• Title/Summary/Keyword: Ho-Nam high speed railroad on 1 stage

Search Result 2, Processing Time 0.017 seconds

A Study on the Loss and Damage Ratio of Railroad Tunnel Maintenance Monitoring Sensor (철도터널 유지관리 계측센서의 손망실율 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.3
    • /
    • pp.262-270
    • /
    • 2018
  • Purpose: This paper investigates and analyzes the loss and damage ratio of maintenance monitoring sensor in metropolitan and high speed railroad tunnel in Korea and abroad. Method: After 5~6 years from the installation, the maintenance monitoring sensor on metropolitan transit tunnels showed the loss and damage ratio from 14.2% to 14.8% in Seoul metro line no. 5, 6, 7, 9, and 13.9% in UK channel tunnel. Based on the result, 15% is thought to be a proper set for the elapsed years, which is 5 years from the installation. Results: The maintenance monitoring sensor on high speed railroad tunnels showed the loss and damage ratio of 60.9% in Ho-Nam high speed railroad on 1 stage after 3 ~ 5 years from the installation, which was approximately 4 times as high as that of Seoul metro line no. 5, 6, 7, 9. Conclusion: Kyung-Bu high speed railroad on 2 stage, after 8~10 years from the installation, showed the loss and damage ratio of 66.8%. Based on the result, it can be inferred that the loss and damage ratio increases drastically after 5~10 years from the installation. Therefore, it is necessary to study on the loss and damage ratio of long term elapsed years, especially more than 10 years from the installation.

A study on railway logistic transportation efficiency through constructing roundabout route of the Kyung-Bu railroad (경부선 우회선로 구축을 통한 철도화물운송 효율화 방안 연구)

  • Kim, Jong-Tae;Choo, Jun-Sup;Moon, Dae-Seop;Yoo, Jae- Kyun;Lee, Jun;Oh, Seok-Moon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.657-665
    • /
    • 2008
  • The main transportation mode of long distance inter-city passenger trips is high-speed rail and the modal share of transportation has been changed profoundly since the KTX service has been started in the Kyung-Bu railroad transportation corridor in the day of 1 April, 2004. After an opening of KTX service in the second stage Kyung-Bu and Ho-Nam railroad transportation corridors, a capacity of incumbent railroads will be increased and operational environments of freight train will be improved. The purpose of this paper is to examine the impact of KTX service operation on the national logistics thoroughly. This paper establishes a deceptive scheme in the national railroad logistic transportation and a route operational strategy between the main origins and destinations efficiently considering the changes of the current freight transportation system in the future. We expect to achieve efficiency of logistic transportation in this paper through alternative routes for example Ho-Nam, Chang-Hang, Seo-Hae line.

  • PDF