expected to provide a basis of an application of future distributed sensing data-based protection and control methods by providing synchronized measurement among IEDs. The implementation of the proposed HW/SW platform technique was performed using TMDXIDK572 multi-core/multi-processor evaluation module and its time synchronization performance and synchronized sampling function were confirmed through the performance tests.
In order to verify a digital substation based on IEC 61850, KEPRI in charge of POWER IT project related to SAS has constructed IED conformance testing system, which consists of HMI, IED (Intelligent Electronic Device), network equipment, V/I generator, and performed the interoperability test between two IEDs made by other vendors. The test was proceeded based on SCL and with system integrated tools
KIPS Transactions on Computer and Communication Systems
/
v.10
no.7
/
pp.199-204
/
2021
Digital substation refers to a substation that digitizes functions and communication methods of power facilities such as monitoring, measuring, control, protection, and operation based on IEC 61850, an international standard for the purpose of intelligent power grids. Based on the intelligent operating system, efficient monitoring and control of power facilities is possible, and automatic recovery function and remote control are possible in the event of an accident, enabling rapid power failure recovery. With the development of digital technology and the expansion of the introduction of eco-friendly renewable energy and electric vehicles, the spread of direct current distribution systems is expected to expand. MVDC is a system that utilizes direct current lines with voltage levels and transmission capacities between HVDCs applied to conventional transmission systems and LVDCs from consumers. Converting existing lines in substations, where most power equipment is alternating current centric, to direct current lines will reduce transmission losses and ensure greater current capacity. The process bus of a digital substation is a communication network consisting of communication equipment such as Ethernet switches that connect installed devices between bay level and process level. For MVDC linkage to existing digital substations, the process level was divided into two buses: AC and DC, and a system that can be comprehensively managed in conjunction with diagnostic IEDs as well as surveillance and control was proposed.
In this paper, a fault section detection method is proposed for ungrounded system in the case of a single line-to-ground fault. A conventional method is used for faulted feeder selection according to the angular relationship between zero-sequence currents of the feeders and zero-sequence voltage of the system. Fault section detection is based on the comparison of phase angle of zero-sequence current. Proposed method has been testified in a demo system by Matlab/Simulink simulations. Based on Distribution Automation System(DAS), Feeder Remote Terminal Unit(FRTU) is used to collect those necessary data, at present a demo system is under developing using Manufacturing Message Specification (MMS) in IEC61850 standard.
As a general rule for evaluating dependability of a system, reliability is commonly considered which barely rays attention to the system behavior, however the estimation is based on the assumption of a fault-frost system, which may be impracticable and inaccurate especially for complicated system. This paper introduces a security and dependability integrated approach to analyze the availability of a fault-active system both from dependability and security points of view. Two fault modes involved are discussed about the impairment to the system reliance. The approach can be well applied to estimate and quantify the attribute of system robustness with the help of Markov chain process, which is good at solving status related problem. The comparison result between dual system and IEC61850-based almighty backup system is shown to sup-port the suggested approach.
In order to construct a digital substation based on IEC61850, All of the utility company should used IEDs to be verified and also vendors should get a certification from the international conformance testing organizationsuch as KEMA. So KEPRI in charge of POWER IT project related to SAS was required to IED conformance testing system, which can perform the test previously. The system, KEPCO developed, consists of HMI, IED (Intelligent Electronic Device), network equipment, V/I generator etc
The Transactions of the Korean Institute of Electrical Engineers P
/
v.64
no.4
/
pp.281-285
/
2015
Electrical energy supply interruption degrades reliability of power supply as well as social costs and economic loss. It is important to assess the reliability of the power system. Nowadays IEC61850 based substation automation system(SAS) has been developed for an updating of automation and interoperability. In this study, three kinds of reliability block diagram(RBD) were proposed to examine of network availability of the three types SAS. And reliability and unreliability of the SAS was formulated using the RBD. Finally, while varying the value of reliability and unreliability, the reliability and the unreliability of the overall system were evaluated.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.61
no.1
/
pp.23-28
/
2012
The market of domestic Power Plant Generator Protection and Control System (GPCS) is narrow and required the high reliability, and technology. So, it is still operated as turn-key. In recent years, digital relays has evolved into IED can perform the control and monitoring functions without central monitoring based on IEC61850 international standards communications, and attention for advancement of smart grid and ECMS has been increased in South Korea. The increasing attention on multi-function IED, DGPS(digital generator protection system), for internal fault protection of large generator results in starting a national project in South Korea, the IED prototype development for next-generation power units. The voltage restrained overcurrent relay have been used as back-up overcurrent protection for generators. In this paper, voltage restrained overcurrent relay is one of the back-up protective factors in generator protection IED was presented. For evaluation performance of the voltage restrained overcurrent relay, the data of ATPDraw5.7p4 modeling was used.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.