• Title/Summary/Keyword: House Distribution

Search Result 437, Processing Time 0.035 seconds

Indoor And Outdoor Noise Distribution in Apartment House for Each Story (공동주택의 내.외부에 따른 층별 소음분포)

  • Park, Cheol-Yong;Hong, Goo-Pyo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.1-4
    • /
    • 2006
  • Most apartment houses were sited in road because it was convenient for transportation. One of the most noise is traffic noise at apartment house. The tested site was closely located in rail road and installed soundproofing wall. This study is measured indoor and outdoor noise distribution in apartment house for each story. It was similar noise distribution at indoor test but it was different noise distribution at outdoor test for each story. It was measured higher noise level at the upper stories than 5th story in outdoor noise distribution.

  • PDF

Seasonal Distribution and Correlation of the Relative Humidity for Korean Traditional Houses in Northern Part of Gyeong-Buk - Distribution of the Relative Humidity for Anmadang, Maru and Outdoor Point in 'ㅁ' Shaped House - (경북 북부지방 한옥의 계절별 상대습도 분포 및 상관도에 관한 연구 - 'ㅁ'자형 구조에서 안마당, 마루와 외기와의 분포를 중심으로 -)

  • 박현장;이주동;공성훈;이중우
    • Journal of the Korean housing association
    • /
    • v.14 no.2
    • /
    • pp.101-107
    • /
    • 2003

Regional Electricity Planning Using Open Source-Based Optimization Model (오픈 소스 최적화모형을 이용한 지역단위 전력계획)

  • Chung, Yong Joo
    • The Journal of Information Systems
    • /
    • v.28 no.1
    • /
    • pp.133-153
    • /
    • 2019
  • Purpose The purpose of this study is to design a regional electricity planning model rather than the existing single region ones and verify its usefulness. The regional electricity planning model is to determine both electricity distribution among regions and power plant planning at the same time satisfying regional demands and distribution networks. Design/methodology/approach This study made a regional electricity planning model by integrating power plant planning and electricity distribution among regions. The regional electricity planning model is formulated into a linear programming problem, and coded and run using the OSeMOSYS, one of open source energy systems. Findings According to the empirical analysis result, this study confirmed that the regional electricity planning model proposed in this study deducts the unfairness among regions in view of electricity and green house gas. In addition, the model is expected to be used in evaluating and developing the national policies concerning fine dust and/or green house gas.

Effects of the Distance between Houses on the Wind Force Coefficients on the Single-span Arched House (아치형 단동하우스의 동간거리가 풍력계수에 미치는 영향)

  • 이현우;이석건
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.35 no.4
    • /
    • pp.76-85
    • /
    • 1993
  • The purpose of this study was to analyze the wind force distribution on the two single-span arched plastic house depending upon the house spacing and wind direction, which may provide the fundamental criteria for the structural design. In order to specify the wind force distribution, the variation of the wind force coefficients, the mean wind force coefficients and the drag force coefficients were estimated from the wind tunnel test data. The results obtained are as follows : 1. At the wind direction of 90$^{\circ}$, there was a typical span interval at which the maximum negative pressure was occured at the edge of the inside walls. 2. In the consideration of wind loads, the wind force coefficients estimated from independent single-span arched plastic house should not be directly applied to the structural design on the double houses separated. 3. The average maximum negative wind force on the inside walls was occured at the wind direction of 90$^{\circ}$, and the variations depending on the span intervals was not significant. 4. The average maximum drag force was occured at the wind direction of 300, and the magnitude of drag force was more significant at the first house. As the distance between two houses was increased, the drag force was slightly increased for every wind direction.

  • PDF

Security Monitoring System for Apartment House Building Using Paver Line Carrier (전력선 통신을 이용한 집단주택 안전관리 시스템)

  • Kim, In-Soo;Kim, Kwan-Ho;Kim, Yo-Hee
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.476-478
    • /
    • 1993
  • Instead of installing new communication wiring to each house in the apartment house building. the power distribution network. which is already installed in the building. can be use as communication medium. In a safty management, by adoption of power line communication system, at remote we can monitor safty related sensors such as fire, gas leakage, burglar intrusion and emergency call which are located at each house. From this viewpoint, we developed security monitoring system for apartment house building using power lines. Security monitoring system consists of Power Line Communication-Sub Controller (PLC-SC). Power Line Communication-Main Controller (PLC-MC) and Management System (MS). Between a PLC-MC and a PLC-SC, the transmission rate is 1200 bps in power lines and modulation technique is frequency shirt keying (FSK). In between a PLC-MC and a MS, the transmission rate is 1200 bps in communication line (RS-485). As a result of this research. transmission loss is 0.1dB per meter of intrabuilding distribution network. Transmission can be reach in 250 meters. So it is enough to communicate for security monitoring system in apartment house building.

  • PDF

A Study on the Activities and Decision Factors between In-house vs. Outsourcing Reverse Logistics Processes (역물류(Reverse Logistics)의 아웃소싱을 위한 연구)

  • Kim, Young-Ah
    • Proceedings of the Korean DIstribution Association Conference
    • /
    • 2006.08a
    • /
    • pp.119-131
    • /
    • 2006
  • Reverse logistics (RL) covering the flow of products/parts in a reverse direction from product returns to product disposal. Companies are faced with a decision on whether to manage RL in house or to outsource it to a RL third party service provider (3PSP). A survey was conducted in 2004 to study RL outsourcing practices. Through the survey, various RL functions outsourced in industry are identified, and the factors considered to decide between in-house vs. outsourcing RL management are studied along with their importance. In addition, this research presents the performance measures of a 3PSP and problems faced by companies while managing RL in-house and outsourcing.

  • PDF

A Study on Needs of User for Community Facilities -Through P.O.E.(Post Occupancy Evaluation) in House of Culture, Gwua-Chun City- (주민의 지역시설 이용의식에 관한 연구 -과천시 문화의 집 이용자의 사용후 평가를 중심으로-)

  • Lee, Eul-Gyu
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.3 no.3
    • /
    • pp.1-9
    • /
    • 2001
  • The purpose of this paper is to investigate the user distribution and the accessibilities, and the factors restricting the use of House of Culture, Gwua-Chun city, and to discuss and propose an improved management for House of Culture. The survey and analyses in this paper have showed some considerable aspects of House of Culture. Smaller culture facilities are more effective with respects to the programs and the use of rooms. Most of users of the facilities are housewives and retired old people because those who have jobs can not use in the daytime when the facilities are open. Many cases of House of Culture are parts of village offices, libraries, and culture centers. The rooms are very efficiently composed. Users of House of Culture want larger space facilities and lecture programs for health and sports.

  • PDF

Distribution of Wind Force Coefficients on the Three-span Arched House (아치형 3연동하우스의 풍력계수 분포에 관한 연구)

  • 이현우;이석건
    • Journal of Bio-Environment Control
    • /
    • v.2 no.1
    • /
    • pp.46-52
    • /
    • 1993
  • The wind pressure distributions were analyzed through the wind tunnel experiment to provide fundamental criteria for the structural design on the three-span arched house according to the wind directions. In order to investigate the wind force distribution, the variation of the wind force coefficients, the mean wind force coefficients, the drag force coefficients and the lift force coefficients were estimated from the experimental data. The results obtained are as follows : 1. The variation of the wind force with the wind directions on the side walls was the greatest at the upwind edge of the walls. The change of pressure from the positive to the negative on the side walls occurred at the wind direction of 30$^{\circ}$ in the first house and 60$^{\circ}$ in the third house. 2. The maximum negative wind force along the length of the roof appeared at the length ratio of 0-0.2, when the wind directions were 90$^{\circ}$ in the first house, 60$^{\circ}$ in the second house and 30$^{\circ}$ in the third house. 3. The maximum negative wind force along the width of the roof appeared at the width ratio and the wind direction of 0.4 and 0$^{\circ}$ in the first house, 0.4-0.6 and 30$^{\circ}$ in the second house and 0.6 and 30$^{\circ}$ in the third house, respectively. 4. The maximum mean positive and negative wind forces occurred at the wind direction of 60$^{\circ}$ and 30$^{\circ}$, respectively, on the side walls of the first house, and the maximum mean negative wind force on the roof occurred at the wind direction of 30$^{\circ}$ in third house. 5. The maximum drag and lift forces occurred at the wind direction of 30$^{\circ}$, and the maximum lift force appeared in the third house. 6. The parts to be considered for the local wind forces were the edges of the walls, the edges of the x-direction of the roofs, and the locations of the width ratio of 0.4 of the first and third house and the center of the width of the second house for the y-direction of the roofs.

  • PDF

Stress variation analysis based on temperature measurements at Zhuhai Opera House

  • Lu, Wei;Teng, Jun;Qiu, Lihang;Huang, Kai
    • Structural Monitoring and Maintenance
    • /
    • v.5 no.1
    • /
    • pp.1-13
    • /
    • 2018
  • The Zhuhai Opera House has an external structure consisting of a type of spatial steel, where the stress of steel elements varies with the ambient temperature. A structural health monitoring system was implemented at Zhuhai Opera House, and the temperatures and stresses of the structures were monitored in real time. The relationship between the stress distribution and temperature variations was analysed by measuring the temperature and stresses of the steel elements. In addition to measurements of the structure stresses and temperatures, further simulation analysis was carried out to provide the detailed relationship between the stress distributions and temperature variations. The limited temperature measurements were used to simulate the structure temperature distribution, and the stress distributions of all steel elements of the structure were analysed by building a finite element model of the Zhuhai Opera House spatial steel structure. This study aims to reveal the stress distributions of steel elements in a real-world project based on temperature variations, and to supply a basic database for the optimal construction time of a spatial steel structure. This will not only provide convenient, rapid and safe early warnings and decision-making for the spatial steel structure construction and operation processes, but also improve the structural safety and construction accuracy of steel space structures.

The Effect of the Reduction in the Interest Rate Due to COVID-19 on the Transaction Prices and the Rental Prices of the House

  • KIM, Ju-Hwan;LEE, Sang-Ho
    • The Journal of Industrial Distribution & Business
    • /
    • v.11 no.8
    • /
    • pp.31-38
    • /
    • 2020
  • Purpose: This study uses 'Autoregressive Integrated Moving Average Model' to predict the impact of a sharp drop in the base rate due to COVID-19 at the present time when government policies for stabilizing house prices are in progress. The purpose of this study is to predict implications for the direction of the government's house policy by predicting changes in house transaction prices and house rental prices after a sharp cut in the base rate. Research design, data, and methodology: The ARIMA intervention model can build a model without additional information with just one time series. Therefore, it is a time-series analysis method frequently used for short-term prediction. After the subprime mortgage, which had shocked since the global financial crisis in April 2007, the bank's interest rate in 2020 is set at a time point close to zero at 0.75%. After that, the model was estimated using the interest rate fluctuations for the Bank of Korea base interest rate, the house transaction price index, and the house rental price index as event variables. Results: In predicting the change in house transaction price due to interest rate intervention, the house transaction price index due to the fall in interest rates was predicted to change after 3 months. As a result, it was 102.47 in April 2020, 102.87 in May 2020, and 103.21 in June 2020. It was expected to rise in the short term. In forecasting the change in house rental price due to interest rate intervention, the house rental price index due to the drop in interest rate was predicted to change after 3 months. As a result, it was 97.76 in April 2020, 97.85 in May 2020, and 97.97 in June 2020. It was expected to rise in the short term. Conclusions: If low interest rates continue to stimulate the contracted economy caused by COVID-19, it seems that there is ample room for house transaction and rental prices to rise amid low growth. Therefore, In order to stabilize the house price due to the low interest rate situation, it is considered that additional measures are needed to suppress speculative demand.