• 제목/요약/키워드: High-voltage (HV) withstand

검색결과 6건 처리시간 0.03초

HVAC에 의한 On-line, Off-line PD 모니터링 (On-line and Off-line Partial Discharge Monitoring System with HVAC Testing)

  • 최용성;이경섭
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2008년도 춘계학술대회 논문집 센서 박막재료연구회 및 광주 전남지부
    • /
    • pp.111-114
    • /
    • 2008
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

전력 설비 시스템의 온라인 감시 (On-line Condition Monitoring for Electric Equipments)

  • 최용성;이경섭
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2008년도 춘계학술대회 논문집 센서 박막재료연구회 및 광주 전남지부
    • /
    • pp.103-105
    • /
    • 2008
  • In, this paper, we consider the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PO) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PO testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PO measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

온라인 및 오프라인 PD 모니터링에 관한 연구 동향 (A Research Trend on On-Line/Off-Line PD Insulation Diagnostic System)

  • 추종훈;홍창일;최용성;이경섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.2008-2009
    • /
    • 2007
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is introduced.

  • PDF

배전반 설비의 온라인 모니터링 및 진단의 동향 (Trend in Off-Line PD Monitoring with HVAC Testing)

  • 윤주효;홍창일;황종선;최용성;이경섭
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2007년도 하계학술대회 논문집 Vol.8
    • /
    • pp.529-530
    • /
    • 2007
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

온라인 부분방전 감시 시스템 (On-Line System for Partial Monitoring Discharge)

  • 최용성;황종선;이경섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.2114-2115
    • /
    • 2008
  • We consider the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers is described.

  • PDF

초고압 XLPE 전력케이블에 대한 설치후 교류내전압시험 현장적용 (Field Application of AC High Voltage Test after Installation for EHV XLPE Power Cables)

  • 김영;권병일;성정규;한창석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 C
    • /
    • pp.1768-1770
    • /
    • 2001
  • EHV power cables can take any damage during shipping, transportation, handling, storage and installation. As the damage influences a reliability of the power cable system in the short and long periods, field tests have been required, for installers, to confirm the reliability of an installed system and, for utilities, to make sure the compatibility of an installed system. Of field tests, a HV withstand test for the cable insulation has been performed to check the soundness of the insulation. For EHV XLPE power cables, the test has been done by applying a specified d.c voltage till lately. But as some problems with the d.c test is emphasized and the equipment for the a.c test is improved, the a.c test is considered positively as an after-installation test. This paper describes the recent trends of the a and its recent application in the field.

  • PDF