• Title/Summary/Keyword: High-speed rail

Search Result 819, Processing Time 0.027 seconds

A Comparative Study on the Performance of High Pressure Fuel Pumps for Compression Ignition Engines Fueled by DME (DME를 연료로 하는 압축 착화 엔진용 고압연료 펌프의 성능 비교 연구)

  • JAEHEE JEONG;WONJUN CHO;OCKTAECK LIM
    • Journal of Hydrogen and New Energy
    • /
    • v.34 no.1
    • /
    • pp.59-68
    • /
    • 2023
  • In this study, the performance of high-pressure fuel pumps was compared to find a high-pressure pump suitable for dimethyl ether (DME) fuel, and to establish a database of basic data on flow rates. The use of DME in compression ignition engines can reduce pollutant emissions. The cetane value of DME is higher than that of diesel fuel. The physical properties of DME are similar to liquefied gasoline gas (LPG), and when pressurized at a pressure of 6 bar or more, it changes from gas to liquid. Two types of high pressure pumps used in this study were independent injection type pump and a wobble plate type pump. Two high-pressure pumps with different injection types were compared. By measuring and comparing the performance changes of the two high-pressure pumps, a pump suitable for DME was selected and performance improvement measures were proposed. The changed experimental conditions to measure the performance change of the high pressure pump were increased in the units of 100 to 1,000 rpm and 100 rpm, and the experiment was performed at common rail pressures 300 and 400 bar. it was confirmed that the DME inside the fuel supply system remained in a liquid state through temperature sensors, pressure sensors, and pressure gauges. As a result of the experiment, it was confirmed that the flow rate discharged from the high-pressure fuel pump increased as the motor rotational speed increased, and the flow rate of the high-pressure fuel pump

A study on the characteristics of Vibration Reduction Type Disk bearing in Station of Rapid Transit Railway (역사 내 진동저감형 디스크 받침 특성에 관한 연구)

  • Park, Tae-Hyun;Park, Hean-Sang;Kim, Ho-Bae;Choi, Jin-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.297-302
    • /
    • 2011
  • Railway construction in the random vibration natural phenomena, as well as a relatively regular train loads for dynamic loads, such as a usability and safety should be ensured. Vibration due to train loads and seismic vibrations caused by wind compared to the typically very small in size, rather than the safety of the structure affects the usability. Recently in the downtown area, ground and underground facilities, such as a permanent facility that may cause excessive vibration increases, associated with the construction of these transportation facilities on ground vibrations of structures has been increasing concern and complaint. More recently, high-speed train vibration and noise due to furnace is increasing. In order to solve this problem, such as soundproof considering several feet, but by applying the vibration and noise reduction measures insufficient for the study is Free. In this study, track structure, track, and the inside of the building to support the system, the different forms of neurological history and share about the history cheonanahsan high-speed rail, if passed by the bus stop on the train loads of noise, and the history of interior noise and vibration measurement / analysis of measurement results to assess the relative comparison with the relevant provisions were reviewed. Based on this history, future plans for the design of the bridge to reflect the results of a study is intended to provide information. Waiting for the analysis of vibration and noise reduction, cheonanahsan history passed quietly in the train, on average, appeared to 67.53dB and 65.41dB nervous week on average, were measured with the history. Nervous week waiting room of history and the history cheonanahsan radically different shapes and sizes, so a direct comparison is impossible, but the vibration caused by the disc on the base of the polyurethane elastomer disk is not supported by GERB SYSTEM Waiting more effective in reducing the noise level considered in The main materials for railway and for the localization will help to ensure affordability is considered.

  • PDF

Train-Structure Dynamic Interaction Analysis of The Bridge Transition Considering Track Irregularity (궤도틀림을 고려한 교대접속부의 열차상호동적거동해석)

  • Choi, Chan-Yong;Kim, Hun-Ki;Chung, Keun-Young;Yang, Sang-Beom
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.9
    • /
    • pp.29-38
    • /
    • 2015
  • In this study, track dynamic interaction characteristics caused by the vehicle running through transitional section such as bridge abutments were studied using the finite element analysis program. The geometric condition of track was generated by trigonometric function and allowable maximum track irregularity is determined by KORAIL track maintenance criteria. The sub-infrastructure under rail fastener system was modelled by 3D solid elements. To reduce computational cost only half track line is numerically considered and the roller boundary condition was applied to each side of model. In this study, the vehicle-track dynamic interaction analysis was carried out for standard Korean transition section of concrete track and the dynamic behaviors were investigated. The dynamic characteristics considered are wheel load variation, vertical acceleration at body, and maximum Mises stress at each part of transitional section.

A Study on Efficient Rolling Stock HBD Monitoring Method Using EWMA Technique (EWMA 기법을 적용한 효율적 철도차량 차축온도검지 모니터링 방법 연구)

  • Choi, Seog-Jung;Kim, Moon-Hong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.609-617
    • /
    • 2017
  • Railways are one of the safest and most important transportation systems in the world. On the other hand, due to the increasing complexity of the railway system and the running distance of rail vehicles, railway accidents occur continuously every year. In particular, in the case of high-speed trains and freight trains, if the function of the axle bearing is lost due to abnormal overheating of the axle box bearing, the load on the axle becomes uneven. Therefore, abnormal overheating in the train axle box bearings can cause serious accidents or derailments. For this purpose, a Hot Box Detector (HBD) was installed in the track side of a high speed line to detect abnormal overheating. This paper proposes an EWMA technique-based axle temperature monitoring method to detect abnormal overheating quickly and efficiently. A statistical design of the proposed method was also performed. The proposed method has better performance compared to the current method in the case of abnormal overheating and the performance is improved by approximately 170% at the maximum.

A study on implementation of optical high-speed multiplier using multiplier bit-pair recoding derived from Booth algorithm (Booth 알고리즘의 승수 비트-쌍 재코딩을 이용한 광곱셈기의 구현에 관한 연구)

  • 조웅호;김종윤;노덕수;김수중
    • Journal of the Korean Institute of Telematics and Electronics D
    • /
    • v.35D no.10
    • /
    • pp.107-115
    • /
    • 1998
  • A multiplier bit-pair recoding technique derived from Booth algorithm is used as an effective method that can carry out a fast binary multiplication regardless of a sign of both multiplicand and multiplier. In this paper, we propose an implementation of an optical high-speed multiplier which consists of a symbolic substitution adder and an optical multiplication algorithm, which transforms and enhances the multiplier bit-pair recoding algorithm to be fit for optical characteristics. Specially, a symbolic substitution addition rules are coded with a dual-rail logic, and so the complement of the logic of the symbolic substitution adder is easily obtained with a shift operation because it is always present. We also construct the symbolic substitution system which makes superposition image by superimposing two shifted images in a serial connection and recognizes a reference image by feeding this superimposed image to a mask. Thus, the optical multiplier, which is compared with a typical system, is implemented to the smaller system by reducing the number of optical passive elements and the size of this system.

  • PDF

Harmonic Analysis for Traction Power Supply System Using Four-Port Network Model (6단자망 회로모델을 이용한 전기철도 급전시스템의 고조파 해석)

  • Chang, Sang-Hun;O, Gwang-Hye;Kim, Ju-Rak;Kim, Jeong-Hun
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.6
    • /
    • pp.255-261
    • /
    • 2002
  • Recently, traction motors in trains are supplied with single phase a.c. power. After this power is converted to d.c. power, it is inverted to three phase power to operate traction motors. As going through the process of the conversion, harmonic current is generated in train. The method of conventional analysis on harmonics, studied by RTRI, is modeled with equivalent circuit of ac AT-fed electric railroad system using by the distributed constant circuit. However, this circuit as two-port network model has some difference in comparison with real system. The reason why the conventional method is different from the real system is that the conventional method dose not include three conductor groups, that is catenary, rail, and feeder, and admittance between the conductors for line capacitance. Therefore, this method has a little error. This paper proposes new method to more effectively estimate Harmonic current. In this method, numerous components in electric railway are categorized and each component is defined as a four- port network model. The equivalent circuit for the entire power supply system is also described into a four-port network model with connections of these components. In order to evaluate the efficiency and the accuracy of a proposed method, it is compared with values measured in Kyung-Bu high speed line and ones calculated by the conventional method.

A Study on Combustion and Emission Characteristics in Compression Ignition CRDI Diesel Engine (직접분사식 압축점화 디젤엔진의 연소 및 배기특성에 관한 연구)

  • Kim, Gi-Bok;Choi, Il-Dong;Ha, Ji-Hoon;Kim, Chi-Won;Yoon, Chang-Sik
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.17 no.4
    • /
    • pp.234-244
    • /
    • 2014
  • Recently it has been focused that the automobile engine has developed in a strong upward tendency for the use of the high viscosity and poorer quality fuels in achieving the high performance, fuel economy, and emission reduction. Therefore it is not easy to solve the problems between low specific fuel consumption and exhaust emission control at motor cars. In this study, it is designed and used the engine test bed which is installed with turbocharger and intercooler. In addition to equipped using CRDI by controlling injection timing with mapping modulator, it has been tested and analyzed the engine performance, combustion characteristics, and exhaust emission as operating parameters, and they were engine speeds(rpm), injection timing(bTDC), and engine load(%). From the result of an experimental analysis, peak cylinder pressure and the rate of pressure rise were increased, and the location of it was closer toward top dead center according to the increasing of engine speed and load, and with advancing injection timing. The combustion characteristics are effected by fuel injection timing due to be enhanced the mass burned fraction. Using the engine dynamometer for analyzing the engine performance, the engine torque and power have been enhanced according to advancing the fuel injection timing. In analyzing of exhaust emission, there has been a trade-off between PM and NOx with increasing of engine speed and load, and with advanced injection timing. The experimental data are shown that the formation of NOx has increased and PM, vice versa.

Arrival Delay Estimation in Bottleneck Section of Gyeongbu Line (철도선로용량 부족에 따른 지체발생 연구 - 경부선 서울~금천구청 구간을 대상으로)

  • Lee, Jang-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.4
    • /
    • pp.374-390
    • /
    • 2015
  • This research shows the relationship between the number of trains and the probability of trains with arrival delay and suggests way to estimate the benefits of improved punctuality in a bottleneck section of the Gyeongbu Line. The arrival delays of high-speed and conventional trains were estimated using the train operation data of KORAIL. Linear regression models for the probability of trains with arrival delay by train type are presented in this paper. The probabilities of trains with arrival delay were more affected by the number of conventional trains than by the number of high-speed rail trains. For the empirical analysis, a project for increasing the capacity in the Seoul~Geumcheongu office section was tested. The benefits of the improved punctuality were estimated to be 4.2~4.5 billion Korean won every year. This research has some limitations but it can help evaluate more precisely the feasibility of the project of increasing the capacity in bottleneck sections.

A mechanical model of vehicle-slab track coupled system with differential subgrade settlement

  • Guo, Yu;Zhai, Wanming;Sun, Yu
    • Structural Engineering and Mechanics
    • /
    • v.66 no.1
    • /
    • pp.15-25
    • /
    • 2018
  • Post-construction subgrade settlement especially differential settlement, has become a key issue in construction and operation of non-ballasted track on high-speed railway soil subgrade, which may also affect the dynamic performance of passing trains. To estimate the effect of differential subgrade settlement on the mechanical behaviors of the vehicle-slab track system, a detailed model considering nonlinear subgrade support and initial track state due to track self-weight is developed. Accordingly, analysis aiming at a typical high-speed vehicle coupled with a deteriorated slab track owing to differential subgrade settlement is carried out, in terms of two aspects: (i) determination of an initial mapping relationship between subgrade settlement and track deflections as well as contact state between track and subgrade based on a semi-analytical method; (ii) simulation of dynamic performance of the coupled system by employing a time integration approach. The investigation indicates that subgrade settlement results in additional track irregularity, and locally, the contact between the concrete track and the soil subgrade is prone to failure. Moreover, wheel-rail interaction is significantly exacerbated by the track degradation and abnormal responses occur as a result of the unsupported areas. Distributions of interlaminar contact forces in track system vary dramatically due to the combined effect of track deterioration and dynamic load. These may not only intensify the dynamic responses of the coupled system, but also have impacts on the long-term behavior of the track components.

Technical Study on Possibility of an Express Service Wide Area Railway (광역철도 노선의 급행화 가능성에 대한 기술적 검토)

  • Park, Jung Hyun
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.5
    • /
    • pp.612-624
    • /
    • 2017
  • As the existing metropolitan area metropolitan railway operates on a one-to-one basis, which leads to long travel times, its competitiveness with other means of transportation is deteriorating. Since there is a limit to attracting road traffic by rail, there is a continuing societal demand to expand express train service. Especially in the northern and the southwestern parts of the metropolitan area, a public transportation network system with express function, connecting to the city center of Seoul, is needed because of the social cost of the increase of traffic congestion and the increase of the travel time. The most efficient express service in Korea is Seoul Subway Line 9, which runs in 27 minutes from Gimpo Airport to the high speed terminal; this is a 40% shorter time compared to 44 minutes by car; the congestion in this area is up to 240%, so the preference for this train is quite high. The technical results of this study are expected to contribute to the implementation of an express service metropolitan railway.