• Title/Summary/Keyword: IEAR(Interrupted Energy Assessment Rates)

Search Result 3, Processing Time 0.016 seconds

A Study on the Outage Cost Assessment by using Macro Approach (거시적인 접근방법을 통한 공급지장비 추정에 관한 연구)

  • Park, Young-Shin;Jeon, Dong-Hoon;Park, Jeong-Je;Oh, Tae-Gon;Cho, Kyeong-Hee;Choi, Jae-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.10
    • /
    • pp.1703-1711
    • /
    • 2010
  • Electric power utilities are facing increasing uncertainties regarding the economic, political, societal, environmental constraints under they operate and plan their future systems. The utilities have to integrate consumers' interruption cost representing reliability worth of electricity into the process of determining the optimum investment level. In order to do so, the estimated outage cost must be included into quantitative index corresponding to system capital and operation investment cost to establish an optimal expansion plan. This paper is a study on the outage cost assessment by using macro approach for calculating IEAR(Interrupted Energy Assessment Rates) and the TRELSS(Transmission Reliability Evaluation for Large-Scale Systems) program was used to calculate EENS(Expected Energy Not Served).

Web based Online Outage Cost Assessment and Information System of Electrical Energy (웹기반 온라인 전기에너지 공급지장비 추정 및 정보 시스템의 개발)

  • Lim, Jin-Taek;Choi, Jae-Seok;Jeon, Dong-Hoon;Seo, Chul-Soo;Lee, Jae-Gul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.9
    • /
    • pp.1249-1259
    • /
    • 2012
  • This paper proposes a Web Based Online Outage Cost Assessment and Information System(WOOCAIS) for power system outage cost assessment. The proposed WOOCAIS is a kind of web based survey method for outage cost assessment. While conventional survey methods have done outage cost assessment based on survey paper lists collected by post mail or visiting customers, the proposed WOOCAIS is a web based online survey operation and assessment system. Therefore, it can curtail expenditure for survey and also is more convenient than conventional method. It will be set up for actual outage cost assessment system of KEPCO in South Korea in the near future. The WOOCAIS will be applied in various research and actual planning and operation areas. First of all, the assessed results may be not only applied as one of objective function for generation system and grid expansion but also operational planning problems in power system.

Evaluation of IEAR(Interrupted Energy Assessment Rates) using Macro Approach in Korea (거시적방법에 의한 우리나라의 종합공급지장비단가 추정)

  • Park, Jeong-Je;Wu, Liang;Choi, Jae-Seok;Jung, Yong-Bum;Yoon, Yong-Bum
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.309-311
    • /
    • 2008
  • This paper introduces the characteristics of relationship between probabilistic reliability (LOLE; Loss of Load Expectation) and deterministic reliability (SRR; supply reserve rate) for 2008 year in Korea power system. Korea power system has been using the LOLE criterion to determine the adequacy of installed capacity (ICAP) requirement. The criterion is that load shall not exceed the avaliable capacity, on the average, more than five day in ten years. The probabilistic reliability evaluation and production cost simulation program which is called PPHFHT was used in order to obtain the relationship in this paper.