• 제목/요약/키워드: Hydrothermal heat pump

검색결과 107건 처리시간 0.021초

시뮬레이션을 통한 지열 히트펌프 시스템과 VRF 시스템의 에너지 성능비교 (Comparison of Energy Performance between Ground-Source Heat Pump System and Variable Refrigerant Flow(VRF) Systems using Simulation)

  • 손병후;임효재;강성재
    • 한국지열·수열에너지학회논문집
    • /
    • 제17권3호
    • /
    • pp.30-40
    • /
    • 2021
  • This paper compares the annual energy performance of four different types of air-conditioning systems in a medium-sized office building. Chiller and boiler, air-cooled VRF, ground-source VRF, and ground-source heat pump systems were selected as the systems to be compared. Specifically, the energy performance of the GSHP system and the ground-source VRF system were compared with each other and also with conventional HVAC systems including the chiller and boiler system and air-cooled VRF system. In order to evaluate and compare the energy performances of four systems for the office building, EnergyPlus, a whole-building energy simulation program, was used. The EnergyPlus simulation results show that both the GSHP and the ground-source VRF systems not only save more energy than the other two systems but also significantly reduce the electric peak demand. These make the GSHP and the VRF systems more desirable energy-efficient HVAC technologies for the utility companies and their clients. It is necessary to analyze the impact of partial load performance of ground-source heat pump and ground-source VRF on the long-term (more than 20 years) performance of ground heat exchangers and entire systems.

건물일체형 지열시스템의 동계 성능 모니터링 연구 (Performance Monitoring Study of Building Integrated Geothermal System in Winter)

  • 유형규;배상환
    • 한국지열·수열에너지학회논문집
    • /
    • 제6권1호
    • /
    • pp.23-28
    • /
    • 2010
  • The objective of this study is to develope ground heat exchanger using PHC pile used to building foundation, and it's element technology. So we made PHC piles into ground heat exchanger and evaluate it's performance. First, we studied PHC pile type, heat exchanger pipe, grouting materials, and present apartment house's foundation condition for PHC ground heat exchanger. As a result we designed BIGS(Building Integrated Geothermal System) prototype. Second, we applied BIGS to apartment houses' utility building in Osan built by Daelim. Third, we monitored heating performance of winter season. 1be result of heating performance was so good to apply to heat & cooling system in building.

냉방시스템의 운전조건에 따른 에너지 소비특성 연구 (The Characteristics of Energy Consumption with Operational Conditions for the Central Cooling System)

  • 박기태;안병천
    • 한국지열·수열에너지학회논문집
    • /
    • 제15권4호
    • /
    • pp.39-45
    • /
    • 2019
  • The operational conditions such as cooling tower water pump flow rate, cooling tower fan flow rate, and chiller capacity in heat source equipment, and supply air temperature and chilled water temperature in air conditioner are considered to study the effects on energy consumption for central cooling system by using TRNSYS program. As a result, the optimal values of supply air temperature and chilled water temperature for minimal total energy consumption are 12℃ and 8℃. And if maximum values of cooling tower water pump and fan flow rate is decreased from 100% to 40%, energy consumptions are increased 170MJ/day and 63.2MJ/day, respectively.

설계조건 변화에 따른 지중열교환기 길이 변화 연구 (Study on Capacity Alteration of Geothermal Heat Exchanger by Changing Design Condition)

  • 박종일;박경순
    • 한국지열·수열에너지학회논문집
    • /
    • 제9권4호
    • /
    • pp.9-14
    • /
    • 2013
  • A ground loop heat exchanger for the ground source heat pump system is the important equipment determining the thermal performance and initial cost of the system. The length and performance of the underground heat exchanger is dependent on ground thermal conductivity, operation hours, ground loop diameter, grout, ground loop arrangement, pipe placement and design temperature. In this study we find out heat exchanger length with various design factor.

설계변수가 수직밀폐형 지중열교환기 설계길이에 미치는 영향 (Effect of the Design Parameters of Geothermal Heat Exchanger Design Length)

  • 민경천;최재호
    • 한국지열·수열에너지학회논문집
    • /
    • 제7권2호
    • /
    • pp.10-15
    • /
    • 2011
  • A ground loop heat exchanger for the ground source heat pump system is the core equipment determining the thermal performance and initial cost of the system The length and performance of the heat exchanger is dependent on the ground thermal conductivity, the operation hours, the ground loop diameter, the grout, the ground loop arrangement, the pipe placement and the design temperature. The result of this simulation shows that higher thermal conductivity of grouting materials leads to the decrease length of geothermal heat exchanger from 100.0 to 84.4%.

벤토나이트 그라우트의 열물성 측정 및 열물성이 수직 지중열교환기 설계 길이에 미치는 영향 (Thermal Property Measurement of Bentonite-Based Grouts and Their Effects on Design Length of Vertical Ground Heat Exchanger)

  • 손병후
    • 한국지열·수열에너지학회논문집
    • /
    • 제15권2호
    • /
    • pp.1-9
    • /
    • 2019
  • In a ground-source heat pump (GSHP) system, a vertical ground heat exchanger (GHE) is widely accepted due to a higher thermal performance. In the vertical GHE, grout (also called grouting material) plays an important role in the heat transfer performance and the initial installation cost of the GHE. Bentonite-based grout has been used in practice because of its high swelling potential and low hydraulic conductivity. This study evaluated the thermo-physical properties of the bentonite-based grouts through lab-scale measurements. In addition, we conducted performance simulation to analyze the effect of mixed ratio of grouts on the design length and thermal performance of the vertical GHE. The simulation results show that thermally-enhanced grouts improve the heat transfer performance of the vertical GHE and thus reduce the design length of GHE pipe.

강관 토목구조물이 설치된 지열 히트펌프 시스템의 냉방 성능 평가 (Evaluation on Cooling Performance of Ground Source Heat Pump System Equipped with Steel-pipe Civil Structures)

  • 이석재;양정훈;최항석
    • 한국지열·수열에너지학회논문집
    • /
    • 제19권3호
    • /
    • pp.14-22
    • /
    • 2023
  • Steel-pipe civil structures, including steel-pipe energy piles and cast-in-place piles (CIPs), utilize steel pipes as their primary reinforcements. These steel pipes facilitate the circulation of a working fluid through their annular crosssection, enabling heat exchange with the surrounding ground formation. In this study, the cooling performance of a ground source heat pump (GSHP) system that incorporated steel-pipe civil structures was investigated to assess their applicability. First of all, the thermal performance test was conducted with steel-pipe CIPs to evaluate the average heat exchange amount. Subsequently, a GSHP system was designed and implemented within an office container, considering the various types of steel-pipe civil structures. During the performance evaluation tests, parameters such as the coefficient of performance (COP) and entering water temperature (EWT) were closely monitored. The outcomes indicated an average COP of 3.74 for the GSHP system and the EWT remained relatively stable throughout the tests. Consequently, the GSPH system demonstrated its capability to consistently provide a sufficient heat source, even during periods of high cooling thermal demand, by utilzing the steel-pipe civil structures.

열펌프, 데시칸트 및 증발식 냉각기를 조합한 하이브리드 냉방 시스템의 동특성 해석 연구 (Dynamic Simulation of a Hybrid Cooling System utilizing Heat Pump, Desiccant and Evaporative Cooler)

  • 서정남;김영일;정광섭
    • 한국지열·수열에너지학회논문집
    • /
    • 제7권1호
    • /
    • pp.45-50
    • /
    • 2011
  • Hybrid desiccant cooling system(HDCS) consists of desiccant rotor, regenerative evaporative cooler, heat pump and district heating hot water coil. In this study, TRNSYS and EES, dynamic and steady simulation programs were used for studying hybrid desiccant cooling system which is applied to an apartment house from June to August. The results show that power consumption of the hybrid desiccant cooling system is 70 kWh in June, 199 kWh in July and 241 kWh in August. Sensible and latent heats removed by the hybrid desiccant cooling system are 300 kWh, 301 kWh in June, 610 kWh, 858 kWh in July and 719 kWh, 1010 kWh in August. COP of the hybrid desiccant cooling system is 8.6 in June, 7.4 in July and 7.2 in August. COP of the hybrid desiccant cooling system decreases when latent heat load increases. Operation time of the system is 70 hours in June, 190 hours in July and 229 hours in August. Since the cooling load is largest in August, the operation time of August is longest for maintaining the indoor temperature at $26^{\circ}C$. Due to the characteristics of hybrid desiccant cooling system for efficiently handling both sensible and latent loads, this system can handle sensible and latent heat loads efficiently in summer.

대수층 축열 에너지(ATES) 시스템 모델에서 지하수 유동 영향에 의한 지반내 온도 분포 예측 시뮬레이션 (Simulation of thermal distribution with the effect of groundwater flow in an aquifer thermal energy storage (ATES) system model)

  • 심병완
    • 한국지열·수열에너지학회논문집
    • /
    • 제1권1호
    • /
    • pp.1-8
    • /
    • 2005
  • Aquifer Thermal Energy Storage (ATES) can be a cost-effective and renewable geothermal energy source, depending on site-specific and thermohydraulic conditions. To design an effective ATES system having the effect of groundwater movement, understanding of thermohydraulic processes is necessary. The heat transfer phenomena for an aquifer heat storage are simulated by using FEFLOW with the scenario of heat pump operation with pumping and waste water reinjection in a two layered confined aquifer model. Temperature distribution of the aquifer model is generated, and hydraulic heads and temperature variations are monitored at the both wells during 365 days. The average groundwater velocities are determined with two hydraulic gradient sets according to boundary conditions, and the effect of groundwater flow are shown at the generated thermal distributions of three different depth slices. The generated temperature contour lines at the hydraulic gradient of 0.001 are shaped circular, and the center is moved less than 5 m to the direction of groundwater flow in 365 days simulation period. However at the hydraulic gradient of 0.01, the contour center of the temperature are moved to the end of east boundary at each slice and the largest movement is at bottom slice. By the analysis of thermal interference data between two wells the efficiency of the heat pump system model is validated, and the variation of heads is monitored at injection, pumping and no operation mode.

  • PDF

사무용건물에서 지열히트펌프냉난방시스템의 운전성능 평가 (Performance for Geothermal Heating & Cooling System by Heatpump in Office Building)

  • 안형준;백성권;조정식;손병후
    • 한국지열·수열에너지학회논문집
    • /
    • 제3권1호
    • /
    • pp.23-29
    • /
    • 2007
  • For the perfomance test of geothermal system, a large pilot of capacity of 50RT is built and operated in office building. This system is planed hybrid system with cooling tower as asisstance heat sink. From October, 2004 to September, 2005, this system is operated andmonitored. As the result, COP of heating periods is about 3.46 and COP of cooling periods is about 4.1. Therefore, geothermal system is useful and suitable in Korea.

  • PDF