• Title/Summary/Keyword: Hydro power generator

Search Result 123, Processing Time 0.027 seconds

The Preventive measure and the cause analysis for field coils breaking away from the rotor in hydro generator (수차발전기 회전자 Coil 이탈 원인분석 및 방지대책)

  • Kim, Seung-Hyo;Moon, Hyung-Tae
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1021-1023
    • /
    • 2000
  • This paper presents the preventive measure and the cause for field coils breaking away from the rotor, which lately occurred when No.1 hydro generator was operating in Chung-Ju Dam No.2 Hydro Power Station. In findings, we ascertained the truth of contact between rotor rim and field coils, and think that field coils will break away from the rotor because of mechanical stress according as continuous operation after completion. 1985. Therefore, we conclude that the preventive measure for such a phenomenon is that stopper should be installed between rotor rim and field coils, and bolts should be tightened because of operating characteristic however there are not the design standards for installing stopper in generator rotor internationally.

  • PDF

Low-Load/Low-Eccentricity Performance Improvement Designs for Hydro Power Application of Cylindrical Turbine Guide Bearings - Introduction of Pad Leading-Edge Tapers (수력 원통형 터빈 가이드 베어링의 저부하/저편심 성능향상 설계 - 패드 선단 테이퍼의 도입)

  • Lee, An Sung;Jang, Sun-Yong
    • Tribology and Lubricants
    • /
    • v.33 no.2
    • /
    • pp.65-70
    • /
    • 2017
  • In vertical hydro/hydraulic power turbine-generator applications, traditionally, cylindrical turbine guide bearings (TGBs) are widely used to provide turbine runner shafts with smooth rotation guides and supports. All existing cylindrical TGBs with simple plain pads have drawbacks such as having no pressure generation and film stiffness at the no-load condition and in addition, at the low-load/low-eccentricity condition, having very low film stiffness values and lacking design credibility in the stiffness values themselves. In this paper, in order to fundamentally improve the low-load/low-eccentricity performance of conventional cylindrical TGBs and thus enhance their design-application availability and usefulness, we propose to introduce a rotation-directional leading-edge taper to each partitioned pad, i.e., a pad leading-edge taper. We perform a design analysis of lubrication performance on $4-Pad{\times}4-Row$ cylindrical TGBs to verify an engineering/technical usefulness of the proposed pad leading-edge taper. Analysis results show that by introducing the leading-edge taper to each pad of the cylindrical TGB one can expect a constant high average direct stiffness with a high degree of design credibility, regardless of load value, even at the low-load/low-eccentricity condition and also control the average direct stiffness value by exploring the taper height as a design parameter. Therefore, we conclude that the proposed pad leading-edge tapers are greatly effective in more accurately predicting and controlling rotordynamic characteristics of vertical hydro-power turbine-generator rotor-bearing systems to which cylindrical TGBs are applied.

A Study on Development of Signal Conditioner for Test of Automatic Control Equipments in Hydro Power Plant (수력발전소 자동제어설비 시험용 신호변환장치 개발에 관한 연구)

  • Byun, Doo-Gyoon;Chang, Moon-Soung;Kim, Ju-Hyeon
    • Proceedings of the KIEE Conference
    • /
    • 1995.11a
    • /
    • pp.169-171
    • /
    • 1995
  • Automatic control equipment in hydro power plant, such as turbine governor or automatic voltage regulator have to act promptly against for variation of power system, so it is necessary to check and test continuously. During last five years, the performance test of automatic control equipment was performed about 20 units of hydro turbine generator. In this process, because it has complex connection and before calibration, signal conditioner was developed as an auxiliary equipment for performance test. It includes function of signal amplifier, transducer, and meters. As a result of use this equipment for electric governor test at soyang-gang hydro power plant, it was possible to find output data equal to old one.

  • PDF

Analysis on a Bidding Strategy of the Hydro Generation in an Electricy Market (전력시장에서 수력발전기의 입찰전략 분석)

  • Shin, Jae-Hong;Lee, Kwang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.807-809
    • /
    • 2005
  • This paper addresses the bidding strategies of a hydro generator in an electricity market, and their effect on the electricity market in accordance with some parameters: the water volume, the demand elasticity, and the hydro unit performance. The competition of a hydro generator is formulated as a hi-level optimization problem, and the solving scheme for the equilibrium condition is proposed as a set of nonlinear simultaneous equations. The equilibrium of the oligopolistic model is evaluated by comparison with that of a perfect competition model from the viewpoint of a market power.

  • PDF

Analysis and Correction of Through-bolt End-region Overheating and Breakdown Failure in a Large Tubular Hydro-generator

  • Zhou, Zhi-ting;Fan, Zhen-nan;Li, Jian-fu;Wen, Kun;Zhang, Bide;Wang, Tao;Xia, Yan-kun;Sun, Zhang;Yao, Bing
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.6
    • /
    • pp.2292-2300
    • /
    • 2018
  • A field-circuit coupling model of a typical faulty generator is established to correct through-bolt end-region overheating and breakdown failure in a tubular hydro-generator. Using the model, eddy current loss and electromagnetic forces on through bolts under normal and failure conditions are analyzed and compared and the natural frequency of a through bolt is determined. Based on the analysis results, the causative mechanism of failure is revealed and targeted improvement design measures are proposed. The numerical results are found to be consistent with the actual fault characteristics, validating the design measure improvements. The results are useful in improving the design and manufacturing standards and enhancing the operational reliability of large tubular hydro-generators.

Performance Analysis of 10kW Class Propeller Hydro Turbine by the Change of Flow Rates and the Number of Runner Vane Using CFD (CFD를 이용한 10kW급 모델 실험용 프로펠러 수차의 유량 및 러너 베인 깃 수 변화에 따른 성능해석)

  • Park, Ji-Hoon;Kim, You-Taek;Cho, Yong;Kim, Byeong-Kon;Lee, Young-Ho
    • The KSFM Journal of Fluid Machinery
    • /
    • v.17 no.2
    • /
    • pp.5-11
    • /
    • 2014
  • Small hydro power, among other renewable energy resources, has been evaluated to have enough development value because it is a clean, renewable and abundant energy resource. In addition, small hydro power has the advantage of low cost development by using existing facilities like sewage treatment plants, water works and similar resources. But in the case of small hydro power systems, there are problems with degraded operation efficiency of turbine due to changes in flow rates. In order to overcome this, variable speed control can be achieved by using the power rectifier and permanent magnetic synchronous generator(PMSG) as a possible method to respond to the changes in flow rates. In this study, a commercial ANSYS CFD code was used to analyze the performance of 10kW class propeller hydro turbine and to also investigate flow characteristics at variable flow rates and runner vane.

Modeling and Fault Simulation of Hydro Generator Control System (수력 발전기 제어설비의 모델링과 사고 시뮬레이션)

  • Park, Chul-Won
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.4
    • /
    • pp.102-107
    • /
    • 2015
  • In this paper, the generator control system by using PSCAD/EMTDC was modeled and several faults simulation were performed. The generator control system is composed of generator, turbine, exciter and governor. The parameters of generator control system model were obtained from field power plant. And then, the various transient phenomena through obtained several signal of developed modeling were analyzed.

Analysis on Formation of Corrosion Products in Secondary Steam-Water System of Nuclear Power Plant (원자력발전소 2차측 습증기계통 주요지점별 부식 발생현황 분석)

  • Lee, Kyunghee;Han, Hoseok;Shin, Sungyong;Sung, Kibang;Rhee, Youngwoo
    • Corrosion Science and Technology
    • /
    • v.18 no.4
    • /
    • pp.138-147
    • /
    • 2019
  • Pipes and components of the secondary system in the pressurized water reactor (PWR) are mainly comprised of manufactured carbon steel. Thus, the generated carbon steel corrosion products are transported into the steam generator and deposited, thereby deteriorating the integrity of the steam generator. Environmental condition in the secondary system of the PWRs differs across different locations. So, the corrosion rate and types of corrosion products depend on specific locations in the secondary system. In this study, the quantity and chemical compositions of corrosion products generated in various locations that vary in different temperatures and chemistry conditions were investigated. As a result of evaluating the PWR "Unit A" that is in current operation, the amount of corrosion products generated in the section of high temperature feedwater system was identified as the largest source in the secondary system. Major components of corrosion products were iron oxides such as magnetite, hematite, and lepidocrocite.

Design of a Partial Inter-tube Lancing System actuated by hydraulic power for type F model Steam Generator in Nuclear Power Plant (수압구동 전열관다발 부분 삽입형 증기발생기 세정장비 설계)

  • Kim, S.T.;Jeong, T.W.
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.1132-1135
    • /
    • 2008
  • The sludge grown up in steam generators of nuclear power plants shortens the life-cycle of steam generators and reduces the output of power plants. So KHNP(Korea Hydro and Nuclear Power), the only nuclear power utility in Korea, removes it periodically using a steam generator lancing system during the outage of plants for an overhaul. KEPRI(Korea Electric Power Research Institute) has developed lancing systems with high pressured water nozzle for steam generators of nuclear power plants since 2001. In this paper, the design of a partial inter-tube lancing system for model F type steam generators will be described. The system is actuated without a DC motor inner steam generators because the motors in a steam generator make a trouble from high intensity of radioactivity as a break down.

  • PDF

Battery Energy Storage Based Voltage and Frequency Controller for Isolated Pico Hydro Systems

  • Singh, Bhim;Rajagopal, V.
    • Journal of Power Electronics
    • /
    • v.9 no.6
    • /
    • pp.874-883
    • /
    • 2009
  • This paper deals with an integrated voltage and frequency (VF) controller for isolated asynchronous generators (IAG) driven by a constant power pico-hydro uncontrolled turbine feeding three-phase four-wire loads. The proposed VF controller is used to control the frequency and voltage of an IAG with load leveling. Such a VF controller is also known as an integrated electronic load controller (IELC) which is realized using an isolated star/polygon transformer with a voltage source converter (VSC) and a battery at its DC bus. The proposed generating system with a VFC is modeled and simulated in MATLAB along with Simulink and Simpower system (SPS) toolboxes. The simulated results are presented to demonstrate the performance of an isolated asynchronous generator feeding three-phase four-wire loads with neutral current compensation.