• 제목/요약/키워드: Highspeed Railway

검색결과 37건 처리시간 0.026초

초고속자기부상열차 절대위치검지시스템 인식구조 설계 및 분석 (The Design and Analysis of Recognition Structure for Absolute Train Positioning System of High-speed Maglev Train System)

  • 신경호;신덕호;이재호;이강미
    • 한국철도학회논문집
    • /
    • 제14권2호
    • /
    • pp.116-120
    • /
    • 2011
  • 현재 초고속 자기부상열차시스템에 적용하고 있는 위치검지기술은 불연속적으로 열차위치를 파악하는 절대위치검지기술과 연속적으로 열차의 위치를 파악하는 상대위치검지기술로 구분된다. 본 논문에서는 대표적인 초고속자기부상열차인 독일 Transrapid에 적용된 절대위치검지장치의 구조와 수치모델을 분석하고, Transrapid에 적용된 절대위치검지장치와 유사한 구조를 가지는 절대위치검지장치의 인식구조별 모델을 설계하고 시뮬레이션을 통해 설계한 모델의 적합성을 검증하고 최적의 절대위치검지장치 구조를 제안한다.

KTX 차량 후미진동 해석(I) (Dynamic Analysis of KTX Vibration at the Tail of the Train)

  • 강부병;김영우;왕영용
    • 한국철도학회논문집
    • /
    • 제6권2호
    • /
    • pp.122-128
    • /
    • 2003
  • The acceptance test of KTX has been performed in Korea. During the test, lateral vibration of carbody over the accepted value called sway was found. Many activities have been taken to find the cause of the vibration and the counter-measure. KTX has 20 car trainset formation whose trailer cars are linked by articulate bogies. So this study is performed to see the effects of long trainset formation on vehicle dynamics and the train stability by 16 car vehicle model. Firstly the reliable vehicle model which shows well the tendencies appeared in the tests on the high speed test line is required to find the cause of lateral vibration and the countermeasure. Vehicle model was made for the analysis with VAMPIRE. The analysis results show that secondary air spring lateral stiffness is the most significant parameter to cause carbody lateral vibration. Mode analysis results show that the least damped mode shape is similar to the vibration pattern shown in the tests that the amplitude of the motion increases along the train set and decreases in the tail part. The lateral vibration was "appeared at the speed range between 100km/h and 200km/h and disappeared at the low speed and the high speed.

통합 차상신호장치 테스트용 시뮬레이터 개발 (The Development of Simulator for Integrated Onboard Signalling System(IOSS))

  • 김석헌;한재문;박탄세;조용기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.363-367
    • /
    • 2011
  • In this paper a simulator for Integrated Onboard Signalling System(IOSS) will be presented and illustrated. IOSS which is integrated with there signalling systems such as ERTMS/ETCS Level 1 ATP(Automatic Train Protection), ATC(Automatic Train Control) and ATS(Automatic Train Stop) is a signalling system for HEMU-400X(Highspeed Electric Multiple Unit - 400km/h eXperiment). HEMU-400X is under development as the next generation high-speed train in Korea. Before conducting a trial run of HEMU-400X with IOSS, we must carry out functional test of IOSS. The simulator is suggested in this paper for testing and verification of IOSS. The simulator can help to test all function of IOSS although a real train and trackside equipments are not existed. Also the simulator can make a fault in trackside equipment intentionally. In that scenario, we can figure out how IOSS handle emergency situations.

  • PDF

A Study of Tilting Train Signal System for Conventional Rail Speed-Up

  • Han, Seong-Ho;Lee, Su-Gil;Ko, Tae-Hwan;Song, Yong-Soo;Han, Young-Jae
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2003년도 ICCAS
    • /
    • pp.1741-1744
    • /
    • 2003
  • This study is a kind of preliminary research in order to propose and suggest the plan of performance improvement for the speed-up through the examination of operational condition on the field for signal system facility on the conventional railway, in order to obtain the elemental technology from the technical development for utilization of high speed train which will be run on the Korea Conventional Line and, finally, in order to propose the specification of signal system using for high speed and the scheme of establishment for the optimal signal system.

  • PDF

이중 복합터널 상부구조물의 진동에 대한 안정성 평가 (Estizmation of Structure Stability on the Ground to Vibration from Dual Composite Tunnels)

  • 신승목;장연수;이우진;권순정
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1244-1250
    • /
    • 2008
  • The site of interest is a residence redevelopment area which has excavation construction with cut-off walls. The site is located over Dong-Mang-Bong tunnel and Seoul No. 6 subway tunnel. This study analyzed numerically the influence of vibrations from No. 6 subway tunnel to the basement of the redeveloped apartment away from the distance about 11m. Kyoung-bu highspeed railway's time history model with linearly reduced maximum acceleration is applied to take into the subway maximum speed of 75km/h. The maximum velocity of vibration for the cross section of the interest was estimated as 0.28cm/sec which satisfied the allowable standard of 0.5cm/sec for apartment and residence of Seoul.

  • PDF

고속전철 급전계통에서의 고조파 측정 방안 (Scheme for Harmonics measurement in feeding System of high speed railroad)

  • 최흥관;황치우;윤재영
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 추계학술대회 논문집 학회본부A
    • /
    • pp.304-307
    • /
    • 1998
  • High speed railway is under construction from Seoul to Pusan. A traveling train is large single phase load that consumes 14MW power in feeding system of high speed railroad. In this paper, measurement scheme and method of power system harmonics which are generated from those loads in railroad supply system are described. This measurement scheme will be used as a first step to pave a way to power quality management due to harmonic distortion by the highspeed rail way.

  • PDF

서울일대 암반을 대상으로 한 Geotechnical Information System (GTIS)의 개발 및 활용 (2) (A Development and utilization of Geotechnical Information System(GTIS) of the Rock Mass in Seoul Metropolitan Area(2))

  • 김정엽;박형동
    • 터널과지하공간
    • /
    • 제6권3호
    • /
    • pp.223-233
    • /
    • 1996
  • Geotechnical Information System (GTIS) for efficient management of three dimensional borehole data has been developed. Geotechnical maps in the vicinity of Bulkwangdong, Seoul station, Itaewon, Han river near Yuido, and Jungrangchon were constructed by Kriging method. In Bulkwangdong and Jungrangchon area where boundary between granite and gneiss is present, gneiss has been more weathered than granite, but in Seoul station and Itaewon area where the boundary is also present, granite has been more weathered than gneiss. It has been inferred that when Seoul granite intruded, the strength of gneiss in Bulkwangdong and Jungrangchon area was lowered by the attitude of foliation plane than in Seoul station and Itaewon area, so the gneiss has been easily fractured and weathered in Bulkwangdong and Jungrangchon area. Geotechnical map in the vicinity of Yuido showed that there is an NW-SE trend weakness zone that might be affected by major faults under Han river and it is expected that the fault zone may be present in construction area of Kyoungbu Highspeed Railway that lies below the Han river like the Subway Line No.5.

  • PDF

전단응력비 개념에 기초한 강화노반의 영구변형 모델 수립 (Development of A Permanent Deformation Model based on Shear Stress Ratio for Reinforced-Roadbed Materials)

  • 임유진;이성혁;김대성;박미연
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2049-2056
    • /
    • 2011
  • The reinforced-roadbed materials composed of crushed stones are used for preventing vertical deformation and reducing impact load caused by highspeed train. Repeated load application can induce deformation in the reinforced-roadbed layer so that it causes irregularity of track. Thus it is important to understand characteristics of permanent deformation in the reinforced-subbase materials. The characteristics of permanent deformation can be simulated by prediction model that can be obtained by performing repetitive triaxial test. The prediction model of permanent deformation is a key-role in construction of design method of track. The prediction model of permanent deformation is represented in usual as the hyperbolic function with increase of number of load repetition. The prediction model is sensitive to many factors including stress level etc. so that it is important to define parameters of the model as clearly as possible. Various data obtained from repetitive triaxial test and resonant column test using the reinforced-roadbed of crushed stone are utilized to develop a new prediction model based on concept of shear-stress ratio and elastic modulus. The new prediction model of permanent deformation can be adapted for developing design method of track in the future.

  • PDF

국내 TBM굴진속도 산정을 위한 경험적 방법들의 적용성 분석 (Applicability Analysis of Empirical Methods for the Calculation of TBM Advance Rate)

  • 조만섭;우동찬;김경곤;이진무
    • 터널과지하공간
    • /
    • 제13권4호
    • /
    • pp.260-269
    • /
    • 2003
  • In order to introduce to engineers the suitable calculation techniques of TBM advance rate (ad.) and ultimately promote to understand the designing process, this study was carried out. We analyzed the 17 bored data of TBM which applied to the roadway and water supply tunnels in Korea. From this analysis, it was able to how that the average utilization is 30.83% md the correlation equation of Ad and TBM´s diameter (D) is Ad(m/month) = 506.05ㆍ $e^{-0.1162}$$\times$D than the correlation coefficient ($R^2$) is 0.76. In the object of the W tunnel of Seoul-Busan highspeed railway, the Ad of TBM 5.0mø was analyzed by the variety of empirical models and upper correlation equation. Average Ad of the empirical models was calculated to be larger than one of the upper equations. But considering only the results of 3.0~5.0mø TBM in the 17 bored data, the average Ad by the models belongs to the similar range of bored data. Therefore, when the reliability and representative of parameters are decreased, a reliability test should be carried out through the comparison a variety of empirical models with the upper correlation equation.

GTX의 효율적인 운영을 위한 국외사례를 통한 국내 적용성 검토 (The Study on Domestic Applicability through Overseas Cases for Efficient Operation of GTX)

  • 위정수;김현성;박민주;박정수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.745-755
    • /
    • 2010
  • GTX(Great Train Express), the wide area express train of a big city center of metropolitan area, is the best new transportation method able to realize 'Low Carbon Green Growth' for solving traffic congestion of the metropolitan area with the connection the metropolitan area into 40-minute life zone by speeding up the standardized velocity, making the route straight and reducing the compensation of land using the space of 40~50m below the ground. In the transportation sector all over the world, if it turned into the public transportation system focusing on the train at a point of time that low carbon green revolution takes the initiative, national competitiveness would be enhanced by reducing the emission of carbon from cars by 1/6. Accordingly, this study is to look into the efficient operation in accordance with GTX construction superintended by currently Gyeonggi province and to consider the optimum operation plan of GTX that are proper for the actual circumstances of the country by comparatively analyzing overseas cases that took their positions as new transportation by curtailment of transit time through highspeed such as London area, Paris area, and Tokyo area etc that are similar to Korean metropolitan area.

  • PDF