• Title/Summary/Keyword: Hydraulic analysis model

Search Result 1,124, Processing Time 0.036 seconds

Digitalization of the Nuclear Steam Generator Level Control System (증기발생기 수위조절 시스템의 디지탈화)

  • Lee, Yoon-Joon;Lee, Un-Chul
    • Nuclear Engineering and Technology
    • /
    • v.25 no.1
    • /
    • pp.125-135
    • /
    • 1993
  • The safe and efficient operation of nuclear plants is recognized to be accomplished through the application of plant automation using digital technology, which is one of main targets of the next generation nuclear plants. For plant level automation, it is first required that each major subsystem be digitalized, and the steam generator water level control system is discussed in this study. The transfer functions between inputs and the level are derived by employing the thermal hydraulic model of the steam generator and are applied to the analysis of the current three-element control system. Since the control scheme in this study includes the steam generator itself as a process plant, the system order is high and the numerical instability arises in digitalizing. Together with this, the unreliability of the feedwater feedback signal at low power level leads to the proposal of a two-element control system with a proper digital controller. The digital PI controller developed for this system has the initial power adaptive gain and integration time constant. And it makes the overall system response satisfy the stability and other necessary control specifications simultaneously. Since the two-element control system using this controller depends on the initial power only, it is simple to define and it shows a similar level response behavior to that of its corresponding analog system.

  • PDF

Analysis of Bed Change Caused by Hydraulic Structure Using 2-D model (수공구조물에 따른 2차원 모형을 이용한 하상변동 분석)

  • Son, Ah-Long;Son, In-Ho;Han, Kun-Yeun;Kwon, Taek-Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.535-535
    • /
    • 2012
  • 하천 환경의 변화는 자연적으로 일어나기도 하지만, 우리나라 경우 대부분 하천 정비, 골재 채취, 수중보와 하구둑 등 하천시설물의 건설, 그리고 댐 및 교량건설 등 인위적인 요인에 의한 변화가 지배적이다 이렇게 환경이 변화하면 하천의 평형 상태는 파괴되며 하천의 평형 상태를 복원하는 과정에서 하천의 침식 또는 퇴적이 일어나며 이러한 과정의 총체적인 결과로서 하상변동이 일어나게 된다. 하상변동은 단기적인 면에서는 하천에서의 취수, 배수, 주운동 하천관리에 직접적인 영향을 주며, 장기적인 면에서는 하천시설물의 안정, 홍수위 및 지하수위 변화, 홍수터와 같은 하천부지의 변화 등 하천 및 유역 관리에 광범위한 영향을 주고 있다 하천의 유황 및 하상재료의 인위적인 변화에 의한 장기적인 하상변동 효과를 예측하고 분석하는 것은 하천계획 및 관리 면에서 매우 중요하다. 또한 하천 정비사업 등에 의한 영향을 제대로 평가하기 위해서는 비교적 단기간의 홍수 또는 호우 사상에 대한 단기적인 하상변동 효과를 정확하게 예측하는 것은 필수적이다. 외국에서는 하상변동 예측의 필요성을 일찍이 인식하여 다수의 하상변동 예측모형이 개발되어 하천 실무에 사용되고 있으며, 국내에서도 하천 흐름의 등수 역학적 해석을 위해 여러 가지 수치 기법들에 대한 연구가 진행되고 발전되어져 왔다. 현재 국내에서는 측량 자료이용과 모형적용의 용이성을 이유로 1차원 점변 부정류 해석프로그램인 HEC-RAS 모형을 많이 사용하고 있으며 대부분의 하천 정비 기본계획 수립에 있어서도 1차원 해석 모형을 적용하고 있는 실정이다. 국내에 서 수행된 하상변동 예측에 관한 연구들은 대부분 1차원 모형이므로 하천의 사행의 진행이나 유사의 횡방향 분포 등은 고려할 수 없다. 또한 하상변동 계산 시 이동상 부분의 전체가 균일하게 상승 또는 하향하는 것으로 가정하기 때문에 흐름이 급변하는 데 적용하는 것은 적합하지 않다. 따라서 본 연구에서는 4대강살리기 사업이 진행중인 낙동강유역 구미보지점을 대상으로 2차원 흐름 및 하상변동 수치모형인 CCHE2D 모형을 적용하여 50년, 100년, 200년 빈도별로 모의를 실시, 보설치 전 후의 하상변동을 비교 분석 하였다. 모의 결과 보설치 후의 경우 보 상류단은 전반적으로 퇴적의 양상을 보였으며, 보 하류단의 만곡부의 경우 홍수량이 증가함에 따라 유속 및 소류력이 비슷한 패턴으로 증가하여 침식이 관찰되었다. 특히 보 직하류의 경우 수문을 기준으로 다량의 침식이 있음을 보였으며, 침식이 계속 진행된다면 보유실과 같은 심각한 결과를 초래할 수 있기 때문에 침식을 방지 할 수 있는 다양한 장치가 마련되어야 할 것으로 판단된다.

  • PDF

Monitoring of Water Content and Electrical Conductivity in Paddy Soil Profile by Time Domain Reflectometry (Time Domain Reflectometry를 이용한 논토양 단면의 수분함량 및 전기전도도 모니터링)

  • Yoo, Sun-Ho;Han, Gwang Hyun;Bae, Byung-Sul;Park, Moo-Eon
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.32 no.4
    • /
    • pp.365-374
    • /
    • 1999
  • To obtain informations on vertical movements of water and solute in rice paddy field during the growing season, soil water contents and bulk electrical conductivities (${\sigma}_a$) were monitored using Time Domain Reflectometry. Soil water contents with depth showed ${\varepsilon}$-shaped profiles constituting of partly saturated zones at top and bottom layers and unsaturated zones (20-100cm) between them. Analysis by fitting with a van Genuchten-type model showed that soil water contents at 60cm were affected by both water supplied from surface water and groundwater, but at 80cm mainly affected by groundwater. Water percolation at the rate of 2cm $day^{-1}$ rates were, but large fluctuation from 10 to 38cm $day^{-1}$ in C1 layer (60-90cm). Therefore, it can be said that any water or solute entering C1 layer is very rapidly transported to C2 layer, especially during the period of high groundwater table staying, and retarded to a relatively constant percolation rate in C2 layer. This can be manifested by the fact that rapid decrease and steady increase of electrical conductivities at 50 and 110cm depth respectively, were found around that period.

  • PDF

Establishment of hydraulic/hydrological models in the Mekong pilot area using global satellite-based water resources data II - focusing on HEC-RTS/RAS model application (글로벌 위성기반 수자원 데이터 활용 메콩지역 수리/수문모델 시범 구축 II - HEC-RTS/RAS 모형 적용을 중심으로)

  • Cho, Younghyun;Noh, Joonwoo;Park, Sang Young;Park, Jin Hyeog
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.121-121
    • /
    • 2022
  • 한국과 미국은 2018년 8월에 발표한 메콩우호국(Friends of the Lower Mekong, FLM) "메콩지역 수자원 데이터 관리 및 정보공유 강화에 관한 공동성명"을 계기로 메콩유역의 실시간 수자원 변동 모니터링 및 분석과 수자원 데이터 공동활용 역량을 강화하여 효율적이고 과학적인 수자원관리 지원과 함께 한국의 신남방정책과 미국의 인도-태평양 전략 시너지효과를 극대화하고자 메콩 주변국 재해경감 및 수자원 데이터 활용 역량강화를 위한 글로벌 위성기반 수문자료의 생산·활용 및 홍수·가뭄 등의 수재해 분석기술을 개발하고 있다. 여기에는 한국 K-water의 물관리 기술과 미국 NASA, USACE의 위성활용 및 수자원분석 기술을 접목하여 메콩지역의 체계적인 물관리 및 재해로부터 안전성 확보 기여에 목표를 두고 연구를 진행 중에 있다. 본 연구에서는 전 세계적으로 광범위하게 활용되고 있는 미공병단(USACE, U.S. Army Corps of Engineers)의 HEC software 프로그램을 메콩 시범지역(pilot area)에 적용하여 수리/수문모델 구축을 진행하고 있다. 구축되는 모형은 유역 상류 댐의 연계 모의운영 및 하류 홍수분석이 동시 가능한 HEC-RTS(Real-Time Simulation)로 이는 HEC-HMS, -ResSim, -RAS와 -FIA 모형이 순차적으로 결합된 수리/수문 모델링 시스템이다. 모형의 시범적용 지역은 현지 메콩위원회(MRC, Mekong River Comission)의 의견 등을 반영, 메콩강 하류지역(Lower Mekong) 본류 유역에 위성자료 활용 및 준실시간(near real-time)으로 댐 모의운영 등을 고려할 수 있는 JingHong댐(중국 란창강 최하류)에서 라오스 Xayaburi댐(메콩강 최상류)까지의 구간을 선정하였으며, 전년도에는HEC-RTS 중 HMS(Hydrologic Modeling System) 모형 적용을 중심으로 가용한 위성자료(GPM IMERG)를 활용하여 과거 홍수사상에 대한 모의를 고려한 강우-유출모형의 구축을 완료하였다. 이에 연속하여 금년도에는 동일유역 내 하천 단면 등이 확보된 Chiang Saen 지점에서 Xayaburi 댐까지의 구간에 대해 RAS(River Analysis System)을 구축할 예정으로 구축된 RAS 모형은 HEC-RTS에 포함되어 메콩 시범지역의 종합적 수리/수문분석에 적용될 예정이다.

  • PDF

Preliminary Result of Lineament Analysis for the Potential Site Selection of HLW Geological Disposal (HLW 지층처분 광역 후보부지 선정을 위한 선형구조 예비 분석 결과)

  • Ko, Kyoungtae;Kihm, You Hong;Lee, Hong-Jin
    • Economic and Environmental Geology
    • /
    • v.51 no.2
    • /
    • pp.167-176
    • /
    • 2018
  • It is necessary to consider various geological parameters such as lithology, geological structure, earthquake, hydraulic geology, geochemistry, geological engineering, and geothermal in order to select potential sites for HLW(high-level radioactive waste) geological disposal. In particular, the geological lineament reflects the characteristics of various geological parameters and can be used as an important criterion for site selecting such as nuclear power plants and HLW repositories. In this paper, the Finnish lineament classification method for HLW disposal site selection through the lineament analysis was applied to the lineament data in the Korean peninsula. For this purpose, we used previous lineament data from the KIGAM(Korea Institute of Geoscience and Mineral Resources) and obtained new lineament data from the field geologists such as structural geologist, paleoseismologist, and geomorphologist. To ensure the reliability of the new lineament analysis data, we used high-resolution satellite images and hill-shade relief maps which were constructed by a digital elevation model. In the prevailing direction analysis from the acquired lineament data, the NNE-SSW direction was the most dominant, but the ENE-WSW and NNW-SSE directions also showed highly frequency depending on the experts. Applying the Finnish classification method, the geometrical development characteristics of the lineament corresponding to the Class 1 and 2 used for the wide-wide candidate site were compared. As a result of direction analysis for Class 1, the NNE-SSW direction was the most dominant and the WNW-ESE direction also showed a high frequency. In the case of Class 2, the NNE-SSW is the most prevalent and WNW-ESE or ENE-WSW direction also had highly frequency depending on the experts. Different lineament analysis results based on the same data are interpreted as a result of subjective experience and analytical criteria from the every experts. Therefore, it is necessary to establish integrated criteria and consider geophysical data for the publication of reliable nation-wide lineament map.

One-Dimensional Consolidation Simulation of Kaolinte using Geotechnical Online Testing Method (온라인 실험을 이용한 카올리나이트 점토의 일차원 압밀 시뮬레이션)

  • Kwon, Youngcheul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4C
    • /
    • pp.247-254
    • /
    • 2006
  • Online testing method is one of the numerical experiment methods using experimental information for a numerical analysis directly. The method has an advantage in that analysis can be conducted without using an idealized mechanical model, because mechanical properties are updated from element test for a numerical analysis in real time. The online testing method has mainly been used for the geotechnical seismic engineering, whose major target is sand. A testing method that may be applied to a consolidation problem has recently been developed and laboratory and field verifications have been tried. Although related research thus far has mainly used a method to update average reaction for a numerical analysis by positioning an element tests at the center of a consolidation layer, a weakness that accuracy of the analysis can be impaired as the thickness of the consolidation layer becomes more thicker has been pointed out regarding the method. To clarify the effectiveness and possible analysis scope of the online testing method in relation to the consolidation problem, we need to review the results by applying experiment conditions that may completely exclude such a factor. This research reviewed the results of the online consolidation test in terms of reproduction of the consolidation settlement and the dissipation of excess pore water pressure of a clay specimen by comparing the results of an online consolidation test and a separated-type consolidation test carried out under the same conditions. As a result, the online consolidation test reproduced the change of compressibility according effective stress of clay without a huge contradiction. In terms of the dissipation rate of excess pore water pressure, however, the online consolidation test was a little faster. In conclusion, experiment procedure needs to improve in a direction that hydraulic conductivity can be updated in real time so as to more precisely predict the dissipation of excess pore water pressure. Further research or improvement should be carried out with regard to the consolidation settlement after the end of the dissipation of excess pore water pressure.

The Comparison of Existing Synthetic Unit Hydrograph Method in Korea (국내 기존 합성단위도 방법의 비교)

  • Jeong, Seong-Won;Mun, Jang-Won
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.6
    • /
    • pp.659-672
    • /
    • 2001
  • Generally, design flood for a hydraulic structure is estimated using statistical analysis of runoff data. However, due to the lack of runoff data, it is difficult that the statistical method is applied for estimation of design flood. In this case, the synthetic unit hydrograph method is used generally and the models such as NYMO method, Snyder method, SCS method, and HYMO method have been widely used in Korea. In this study, these methods and KICT method, which is developed in year 2000, are compared and analyzed in 10 study areas. Firstly, peak flow and peak time of representative unit hydrograph and synthetic unit hydrograph in study area are compared, and secondly, the shape of unit hydrograph is compared using a root mean square error(RMSE). In Nakayasu method developed in Japan, synthetic unit hydrograph is very different from peak flow, peak time, and the shape of representative unit hydrograph, and KICT method(2000) is superior to others. Also, KICT method(2000) is superior to others in the aspects of using hydrologic and topographical data. Therefore, Nakayasu method is not a proper in hydrological practice. Moreover, it is considered that KICT model is a better method for the estimation of design flood. However, if other model, i.e. SCS method, Nakayasu method, and HYMO method, is used, parameters or regression equations must be adjusted by analysis of real data in Korea.

  • PDF

A study on the comparison by the methods of estimating the relaxation load of SEM-pile (SEM파일의 이완하중 산정방법별 이완하중량 비교 연구)

  • Kim, Hyeong-Gyu;Park, Eun-Hyung;Cho, Kook-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.543-560
    • /
    • 2018
  • With the increased development in downtown underground space facilities that vertically cross under a railway at a shallow depth, the demand for non-open cut method is increasing. However, most construction sites still adopt the pipe roof method, where medium and large diameter steel pipes are pressed in to form a roof, enabling excavation of the inside space. Among the many factors that influence the loosening region and loads that occur while pressing in steel pipes, the size of the pipe has the largest impact, and this factor may correspond to the magnitude of load applied to the underground structure inside the steel pipe roof. The super equilibrium method (SEM) has been developed to minimize ground disturbance and loosening load, and uses small diameter pipes of approximately 114 mm instead of conventional medium and large diameter pipes. This small diameter steel pipe is called an SEM pile. After SEM piles are pressed in and the grouting reinforcement is constructed, a crossing structure is pressed in by using a hydraulic jack without ground subsidence or heaving. The SEM pile, which plays the role of timbering, is a fore-poling pile of approximately 5 m length that prevents ground collapse and supports surface load during excavation of toe part. The loosening region should be adequately calculated to estimate the spacing and construction length of the piles and stiffness of members. In this paper, we conducted a comparative analysis of calculations of loosening load that occurs during the press-in of SEM pile to obtain an optimal design of SEM. We analyzed the influence of factors in main theoretical and empirical formulas applied for calculating loosening regions, and carried out FEM analysis to see an appropriate loosening load to the SEM pile. In order to estimate the soil loosening caused by actual SEM-pile indentation and excavation, a steel pipe indentation reduction model test was conducted. Soil subsidence and soil loosening were investigated quantitatively according to soil/steel pipe (H/D).

Computing the Dosage and Analysing the Effect of Optimal Rechlorination for Adequate Residual Chlorine in Water Distribution System (배.급수관망의 잔류염소 확보를 위한 적정 재염소 주입량 산정 및 효과분석)

  • Kim, Do-Hwan;Lee, Doo-Jin;Kim, Kyoung-Pil;Bae, Chul-Ho;Joo, Hye-Eun
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.32 no.10
    • /
    • pp.916-927
    • /
    • 2010
  • In general water treatment process, the disinfection process by chlorine is used to prevent water borne disease and microbial regrowth in water distribution system. Because chlorines were reacted with organic matter, carcinogens such as disinfection by-products (DBPs) were produced in drinking water. Therefore, a suitable injection of chlorine is need to decrease DBPs. Rechlorination in water pipelines or reservoirs are recently increased to secure the residual chlorine in the end of water pipelines. EPANET 2.0 developed by the U.S. Environmental Protection Agency (EPA) is used to compute the optimal chlorine injection in water treatment plant and to predict the dosage of rechlorination into water distribution system. The bulk decay constant ($k_{bulk}$) was drawn by bottle test and the wall decay constant ($k_{wall}$) was derived from using systermatic analysis method for water quality modeling in target region. In order to predict water quality based on hydraulic analysis model, residual chlorine concentration was forecasted in water distribution system. The formation of DBPs such as trihalomethanes (THMs) was verified with chlorine dosage in lab-scale test. The bulk decay constant ($k_{bulk}$) was rapidly decreased with increasing temperature in the early time. In the case of 25 degrees celsius, the bulk decay constant ($k_{bulk}$) decreased over half after 25 hours later. In this study, there were able to calculate about optimal rechlorine dosage and select on profitable sites in the network map.

Water Digital Twin for High-tech Electronics Industrial Wastewater Treatment System (II): e-ASM Calibration, Effluent Prediction, Process selection, and Design (첨단 전자산업 폐수처리시설의 Water Digital Twin(II): e-ASM 모델 보정, 수질 예측, 공정 선택과 설계)

  • Heo, SungKu;Jeong, Chanhyeok;Lee, Nahui;Shim, Yerim;Woo, TaeYong;Kim, JeongIn;Yoo, ChangKyoo
    • Clean Technology
    • /
    • v.28 no.1
    • /
    • pp.79-93
    • /
    • 2022
  • In this study, an electronics industrial wastewater activated sludge model (e-ASM) to be used as a Water Digital Twin was calibrated based on real high-tech electronics industrial wastewater treatment measurements from lab-scale and pilot-scale reactors, and examined for its treatment performance, effluent quality prediction, and optimal process selection. For specialized modeling of a high-tech electronics industrial wastewater treatment system, the kinetic parameters of the e-ASM were identified by a sensitivity analysis and calibrated by the multiple response surface method (MRS). The calibrated e-ASM showed a high compatibility of more than 90% with the experimental data from the lab-scale and pilot-scale processes. Four electronics industrial wastewater treatment processes-MLE, A2/O, 4-stage MLE-MBR, and Bardenpo-MBR-were implemented with the proposed Water Digital Twin to compare their removal efficiencies according to various electronics industrial wastewater characteristics. Bardenpo-MBR stably removed more than 90% of the chemical oxygen demand (COD) and showed the highest nitrogen removal efficiency. Furthermore, a high concentration of 1,800 mg L-1 T MAH influent could be 98% removed when the HRT of the Bardenpho-MBR process was more than 3 days. Hence, it is expected that the e-ASM in this study can be used as a Water Digital Twin platform with high compatibility in a variety of situations, including plant optimization, Water AI, and the selection of best available technology (BAT) for a sustainable high-tech electronics industry.